{
  "schema_version": 1,
  "source_compilation_context": {
    "ia": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ia.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "19049",
    "label": "Dallas County, Iowa"
  },
  "records": [
    {
      "id": "apple-waukee-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Apple Waukee Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Waukee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "host": "www.apple.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.6848,
        "lng": -94.03964,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_reported_opened_facility_month_only_not_entire_future_campus",
              "scope": "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted."
            },
            "source_read_scope": {
              "pdf_page_visually_read": 97,
              "corroborating_pdf_footnote_page_read": 95,
              "reported_opening_month": "October 2024",
              "exact_opening_day_unknown": true,
              "future_expansion_not_certified_operating": true,
              "energy_allocation_not_independent_environmental_finding": true
            }
          },
          "notes": [
            "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
              "host": "www.apple.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Waukee · Dallas · Source context reviewed",
      "status_scope": "Apple 2026 Environmental Progress Report explicitly says it opened a data center in Waukee in October 2024. The Waukee section on PDF page 97 was visually read and the same month appears in the PDF page 95 footnote. Operating phase is limited to the opened facility described by Apple, not all planned campus buildings or future expansion. October 2024 remains a month only statement and is not converted to an exact opening date or timeline day. Renewable energy accounting, electricity quantities, claimed avoided emissions and environmental benefits are not independently certified or promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    },
    {
      "id": "copt-defense-properties-van-meter-ia",
      "state": "ia",
      "kind": "facility",
      "name": "COPT Defense Van Meter Data Center Shell Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Van Meter",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. COPT Iowa land acquisition versus potential development. 32Mlandpurchaseactualreported,notcampusconstructioncapex.1GWestimatednotcontracted/energized/criticalIT.80k-sqft17MSanAntonioofficeacquisitionseparateunrelatedproperty. NoexactVanMeterparcelmunicipalitymatchorallpermitsread. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-10-28",
          "COPT Defense published its Des Moines area land acquisition and future shell development announcement October 28, 2024. Initial plans, zoning and estimated future capacity are not an accomplished data center construction start or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell",
          "host": "investors.copt.com",
          "date": "2024-10-28",
          "published": "2024-10-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.69697,
        "lng": -94.05292,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "COPT Iowa land acquisition versus potential development",
          "fields": {
            "issuer": "COPT Defense Properties",
            "historical_land_acquisition_month": "2024-09",
            "land_acres": 365,
            "land_purchase_usd": 32000000,
            "locality": "near Des Moines, Iowa",
            "planned_development_sqft_approx": 3300000,
            "estimated_power_capacity_gw": 1,
            "power_basis": "estimated development power, not explicit IT",
            "issuer_described_zoning": "allows data center development"
          },
          "notes": [
            "32Mlandpurchaseactualreported,notcampusconstructioncapex.1GWestimatednotcontracted/energized/criticalIT.80k-sqft17MSanAntonioofficeacquisitionseparateunrelatedproperty. NoexactVanMeterparcelmunicipalitymatchorallpermitsread.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell",
              "host": "investors.copt.com",
              "date": "2024-10-28",
              "published": "2024-10-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "COPT Defense October 28, 2024 announcement reports its land purchase near Des Moines and initial long term data center shell development plans. The company statement that existing zoning allows development is not an individual building permit or evidence of current physical construction. A later current physical milestone for the inherited Van Meter component was not captured. The separate San Antonio building acquisition in the same release is excluded. Current phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historic_land_acquisition_and_shell_plan_without_current_physical_milestone",
              "scope": "COPT Defense October 28, 2024 announcement reports its land purchase near Des Moines and initial long term data center shell development plans. The company statement that existing zoning allows development is not an individual building permit or evidence of current physical construction. A later current physical milestone for the inherited Van Meter component was not captured. The separate San Antonio building acquisition in the same release is excluded. Current phase remains unclear."
            }
          },
          "notes": [
            "COPT Defense October 28, 2024 announcement reports its land purchase near Des Moines and initial long term data center shell development plans. The company statement that existing zoning allows development is not an individual building permit or evidence of current physical construction. A later current physical milestone for the inherited Van Meter component was not captured. The separate San Antonio building acquisition in the same release is excluded. Current phase remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell",
              "host": "investors.copt.com",
              "published": "2024-10-28",
              "date": "2024-10-28",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Van Meter · Dallas · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-10-28",
          "text": "COPT Defense published its Des Moines area land acquisition and future shell development announcement October 28, 2024. Initial plans, zoning and estimated future capacity are not an accomplished data center construction start or operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell",
              "host": "investors.copt.com",
              "published": "2024-10-28",
              "date": "2024-10-28",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    },
    {
      "id": "microsoft-mountain-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Mountain Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
          "host": "wdmchamber.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.65942,
        "lng": -94.03741,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "named_campus": "Mountain",
            "reported_total_floor_area_sqft": 415000,
            "annual_property_tax_to_be_paid_usd": 1600000,
            "reported_public_infrastructure_built_usd": 10000000,
            "source_date": null
          },
          "notes": [
            "Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.",
            "6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
              "host": "wdmchamber.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Dallas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    },
    {
      "id": "microsoft-van-meter-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Van Meter Data Center (Vision Park)",
      "group": "approved",
      "status": "Development agreement approved",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Van Meter",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Land acquisition and contemplated seventh centralIowa campus are historical, not a filed/approved/operating site inOctober2026. Purchase price is land, not buildout capex. FirstVanMeter site is not firstDallasCounty site; nearby WestDesMoines properties and USD15millionMadison land deal are separate. No IT, water or RFS independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-23",
          "Van Meter workshop minutes record Council approval of Resolution 2026 25 authorizing a Microsoft development agreement on March 23, 2026, by five votes to zero. The minutes appear on page 8 of the April 13 packet. This is the recorded authorization, not an operating milestone, a completed construction permit or proof that all agreement conditions were met."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.aol.com/microsofts-van-meter-data-center-120442101.html",
          "host": "aol.com",
          "date": "2024-02-02",
          "published": "2024-02-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.vanmeteria.gov/wp-content/uploads/4.13.2026-Regular-Business-Meeting-Packet-Final.pdf",
          "host": "www.vanmeteria.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.70956,
        "lng": -94.02065,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "Des Moines Register article syndicated on AOL reports Microsoft bought more than221acres plus193acres in January2024 for nearlyUSD40million near360th/Richland and365thStreet, VanMeter. City administrator said plans had not yet arrived for review.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Land acquisition and contemplated seventh centralIowa campus are historical, not a filed/approved/operating site inOctober2026. Purchase price is land, not buildout capex. FirstVanMeter site is not firstDallasCounty site; nearby WestDesMoines properties and USD15millionMadison land deal are separate. No IT, water or RFS independently verified.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.aol.com/microsofts-van-meter-data-center-120442101.html",
              "host": "aol.com",
              "date": "2024-02-02",
              "published": "2024-02-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "council_recorded_development_agreement_approval",
              "scope": "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation."
            },
            "regulatory_scope": {
              "recorded_council_authorization_on": "2026-03-23",
              "minutes_embedded_in_april_packet": true,
              "unsigned_march_resolution_draft_not_used_as_vote_proof": true,
              "physical_stage_current_not_established": true
            }
          },
          "notes": [
            "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.vanmeteria.gov/wp-content/uploads/4.13.2026-Regular-Business-Meeting-Packet-Final.pdf",
              "host": "www.vanmeteria.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Van Meter · Dallas · Source context reviewed",
      "status_scope": "The April 13 council packet includes March 23, 2026 workshop minutes recording a five to zero vote approving Resolution 2026 25 authorizing a Microsoft development agreement. Development agreement approved describes this recorded council action. The separate March workshop packet contains unsigned proposed instruments and is not the approval proof. The recorded vote does not establish an executed agreement, site plan approval, completed infrastructure, current construction or operation.",
      "event_evidence": [
        {
          "date": "2026-03-23",
          "text": "Van Meter workshop minutes record Council approval of Resolution 2026 25 authorizing a Microsoft development agreement on March 23, 2026, by five votes to zero. The minutes appear on page 8 of the April 13 packet. This is the recorded authorization, not an operating milestone, a completed construction permit or proof that all agreement conditions were met.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.vanmeteria.gov/wp-content/uploads/4.13.2026-Regular-Business-Meeting-Packet-Final.pdf",
              "host": "www.vanmeteria.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19049"
      }
    },
    {
      "id": "us-signal-ia01-waukee-ia",
      "state": "ia",
      "kind": "facility",
      "name": "US Signal IA01 Des Moines Data Center (Waukee)",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dallas"
      ],
      "city": "Waukee",
      "address": "",
      "who": "US Signal",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Dynamic headline counters appear as zero in saved text; critical load and areas remain unknown, not zero. Generator, UPS and kVA are different electrical bases, not IT MW. Built year not precise opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ussignal.com/data-centers/ia01-des-moines/",
          "host": "ussignal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=390+N+Alices+Road%2C+Waukee%2C+IA+50263&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique calculated street range and retained county match"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-93.8571488426408%2C41.61871018131653%2C-93.84873706817119%2C41.624998359541465&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -93.852943,
        "lat": 41.621854,
        "precision": "approximate",
        "basis": "Approximate current US Signal IA01 service area at 390 N Alices Road, Waukee, IA 50263 matched to one Census street range inside retained Dallas County. Not a confirmed parcel, roof or full site boundary. Aerial acquisition date is unknown and may predate development. Existing native status remains operating."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_site_code": "IA01",
            "published_address": "390 N Alices Road, Waukee, IA50263",
            "operator_reported_year_built": 2009,
            "generator_kw": 3000,
            "ups_kw": 2000,
            "utility_kva": 5000
          },
          "notes": [
            "Dynamic headline counters appear as zero in saved text; critical load and areas remain unknown, not zero. Generator, UPS and kVA are different electrical bases, not IT MW. Built year not precise opening date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/ia01-des-moines/",
              "host": "ussignal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "US Signal lists its specifically named IA01 Des Moines-market facility as part of its current colocation infrastructure offering. Disaster-risk, compliance and cost superlatives are excluded. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "US Signal lists its specifically named IA01 Des Moines-market facility as part of its current colocation infrastructure offering. Disaster-risk, compliance and cost superlatives are excluded. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "US Signal lists its specifically named IA01 Des Moines-market facility as part of its current colocation infrastructure offering. Disaster-risk, compliance and cost superlatives are excluded."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/ia01-des-moines/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 39, October 23, 2026",
          "scope": "Approximate named operator service area only. Existing native status remains operating. Protected facts remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -93.852943,
                "lat": 41.621854,
                "precision": "approximate",
                "basis": "Approximate current US Signal IA01 service area at 390 N Alices Road, Waukee, IA 50263 matched to one Census street range inside retained Dallas County. Not a confirmed parcel, roof or full site boundary. Aerial acquisition date is unknown and may predate development. Existing native status remains operating."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "390 N Alices Road, Waukee, IA 50263",
              "county_fips": [
                "19049"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Current US Signal IA01 Des Moines page explicitly names IA01 at 390 N Alices Road in Waukee. Native operating status remains exact. Zero animated technical counters are not adopted as quantities.",
            "Approximate named operator service area only. Existing native status remains operating. Protected facts remain exact.",
            "Actually viewed open field, streets, nearby industrial or commercial forms and nearby residential properties. Only an approximate service area at the calculated street range is referenced. No particular residence, industrial roof or parcel is selected. Acquisition date is unknown and may predate development.",
            "The inherited inventory coordinate was never a verified street or parcel and is about 2.85 km from the unique Census match for the current exact named IA01 operator service street. The current complete address, Census county and retained Dallas county polygon all agree. This review replaces only that inherited reference with an approximate service area, not a roof, and preserves the entire prior wrapper and native operating status."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/ia01-des-moines/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current exact named service facility address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=390+N+Alices+Road%2C+Waukee%2C+IA+50263&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique calculated street range and retained county match"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-93.8571488426408%2C41.61871018131653%2C-93.84873706817119%2C41.624998359541465&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 27, October 23, 2026",
          "scope": "US Signal identifies the retained IA01 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts.",
          "fields": {
            "company_association": {
              "name": "US Signal",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "US Signal identifies the retained IA01 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts."
            },
            "provider_role": "operator"
          },
          "notes": [
            "US Signal identifies the retained IA01 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/ia01-des-moines/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current named IA01 provider relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate named service area, not a confirmed parcel or building",
      "summary": "Waukee · Dallas · Source context reviewed",
      "status_scope": "US Signal lists its specifically named IA01 Des Moines-market facility as part of its current colocation infrastructure offering. Disaster-risk, compliance and cost superlatives are excluded. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
