{
  "schema_version": 1,
  "source_compilation_context": {
    "ia": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ia.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "19153",
    "label": "Polk County, Iowa"
  },
  "records": [
    {
      "id": "aureon-616-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Aureon 616 Data Center",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Voltage/ampere service rating cannot be converted to measured IT load without design factors. UptimeSLA is not certification. Operator names61610thStreet and separates total area from white space; it separately lists Minneapolis511 location. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Presence of a network point does not prove provider owns or operates an entire data center, exclusive tenancy, parcel coordinates or capacity. Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://aureon.com/solutions/data-center-solutions/",
          "host": "aureon.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://southfront.io/pop",
          "host": "southfront.io",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=616+10th+St.%2C+Des+Moines%2C+IA+50309&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete original literal street response and county context"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-93.63721173956316%2C41.58262028853755%2C-93.62400026043684%2C41.592501711462454&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed source setting with unknown imagery acquisition date"
        }
      ],
      "loc": {
        "lng": -93.630606,
        "lat": 41.587561,
        "precision": "address",
        "basis": "The original Aureon facility body explicitly identifies 616 10th St., Des Moines, IA 50309. One unique complete literal Census street range supplies a calculated reference inside the retained county. It selects no surveyed roof, tenant floor, parcel or complete campus. Existing status group operating remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "street": "616 10th St.",
            "city": "Des Moines",
            "total_area_sqft": 30000,
            "white_space_sqft": 10000,
            "marketed_service": "colocation"
          },
          "notes": [
            "Voltage/ampere service rating cannot be converted to measured IT load without design factors.",
            "UptimeSLA is not certification.",
            "Operator names61610thStreet and separates total area from white space; it separately lists Minneapolis511 location.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://aureon.com/solutions/data-center-solutions/",
              "host": "aureon.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "published_network_presence_address": "616 10th Street, Des Moines, IA50309",
            "provider_ownership_of_whole_building_verified": false,
            "reported_context": "South Front Networks published PoP list names Aureon at 616 10th Street Des Moines and IA-Emery at 16455 Lark Avenue Mason City.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Presence of a network point does not prove provider owns or operates an entire data center, exclusive tenancy, parcel coordinates or capacity.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://southfront.io/pop",
              "host": "southfront.io",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "The current Aureon page names the 616 Data Center separately from its Minneapolis facility and describes present colocation services and continuous network operations monitoring. Reported service applies to that exact named facility account. The separate 511 facility and connection to 666 Walnut are not merged with 616. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_facility_service_account",
              "scope": "The current Aureon page names the 616 Data Center separately from its Minneapolis facility and describes present colocation services and continuous network operations monitoring. Reported service applies to that exact named facility account. The separate 511 facility and connection to 666 Walnut are not merged with 616. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established."
            }
          },
          "notes": [
            "The current Aureon page names the 616 Data Center separately from its Minneapolis facility and describes present colocation services and continuous network operations monitoring. Reported service applies to that exact named facility account. The separate 511 facility and connection to 666 Walnut are not merged with 616. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://aureon.com/solutions/data-center-solutions/",
              "host": "aureon.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 57, October 23, 2026",
          "scope": "Explicit source bound calculated street reference only. Existing status group operating remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -93.630606,
                "lat": 41.587561,
                "precision": "address",
                "basis": "The original Aureon facility body explicitly identifies 616 10th St., Des Moines, IA 50309. One unique complete literal Census street range supplies a calculated reference inside the retained county. It selects no surveyed roof, tenant floor, parcel or complete campus. Existing status group operating remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "616 10th St., Des Moines, IA 50309",
              "county_fips": [
                "19153"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original provider data center body explicitly labels the616DesMoines facility and street. Corporate offices in WestDesMoines and KansasCity, the separate511Minneapolis facility and connectivity to666Walnut are excluded. Only this named street supplies a reference, without adopting provider roles, advertised resilience, capacities, utility claims, certification or actual computing milestones.",
            "Explicit source bound calculated street reference only. Existing status group operating remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
            "The frame shows a dense downtown street grid with varied commercial roofs, surface parking and larger surrounding buildings. The Census result is a street reference only and does not select a roof or tenant floor.",
            "The inherited area coordinate and county display were not reviewed physical facility destinations. The original named operator facility body and complete unique literal Census street response now support only a calculated street range reference within the retained county. Earlier coordinates and complete source history remain intact. This is a reference correction, without physical relocation, a surveyed roof, new computing, title or a complete campus claim."
          ],
          "sources": [
            {
              "url": "https://aureon.com/solutions/data-center-solutions/",
              "host": "aureon.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original named computing facility street in the operator body"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=616+10th+St.%2C+Des+Moines%2C+IA+50309&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete original literal street response and county context"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-93.63721173956316%2C41.58262028853755%2C-93.62400026043684%2C41.592501711462454&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed source setting with unknown imagery acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Des Moines · Polk · Source context reviewed",
      "status_scope": "The current Aureon page names the 616 Data Center separately from its Minneapolis facility and describes present colocation services and continuous network operations monitoring. Reported service applies to that exact named facility account. The separate 511 facility and connection to 666 Walnut are not merged with 616. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established."
    },
    {
      "id": "cologix-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Cologix DSM1 (Financial Center)",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Des Moines",
      "address": "",
      "who": "Cologix",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. two Iowa sites, dated acquisition context. HistoricalDSM1address666conflictswithcurrentDSM2crosslink606Walnut; do not overwritecanonicalstreetwithoutresolution. HistoricalDSM2area12500notcurrent24kfacility/6kcolo. Acquisitionnotnewconstruction; expansionpotentialnotdelivered. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cologix.com/news/cologix-expands-footprint-acquisition-two-data-centers-iowa-including-des-moines-carrier-hotel/",
          "host": "cologix.com",
          "date": "2024-06-05",
          "published": "2024-06-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://cologix.com/data-centers/des-moines/dsm1/",
          "host": "cologix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 41.68548,
        "lng": -93.57348,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "two Iowa sites, dated acquisition context",
          "fields": {
            "acquisition_announcement": "2024-06-05",
            "acquired_sites": [
              "DSM1",
              "DSM2"
            ],
            "historical_dsm1": {
              "published_address": "666 Walnut Street, Des Moines, Iowa",
              "area_sqft": 4000,
              "power_mw": 0.6,
              "potential_expansion_area_sqft": 10000,
              "potential_expansion_power_mw": 1
            },
            "historical_dsm2": {
              "published_city": "Cedar Falls",
              "area_sqft": 12500,
              "power_mw": 1,
              "potential_expansion_area_sqft": 10000
            }
          },
          "notes": [
            "HistoricalDSM1address666conflictswithcurrentDSM2crosslink606Walnut; do not overwritecanonicalstreetwithoutresolution. HistoricalDSM2area12500notcurrent24kfacility/6kcolo. Acquisitionnotnewconstruction; expansionpotentialnotdelivered.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://cologix.com/news/cologix-expands-footprint-acquisition-two-data-centers-iowa-including-des-moines-carrier-hotel/",
              "host": "cologix.com",
              "date": "2024-06-05",
              "published": "2024-06-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Cologix describes DSM1 as an owned and operated facility with current managed suites, carrier access and exchange connectivity. Future expansion potential remains separate. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "Cologix describes DSM1 as an owned and operated facility with current managed suites, carrier access and exchange connectivity. Future expansion potential remains separate. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Cologix describes DSM1 as an owned and operated facility with current managed suites, carrier access and exchange connectivity. Future expansion potential remains separate."
          ],
          "sources": [
            {
              "url": "https://cologix.com/data-centers/des-moines/dsm1/",
              "host": "cologix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 16, October 23, 2026",
          "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The operator role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. Current DSM1 names the Financial Center and managed suites. The provider relationship does not cover ownership or operation of the entire carrier hotel building or delivered expansion capacity.",
          "fields": {
            "company_association": {
              "name": "Cologix",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The operator role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. Current DSM1 names the Financial Center and managed suites. The provider relationship does not cover ownership or operation of the entire carrier hotel building or delivered expansion capacity."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Cologix explicitly identifies the retained named code or grouped campus in its own source. The operator role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. Current DSM1 names the Financial Center and managed suites. The provider relationship does not cover ownership or operation of the entire carrier hotel building or delivered expansion capacity.",
            "Publication dates, retrieval dates, targets and physical milestones stay separate. Raw response hashes remain original; gzip text derivatives are retained separately."
          ],
          "sources": [
            {
              "url": "https://cologix.com/data-centers/des-moines/dsm1/",
              "host": "cologix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Des Moines · Polk · Source context reviewed",
      "status_scope": "Cologix describes DSM1 as an owned and operated facility with current managed suites, carrier access and exchange connectivity. Future expansion potential remains separate. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "cologix-dsm3-altoona-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Cologix DSM3 Altoona",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Altoona",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://cologix.com/data-centers/des-moines/",
          "host": "cologix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.69834,
        "lng": -93.58752,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "The current Cologix Des Moines page identifies DSM1 and DSM2 and describes services for those named facilities. The reviewed page does not explicitly identify the inherited DSM3 Altoona component. Existing facility services are not transferred to a proposed third component, and omission from this particular page does not prove cancellation, closure or absence of a project. Exact DSM3 current physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_dsm1_and_dsm2_services_not_dsm3_component_crosswalk",
              "scope": "The current Cologix Des Moines page identifies DSM1 and DSM2 and describes services for those named facilities. The reviewed page does not explicitly identify the inherited DSM3 Altoona component. Existing facility services are not transferred to a proposed third component, and omission from this particular page does not prove cancellation, closure or absence of a project. Exact DSM3 current physical stage remains unclear."
            }
          },
          "notes": [
            "The current Cologix Des Moines page identifies DSM1 and DSM2 and describes services for those named facilities. The reviewed page does not explicitly identify the inherited DSM3 Altoona component. Existing facility services are not transferred to a proposed third component, and omission from this particular page does not prove cancellation, closure or absence of a project. Exact DSM3 current physical stage remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://cologix.com/data-centers/des-moines/",
              "host": "cologix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Altoona · Polk · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "edged-energy-ankeny-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Edged Ankeny (Des Moines) Data Center",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Ankeny",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-08-06",
          "Edged published the Ankeny structural framework milestone account August 6, 2025. The release reports a topping out event the previous day, while full operation remains an end of 2026 target. This publication date is not a facility opening or exact commissioning day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://edged.us/news/des-moines-iowa",
          "host": "edged.us",
          "date": "2025-05-06",
          "published": "2025-05-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale",
          "host": "edged.us",
          "published": "2025-08-06",
          "date": "2025-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://edged.us/des-moines",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.65867,
        "lng": -93.57113,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "groundbreaking_announcement": "2025-05-06",
            "planned_critical_capacity_mw": 13.2,
            "published_city": "Ankeny, Iowa",
            "expected_construction_duration_months": 24
          },
          "notes": [
            "24monthscompletionestimatefromrelease, notexactopeningdateoroperatingproof.52Mgallonsannualsavingsdesigncomparisonnotmeasuredwateruse.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/des-moines-iowa",
              "host": "edged.us",
              "date": "2025-05-06",
              "published": "2025-05-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_reported_named_ankeny_structural_completion_not_operation",
              "scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes."
            }
          },
          "notes": [
            "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale",
              "host": "edged.us",
              "published": "2025-08-06",
              "date": "2025-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://edged.us/des-moines",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The provider markets Des Moines and explicitly places its named center in Ankeny. No marketing city is substituted for legal jurisdiction."
          ],
          "sources": [
            {
              "url": "https://edged.us/des-moines",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ankeny · Polk · Source context reviewed",
      "status_scope": "Edged August 6, 2025 release explicitly reports completion of the named Ankeny facility structural framework at its topping out event the previous day. Reported construction is limited to that structural milestone. The release expects full operation by the end of 2026, and the current named facility listing does not independently certify commissioning. A completion target, customer access offer or uptime agreement is not operation. Advertised capacity and projected water savings are not promoted as delivered quantities or measured outcomes.",
      "event_evidence": [
        {
          "date": "2025-08-06",
          "text": "Edged published the Ankeny structural framework milestone account August 6, 2025. The release reports a topping out event the previous day, while full operation remains an end of 2026 target. This publication date is not a facility opening or exact commissioning day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale",
              "host": "edged.us",
              "published": "2025-08-06",
              "date": "2025-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "fidium-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Fidium Des Moines Data Center",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fidium Des Moines named colocation suite. Published500sqftnotcorrectedto5000.65kVAgeneratornotcriticalITMWoractivepower. Repeatedresponsivefeaturetablesnotduplicatefacilities. Hostingserviceprovidersuite notwholecarrierhotelownership. Noopeningdateorcurrentmeasuredload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.fidiumbusiness.com/network/data-center-locations/iowa",
          "host": "fidiumbusiness.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=400+Locust+Street%2C+Suite+190%2C+Des+Moines%2C+IA+50309&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete original literal street response and county context"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-93.62951670395745%2C41.582272288537546%2C-93.61630529604255%2C41.59215371146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed source setting with unknown imagery acquisition date"
        }
      ],
      "loc": {
        "lng": -93.622911,
        "lat": 41.587213,
        "precision": "address",
        "basis": "The original Fidium Business facility body explicitly identifies 400 Locust Street, Suite 190, Des Moines, IA 50309. One unique complete literal Census street range supplies a calculated reference inside the retained county. It selects no surveyed roof, tenant floor, parcel or complete campus. Existing status group operating remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Fidium Des Moines named colocation suite",
          "fields": {
            "operator": "Fidium Business",
            "address": "400 Locust Street, Suite190, Des Moines, Iowa50309",
            "published_suite_facility_area_sqft": 500,
            "backup_generator_apparent_power_kva": 65,
            "utility_transformers": 3
          },
          "notes": [
            "Published500sqftnotcorrectedto5000.65kVAgeneratornotcriticalITMWoractivepower. Repeatedresponsivefeaturetablesnotduplicatefacilities. Hostingserviceprovidersuite notwholecarrierhotelownership. Noopeningdateorcurrentmeasuredload.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.fidiumbusiness.com/network/data-center-locations/iowa",
              "host": "fidiumbusiness.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "The current Fidium Iowa page names its Des Moines facility and describes present colocation services, customer access and infrastructure supporting critical applications. Reported service applies to that exact city facility account, not a speculative regional investment. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_facility_service_account",
              "scope": "The current Fidium Iowa page names its Des Moines facility and describes present colocation services, customer access and infrastructure supporting critical applications. Reported service applies to that exact city facility account, not a speculative regional investment. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established."
            }
          },
          "notes": [
            "The current Fidium Iowa page names its Des Moines facility and describes present colocation services, customer access and infrastructure supporting critical applications. Reported service applies to that exact city facility account, not a speculative regional investment. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.fidiumbusiness.com/network/data-center-locations/iowa",
              "host": "www.fidiumbusiness.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 57, October 23, 2026",
          "scope": "Explicit source bound calculated street reference only. Existing status group operating remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -93.622911,
                "lat": 41.587213,
                "precision": "address",
                "basis": "The original Fidium Business facility body explicitly identifies 400 Locust Street, Suite 190, Des Moines, IA 50309. One unique complete literal Census street range supplies a calculated reference inside the retained county. It selects no surveyed roof, tenant floor, parcel or complete campus. Existing status group operating remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "400 Locust Street, Suite 190, Des Moines, IA 50309",
              "county_fips": [
                "19153"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original provider Iowa body explicitly labels the DesMoines computing facility at400LocustStreet, Suite190. The literal suite is retained in the complete original Census request. A street range cannot locate Suite190, a tenant floor, independent building, title, actual service availability or current certification. Global network counts and technical specifications are not adopted.",
            "Explicit source bound calculated street reference only. Existing status group operating remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
            "The frame shows a dense commercial downtown setting and river corridor. Multiple buildings and streets surround the reference. Suite190cannot be located in aerial imagery and is not a separate mapped building.",
            "The inherited area coordinate and county display were not reviewed physical facility destinations. The original named operator facility body and complete unique literal Census street response now support only a calculated street range reference within the retained county. Earlier coordinates and complete source history remain intact. This is a reference correction, without physical relocation, a surveyed roof, new computing, title or a complete campus claim."
          ],
          "sources": [
            {
              "url": "https://www.fidiumbusiness.com/network/data-center-locations/iowa",
              "host": "www.fidiumbusiness.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original named computing facility street in the operator body"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=400+Locust+Street%2C+Suite+190%2C+Des+Moines%2C+IA+50309&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete original literal street response and county context"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-93.62951670395745%2C41.582272288537546%2C-93.61630529604255%2C41.59215371146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed source setting with unknown imagery acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Des Moines · Polk · Source context reviewed",
      "status_scope": "The current Fidium Iowa page names its Des Moines facility and describes present colocation services, customer access and infrastructure supporting critical applications. Reported service applies to that exact city facility account, not a speculative regional investment. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established."
    },
    {
      "id": "ip-pathways-urbandale-ia",
      "state": "ia",
      "kind": "facility",
      "name": "IP Pathways Urbandale Data Center",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Urbandale",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. IP Pathways whitespace and power-scope inconsistency. Holdcanonicalpoweruntilsite-levelscope/unitsconfirmed,donotsilentlycorrect5000to500orassume5MWcurrentIT. Omaha4000sqftandKansasCity11000sqftdifferentfacilities. No exactUrbandalestreetorobservedopening. Certificationoperatorclaimsnotindependentreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.ippathways.com/solutions/data-center-and-colocation/",
          "host": "ippathways.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.71164,
        "lng": -93.55343,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "IP Pathways whitespace and power-scope inconsistency",
          "fields": {
            "operator": "IP Pathways",
            "urbandale_whitespace_sqft": 5817,
            "urbandale_published_critical_power_kw": 5000,
            "urbandale_rack_power_kw_max": 17.2,
            "canonical_urbandale_critical_it_mw": null,
            "scope_conflict": "repeated5000kWcriticalspecacrosssites;KansasCityoverviewseparately0.5MWand500kWper4500sqft"
          },
          "notes": [
            "Holdcanonicalpoweruntilsite-levelscope/unitsconfirmed,donotsilentlycorrect5000to500orassume5MWcurrentIT. Omaha4000sqftandKansasCity11000sqftdifferentfacilities. No exactUrbandalestreetorobservedopening. Certificationoperatorclaimsnotindependentreport.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.ippathways.com/solutions/data-center-and-colocation/",
              "host": "ippathways.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "The current IP Pathways page separately names Urbandale, Omaha and Kansas City, describes staffed facilities and lists managed services and remote hands at Urbandale. Reported service is tied to the Urbandale section. Specifications and claims from the other cities are not transferred. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_facility_service_account",
              "scope": "The current IP Pathways page separately names Urbandale, Omaha and Kansas City, describes staffed facilities and lists managed services and remote hands at Urbandale. Reported service is tied to the Urbandale section. Specifications and claims from the other cities are not transferred. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established."
            }
          },
          "notes": [
            "The current IP Pathways page separately names Urbandale, Omaha and Kansas City, describes staffed facilities and lists managed services and remote hands at Urbandale. Reported service is tied to the Urbandale section. Specifications and claims from the other cities are not transferred. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.ippathways.com/solutions/data-center-and-colocation/",
              "host": "www.ippathways.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Urbandale · Polk · Source context reviewed",
      "status_scope": "The current IP Pathways page separately names Urbandale, Omaha and Kansas City, describes staffed facilities and lists managed services and remote hands at Urbandale. Reported service is tied to the Urbandale section. Specifications and claims from the other cities are not transferred. Advertised capacities, uptime guarantees, audit or Tier claims, locations and roles are not independently verified or promoted. No precise opening day is established.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "lightedge-solutions-altoona-ia",
      "state": "ia",
      "kind": "facility",
      "name": "LightEdge Altoona Data Center Campus",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Altoona",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lightedge two named Altoona sites. Two named addresses, not automatic creation of two new whole-building count records under generic boundID. Missing dynamic capacity/area numbers remain null. DesMoinesmarketnotcity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://lightedge.com/data-centers/des-moines-data-center/",
          "host": "lightedge.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.67885,
        "lng": -93.61096,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Lightedge two named Altoona sites",
          "fields": {
            "operator": "Lightedge",
            "market": "Des Moines",
            "named_sites": [
              {
                "code": "Des Moines Data Center1",
                "address": "1435 Northridge Circle, Altoona, Iowa50009"
              },
              {
                "code": "Des Moines Data Center2",
                "address": "1401 Northridge Circle, Altoona, Iowa50009"
              }
            ]
          },
          "notes": [
            "Two named addresses, not automatic creation of two new whole-building count records under generic boundID. Missing dynamic capacity/area numbers remain null. DesMoinesmarketnotcity.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://lightedge.com/data-centers/des-moines-data-center/",
              "host": "lightedge.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Lightedge lists current colocation and hybrid cloud services at its two named Des Moines-market facilities in Altoona. They remain within the existing campus research record, without a new building count or capacity total. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "Lightedge lists current colocation and hybrid cloud services at its two named Des Moines-market facilities in Altoona. They remain within the existing campus research record, without a new building count or capacity total. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Lightedge lists current colocation and hybrid cloud services at its two named Des Moines-market facilities in Altoona. They remain within the existing campus research record, without a new building count or capacity total."
          ],
          "sources": [
            {
              "url": "https://lightedge.com/data-centers/des-moines-data-center/",
              "host": "lightedge.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Altoona · Polk · Source context reviewed",
      "status_scope": "Lightedge lists current colocation and hybrid cloud services at its two named Des Moines-market facilities in Altoona. They remain within the existing campus research record, without a new building count or capacity total. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "meta-altoona-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Meta Altoona Data Center Campus",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Altoona",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. December2021expansion; planned2025completion is not verified as delivered2026. Investment and area cover the whole expanded campus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2021/12/meta-announces-new-expansion-to-altoona-campus-new-hardhat-in-hand-graduates/",
          "host": "datacenters.atmeta.com",
          "date": "2021-12-14",
          "published": "2021-12-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/altoona-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 41.66264,
        "lng": -93.53758,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "historical_expansion_new_buildings": 2,
            "planned_resulting_campus_area_sqft_min_exclusive": 5000000,
            "historical_planned_buildout_completion_year": 2025,
            "capital_investment_usd_min_exclusive": 2500000000,
            "groundbreaking_year": 2013,
            "operator_reported_operations_jobs_min_exclusive": 400
          },
          "notes": [
            "December2021expansion; planned2025completion is not verified as delivered2026. Investment and area cover the whole expanded campus.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2021/12/meta-announces-new-expansion-to-altoona-campus-new-hardhat-in-hand-graduates/",
              "host": "datacenters.atmeta.com",
              "date": "2021-12-14",
              "published": "2021-12-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes."
          },
          "notes": [
            "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/altoona-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 05, October 23, 2026",
          "scope": "Meta presents its named Altoona data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named Altoona data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named Altoona data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/altoona-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus fact sheet, visually reviewed PDF page 1"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Altoona · Polk · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role. This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-alluvion-west-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Alluvion Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established. 6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
          "host": "wdmchamber.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.7305,
        "lng": -93.58559,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "named_campus": "Alluvion",
            "reported_total_floor_area_sqft": 1166000,
            "annual_property_tax_to_be_paid_usd": 8100000,
            "reported_public_infrastructure_built_usd": 45000000,
            "source_date": null
          },
          "notes": [
            "Chamber republication credits City of WestDesMoines. Undated page mixes fiscal-year snapshots and forward-looking annual tax wording. No current paid-tax amount, usable IT area or commissioning date established.",
            "6500 acres is development opened up by infrastructure across three campuses, not datacenter footprint. Combined FY2024-25 Microsoft tax21M is not a per-campus figure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wdmchamber.org/economic-development/microsoft-data-centers/",
              "host": "wdmchamber.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-ginger-east-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ginger East Data Center",
      "group": "building",
      "status": "Agency-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status. GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/",
          "host": "gowestdesmoines.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/",
          "host": "gowestdesmoines.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2025-01-08",
          "date": "2025-01-08",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.6408,
        "lng": -93.59669,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "source_republished_report_date": "2024-07-17",
            "campus_address": "1475 SE Maffitt Lake Road",
            "historical_building_permits": 2,
            "area_each_sqft": 244676,
            "permit_valuation_each_usd": 384000000,
            "reported_contractor": "Weitz"
          },
          "notes": [
            "City development page republishes DesMoinesBusinessRecord. Historical permit values are not expenditure or observed2026 operating status.",
            "GingerWest two permits374.5M each are separate projects; citywide1.65B permit total and nearly200M public improvements must not become GingerEast-only amounts.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/",
              "host": "gowestdesmoines.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_reported_construction",
              "scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion."
            }
          },
          "notes": [
            "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://gowestdesmoines.com/portfolio-works/microsoft-ginger-east-data-center/",
              "host": "gowestdesmoines.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies Ginger East in greater Des Moines and describes Weitz Construction as the general contractor. Its mid2028 completion estimate is a forecast, and its explicit distinction between construction completion and operation is retained. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-east-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-01-08",
              "date": "2025-01-08",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "status_scope": "The city development project listing explicitly marks Microsoft Ginger East as Under Construction. This is the current agency listed project stage, not a certification of every building, an exact construction start, completed commissioning or operation. The older article about June building permits remains separate from present completion.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "microsoft-ginger-west-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Microsoft Project Ginger West Data Center",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "West Des Moines",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified. Later originals and observed outcomes take precedence; future dates have no assumed result.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
          "host": "businessrecord.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.70395,
        "lng": -93.52293,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "construction_completion_target": "Summer2028; season precision only",
            "general_contractor": "Turner Construction",
            "actual_operational_date": null
          },
          "notes": [
            "Operator expressly says construction completion does not indicate availability or operation. Do not infer commissioning in2028 or an exact summer day.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "BusinessRecord’s Iowa survey supplies named AppleWaukee/CologixDSM 3 and five MicrosoftWestDesMoines campus sections with dated land/floor/valuation descriptions.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Survey combines IEDA, assessors, directory and news data; not independent original-assessor verification or 2026 operation. Development-start years are not opening years. Apple 361,504 squarefeetcurrent versusover 1.9 millionultimate/fivebuildings are separate phases;1.3 billion is fullbuildoutforecast. CologixDSM 3 landpurchase had no released development plan. Microsofteachcampuscurrentlistedspace differs from futureGinger 1.8 million each; citywide 5 billioninvestment/400 employees/200 millionpublicinfrastructure cannot be copied to each campus. Assessedvalue is not capex or taxpaid. Broader 15.3 millionfeet includes operating,construction ANDproposed;14.7 billion includesplannedinvestment, not allspent. Virginia 70 percentworldcenters claim and directoryUSgrowth counts are not adopted. No siteMW/ESAverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.businessrecord.com/growth-of-data-centers-in-iowa/",
              "host": "businessrecord.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted."
            },
            "construction_scope": {
              "estimated_completion_period": "summer 2028",
              "source_explicitly_separates_completion_from_operation": true,
              "physical_operation_verified": false
            }
          },
          "notes": [
            "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Ginger West data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Turner Construction as the general contractor and estimates summer 2028 completion. Construction completion is explicitly distinct from operation or availability. Greater Des Moines is a market description, not a newly resolved street."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/ginger-west-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-01-08",
              "date": "2025-01-08",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Des Moines · Polk · Source context reviewed",
      "status_scope": "The current Microsoft Ginger West page expressly says Microsoft is building the data center and identifies its contractor. Operator reported construction describes that project claim. Summer 2028 completion is an estimate, and the source expressly says construction completion does not indicate operation or availability. No exact start, opening day or operating capacity is adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "oppidan-des-moines-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Oppidan Des Moines Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Des Moines",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The body also says summer 2024; no exact completion day is inferred. Contractor completion is not current occupancy, metered IT or independent certification verification. Future regional portfolio plans are not additional built facilities at this site. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.weitz.com/projects/oppidan-data-center/",
          "host": "weitz.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.70727,
        "lng": -93.62626,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Weitz describes completion of Oppidan's Des Moines project in May 2024, with 60,000 square feet, 5 MW and a contractor-reported LEED certification.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The body also says summer 2024; no exact completion day is inferred. Contractor completion is not current occupancy, metered IT or independent certification verification. Future regional portfolio plans are not additional built facilities at this site.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.weitz.com/projects/oppidan-data-center/",
              "host": "weitz.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 26",
          "scope": "The Weitz Company named Oppidan Des Moines project page reports building completion in 2024. Its narrative says summer while its details field says May, so no exact completion day or month is certified. Contractor building completion is not customer commissioning or current data center service. The page does not identify a current end user or establish current operation, and other unnamed regional Oppidan projects are not merged. Current operating phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "contractor_building_completion_not_commissioning_with_month_wording_difference",
              "scope": "The Weitz Company named Oppidan Des Moines project page reports building completion in 2024. Its narrative says summer while its details field says May, so no exact completion day or month is certified. Contractor building completion is not customer commissioning or current data center service. The page does not identify a current end user or establish current operation, and other unnamed regional Oppidan projects are not merged. Current operating phase remains unclear."
            }
          },
          "notes": [
            "The Weitz Company named Oppidan Des Moines project page reports building completion in 2024. Its narrative says summer while its details field says May, so no exact completion day or month is certified. Contractor building completion is not customer commissioning or current data center service. The page does not identify a current end user or establish current operation, and other unnamed regional Oppidan projects are not merged. Current operating phase remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.weitz.com/projects/oppidan-data-center/",
              "host": "www.weitz.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Des Moines · Polk · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    },
    {
      "id": "tract-altoona-ia",
      "state": "ia",
      "kind": "facility",
      "name": "Tract Altoona Technology Park",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Polk"
      ],
      "city": "Altoona",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Altoona announced entitled land campus and future capacity. Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-01",
          "The City of Altoona economic development site published its Tract campus announcement on October 1, 2025. The account describes planned development and prior land use work without independently establishing actual computing construction or service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
          "host": "altoonanow.org",
          "date": "2025-10-01",
          "published": "2025-10-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.63098,
        "lng": -93.54798,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Altoona announced entitled land campus and future capacity",
          "fields": {
            "publisher": "City of Altoona economic development",
            "company": "Tract",
            "announcement_date": "2025-10-01",
            "reported_entitled_acres": 453,
            "expected_capacity_gw_min_exclusive": 1,
            "power_basis": "campus capacity, not explicit critical IT",
            "city_reported_processes": [
              "annexation",
              "rezoning",
              "development agreement"
            ]
          },
          "notes": [
            "Headline450acre approximation versus body453ac retained as different precision. Fully entitled marketing does not establish all individual building permits or energization. More than1GW expected, not existing load or committed tenant. Actual signed development agreement/incentives and spending not inspected.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
              "host": "altoonanow.org",
              "date": "2025-10-01",
              "published": "2025-10-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 65",
          "scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_named_tract_altoona_proposal",
              "scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host."
            },
            "source_read_scope": {
              "complete_original_visible_text_bodies_read": true
            }
          },
          "notes": [
            "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.",
            "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."
          ],
          "sources": [
            {
              "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
              "host": "altoonanow.org",
              "published": "2025-10-01",
              "date": "2025-10-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Altoona · Polk · Source context reviewed",
      "status_scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host.",
      "event_evidence": [
        {
          "date": "2025-10-01",
          "text": "The City of Altoona economic development site published its Tract campus announcement on October 1, 2025. The account describes planned development and prior land use work without independently establishing actual computing construction or service.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
              "host": "altoonanow.org",
              "published": "2025-10-01",
              "date": "2025-10-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "19153"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
