{
  "schema_version": 1,
  "source_compilation_context": {
    "ks": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ks.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "20111",
    "label": "Lyon County, Kansas"
  },
  "records": [
    {
      "id": "kanza-park-flint-hills-emporia-ks",
      "state": "ks",
      "kind": "facility",
      "name": "Flint Hills Digital Campus",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lyon"
      ],
      "city": "Emporia",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-22",
          "The current City of Emporia account reports establishment of its Digital Infrastructure Overlay and Kanza Park zoning actions on July 22, 2026. It expressly distinguishes these actions from approval of a data center for construction or current computing service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/",
          "host": "wibw.com",
          "date": "2026-06-02",
          "published": "2026-06-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District",
          "host": "www.emporiaks.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.emporiaks.gov/m/NewsFlash/Home/Detail/535",
          "host": "www.emporiaks.gov",
          "published": "2026-10-16",
          "date": "2026-10-16",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.emporiaks.gov/1602/Proposed-Data-Center-Development-Guideli",
          "host": "www.emporiaks.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.emporiaks.gov/1600/2026-City-of-Emporia-Ballot-Information",
          "host": "www.emporiaks.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.emporiaks.gov/DocumentCenter/View/8935",
          "host": "www.emporiaks.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original explicit computing project location, separate from mail"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=600+Road+190%2C+Emporia%2C+Kansas&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal original street query, calculated range only"
        },
        {
          "url": "https://www.emporiarda.org/news-and-media/news-archive/p/item/67803/flint-hills-digital-campus-initiative-signals-major-economic-development-opportunity-for-emporia-and-lyon-county",
          "host": "www.emporiarda.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original project association only; no operator role or computing approval inferred"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.26874036833472%2C38.42914828853755%2C-96.25612563166528%2C38.43902971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting; imagery acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -96.262433,
        "lat": 38.434089,
        "precision": "approximate",
        "basis": "The original City of Emporia source names 600 Road 190, Emporia, Kansas. One complete literal Census query uniquely supports this approximate component tract street reference. The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WIBW reports Kanza Park Place predevelopment near Emporia and a scheduled June 23 hearing.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/",
              "host": "wibw.com",
              "date": "2026-06-02",
              "published": "2026-06-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 65",
          "scope": "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_named_kanza_proposal_with_separate_zoning_and_ballot",
              "scope": "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds."
            },
            "source_read_scope": {
              "complete_original_overlay_guideline_notice_resource_and_ballot_bodies_read": true,
              "no_construction_approval_explicit": true,
              "past_study_session_notice_not_outcome": true,
              "november3_question2_proposal_not_enacted": true,
              "strict_electrical_or_water_thresholds_not_conjoined": true,
              "full_resolution_and_court_records_unread_transport_holds": true
            }
          },
          "notes": [
            "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds.",
            "Existing roles, locations, jurisdiction assignments, quantities, identities and first physical opening dates remain unchanged. Source retrieval does not date commissioning."
          ],
          "sources": [
            {
              "url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District",
              "host": "www.emporiaks.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.emporiaks.gov/m/NewsFlash/Home/Detail/535",
              "host": "www.emporiaks.gov",
              "published": "2026-10-16",
              "date": "2026-10-16",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.emporiaks.gov/1602/Proposed-Data-Center-Development-Guideli",
              "host": "www.emporiaks.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.emporiaks.gov/1600/2026-City-of-Emporia-Ballot-Information",
              "host": "www.emporiaks.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 74, 2026-10-24",
          "scope": "The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -96.262433,
                "lat": 38.434089,
                "precision": "approximate",
                "basis": "The original City of Emporia source names 600 Road 190, Emporia, Kansas. One complete literal Census query uniquely supports this approximate component tract street reference. The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "600 Road 190, Emporia, Kansas",
              "county_fips": [
                "20111"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.",
            "The inherited general area coordinate was not independently admitted as a reviewed source reference. The original City legal descriptions identify Tract 1 at 600 Road 190 among eleven Kanza Park Place overlay tracts. The City review page identifies the Kanza development, and the original regional development announcement independently joins Kanza Park Place to the Flint Hills Digital Campus. This is an approximate street reference for one named project tract, never a selected computing building, complete campus center or construction approval. The City expressly distinguishes zoning from future facility permits and an end user. No source quantities or physical stage are adopted. The complete literal query and its independently checked calculated reference are inside the unchanged retained county 20111. The measured correction from the prior Native context is 7794.5 metres. This is a source reference review, not a physical relocation. No source setting pixel supplies coordinates or construction stage.",
            "The source setting shows a rural road crossing, fields, wooded edges, ponds and scattered houses or outbuildings. The calculated range selects no computing roof. This is one original project tract street reference and no complete campus boundary is inferred. Acquisition date is unknown."
          ],
          "sources": [
            {
              "url": "https://www.emporiaks.gov/DocumentCenter/View/8935",
              "host": "www.emporiaks.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original explicit computing project location, separate from mail"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=600+Road+190%2C+Emporia%2C+Kansas&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal original street query, calculated range only"
            },
            {
              "url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District",
              "host": "www.emporiaks.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original project association only; no operator role or computing approval inferred"
            },
            {
              "url": "https://www.emporiarda.org/news-and-media/news-archive/p/item/67803/flint-hills-digital-campus-initiative-signals-major-economic-development-opportunity-for-emporia-and-lyon-county",
              "host": "www.emporiarda.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original project association only; no operator role or computing approval inferred"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.26874036833472%2C38.42914828853755%2C-96.25612563166528%2C38.43902971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting; imagery acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate project tract street, not a building or complete campus",
      "summary": "Emporia · Lyon · Source context reviewed",
      "status_scope": "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds.",
      "event_evidence": [
        {
          "date": "2026-07-22",
          "text": "The current City of Emporia account reports establishment of its Digital Infrastructure Overlay and Kanza Park zoning actions on July 22, 2026. It expressly distinguishes these actions from approval of a data center for construction or current computing service.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District",
              "host": "www.emporiaks.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
