  "schema_version": 1,
  "source_compilation_context": {
    "ky": {
      "attribution": {
        "research": "Data Centers Atlas research from county and city records, Public Service Commission filings, company announcements and local news, linked on each record.",
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/"
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "geocoder": "U.S. Census Bureau geocoder (public domain)",
        "geometry": {
          "license": "ODbL 1.0",
          "credit": "OpenStreetMap contributors",
          "url": "https://www.openstreetmap.org/copyright",
          "note": "Matched building centers are adapted separately from the inventory; not surveyed parcels"
        }
      },
      "source_data_url": "https://datacentersatlas.com/data/ky.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "21089",
    "label": "Greenup County, Kentucky"
  },
  "records": [
    {
      "id": "rubix-ashland-works-russell-greenup-ky",
      "kind": "project",
      "name": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "crypto": false,
      "type": "hyperscale AI",
      "counties": [
        "Greenup",
        "Boyd"
      ],
      "city": "Russell (portions in Boyd County and City of Ashland)",
      "who": "Rubix Data Centers (subsidiary of Submer Group, Barcelona; Rubix formed June 2026, CEO John Eland, London); consultant Gateway City Energy / Gateway City Consulting (St. Louis, Chris Honstain); engineering Nuclei (Ben Mitten)",
      "end_user": "Undisclosed 'big-name' tenant to be determined after site purchase",
      "mw": 2000,
      "power": "first phase about 155 MW initial phase (Kentucky Power talks targeting Nov 2027), up to 2,000 MW",
      "power_note": "Kentucky Power (AEP) would serve; load studies not complete",
      "investment": "8-12 billion developer infrastructure estimate, excluding computing equipment; other published scopes differ",
      "jobs": "construction: 3,000 at peak (over about 5 years), permanent: 200 full-time (average salary 125,000 dollars) per company; 200-300 per Honstain",
      "acres": "about 500 acres (300 Russell / 110 Boyd County / 100 Ashland) per Gateway; 425-acre brownfield per Kentucky Lantern; about 450 acres per Construction Review",
      "utility": "Kentucky Power (AEP)",
      "water": "Russell or Ashland municipal supply proposed; developer describes closed-loop design, not measured consumption",
      "incentives": "Developer says it may seek equipment sales-tax exemption; no confirmed site-specific award recorded",
      "note": "",
      "date": "2026-10-13",
      "events": [
        [
          "2026-07-10",
          "Mayor's letter to community discloses Rubix proposal and Q&A"
        ],
        [
          "2026-07-21",
          "Rubix town hall in Russell: 55 million dollars Cleveland-Cliffs purchase agreement; asks city to lift moratorium by Aug 31"
        ],
        [
          "2026-07-23",
          "Ashland adopts restrictive data center zoning leaving about 20 acres of its Ashland Works portion usable"
        ],
        [
          "2026-09-04",
          "Cleveland-Cliffs closing deadline extended from Aug 31 to Sept 25"
        ],
        [
          "2026-09-24",
          "Deadline extended again to Oct 15 ('no more extensions'); Boyd J-E Chaney says county will wait for Russell"
        ],
        [
          "2026-10-15",
          "Reported final closing deadline with Cleveland-Cliffs; outcome to be confirmed"
        ]
      ],
      "timeline": [
        [
          "Announced",
          "2026-07 (City of Russell posted company Q&A; mayor's July 10 letter; public town hall July 21)"
        ],
        [
          "Approvals",
          "None. Russell 180-day moratorium in force until Dec 2026; Boyd County moratorium also covers its about 110 acres; Ashland ordinance limits its portion to about 20 developable acres; Russell zoning amendments pending"
        ],
        [
          "Expected opening",
          "First about 155 MW targeted Nov 2027 (developer aspiration)"
        ]
      ],
      "sources": [
        {
          "url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/",
          "host": "glasgownews1.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html",
          "host": "dailyindependent.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html",
          "host": "dailyindependent.com",
          "date": "2026-09-25"
        },
        {
          "url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html",
          "host": "dailyindependent.com",
          "date": "2026-10-01"
        }
      ],
      "loc": {
        "lat": 38.54579,
        "lng": -82.92278,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "state": "KY",
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Greenup County, Boyd County · 2,000 MW · Rubix Data Centers",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "21089"
      }
    },
    {
      "id": "terawulf-muskie-eastpark-ky",
      "kind": "project",
      "name": "Muskie Data Campus",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "crypto": false,
      "type": "hyperscale AI",
      "counties": [
        "Boyd",
        "Greenup"
      ],
      "city": "near Ashland (unincorporated; EastPark off I-64, about 12 miles from Ashland)",
      "who": "TeraWulf Inc. (Nasdaq: WULF); site assembled by Industrial Equity Partners (IEP) from the Northeast Kentucky Regional Industrial Park Authority (EastPark board)",
      "end_user": "Undisclosed AI/HPC tenant (TeraWulf builds and owns buildings; tenant brings servers)",
      "mw": 1000,
      "power": "first phase 500 MW, up to 1,000 MW",
      "power_note": "Contracted gross electrical service; additional 1000 MW is aspiration; amended ESA remains subject to PSC approval",
      "investment": "",
      "jobs": "construction: Around 1,000 at peak (TeraWulf VP Pace Ralli), permanent: 80-100 in Phase 1, excluding tenant jobs",
      "acres": "about 285 acres owned/controlled (TeraWulf); TeraWulf website cites 308 acres; buildings on 164 acres (Lots 2B and 1A); optional adjacent acreage for expansion",
      "utility": "Kentucky Power (AEP), Industrial General Service large-load tariff; PJM",
      "water": "Ashland supply proposed; source water, cooling circuit and operational consumption need a dedicated current technical record",
      "incentives": "Operator proposes winter bill credits and bearing project power costs, subject to PSC approval.",
      "note": "",
      "date": "2026-10-05",
      "events": [
        [
          "2026-07-14",
          "Greenup County moratorium adopted, exempting industrial parks/EastPark; Boyd County follows 2026-07-21 with EastPark exemption"
        ],
        [
          "2026-08-05",
          "Q2 earnings call: CEO Paul Prager says Muskie could expand to as much as 2 GW"
        ],
        [
          "2026-10-05",
          "Amended Kentucky Power ESA (executed Oct 1) doubles contracted capacity to 1 GW, moves phase 2 to 2029, adds 100 million dollars bill credits (PSC approval required)"
        ],
        [
          "2026-10-15",
          "Kentucky Power open house on Muskie transmission line routes (scheduled)"
        ],
        [
          "2026-10-29",
          "Kentucky Power asks landowners for route feedback by this date"
        ]
      ],
      "timeline": [
        [
          "Announced",
          "2026-05-26"
        ],
        [
          "Approvals",
          "Site already zoned industrial; ESA executed at closing (May 2026) and amended 2026-10-01; PSC approval of amended contract pending; Kentucky Power to file substation application Oct 2026 and transmission-line application early 2027, PSC decision expected spring 2027"
        ],
        [
          "Construction",
          "Kentucky Power substation construction expected early 2027 if approved; transmission lines Nov 2027; campus construction date not announced"
        ],
        [
          "Expected opening",
          "First 500 MW ramp 2H 2028 (Kentucky Power facilities in service Oct 2028); second 500 MW 2029"
        ]
      ],
      "sources": [
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm",
          "host": "investors.terawulf.com",
          "date": "2026-10-05"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm",
          "host": "sec.gov",
          "date": "2026-05-26"
        },
        {
          "url": "https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html",
          "host": "dailyindependent.com",
          "date": "2026-06-16"
        },
        {
          "url": "https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html",
          "host": "dailyindependent.com",
          "date": "2026-10-07"
        }
      ],
      "loc": {
        "lat": 38.35933,
        "lng": -82.68782,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "state": "KY",
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boyd County, Greenup County · 1,000 MW · TeraWulf Inc.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "21019"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}