  "schema_version": 1,
  "source_compilation_context": {
    "ky": {
      "attribution": {
        "research": "Data Centers Atlas research from county and city records, Public Service Commission filings, company announcements and local news, linked on each record.",
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/"
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "geocoder": "U.S. Census Bureau geocoder (public domain)",
        "geometry": {
          "license": "ODbL 1.0",
          "credit": "OpenStreetMap contributors",
          "url": "https://www.openstreetmap.org/copyright",
          "note": "Matched building centers are adapted separately from the inventory; not surveyed parcels"
        }
      },
      "source_data_url": "https://datacentersatlas.com/data/ky.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "21091",
    "label": "Hancock County, Kentucky"
  },
  "records": [
    {
      "id": "terawulf-hawesville-ky",
      "kind": "project",
      "name": "Justified Data Campus",
      "group": "building",
      "status": "Site development underway",
      "raw_status": "under construction",
      "crypto": false,
      "type": "data center",
      "counties": [
        "Hancock"
      ],
      "city": "Hawesville",
      "who": "TeraWulf / Raylan Data",
      "end_user": "Anthropic",
      "mw": 401,
      "power": "Approximately 401 MW contracted critical IT across future phases",
      "power_note": "Separate non-additive figures: approximately 401 MW contracted critical IT; up to 482 MW approved electric service; up to 480 MW planned gross campus capacity. None establishes current delivered IT or metered demand.",
      "investment": "approximately 4.0 billion to 4.5 billion in site development and initial data halls, excluding customer computing equipment",
      "jobs": "",
      "acres": null,
      "utility": "Big Rivers Electric / Kenergy; market delivery through MISO",
      "water": "",
      "incentives": "Customer bears project-specific power supply, delivery and infrastructure costs under the approved contract. No verified site-specific tax award recorded here.",
      "note": "PSC power agreement approval; operator describes development at former smelter",
      "date": "2026-08-21",
      "events": [
        [
          "2026-07-06",
          "TeraWulf announced an Anthropic lease for approximately 401 MW critical IT at Justified. Initial second-half-2027 and full early-2028 delivery are future targets."
        ],
        [
          "2026-08-21",
          "Electric-service agreement approval dated August 21, reported in TeraWulf’s August 24 announcement. Up to 482 MW is service capacity, not IT delivery, building approval or operation."
        ]
      ],
      "timeline": [],
      "sources": [
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus",
          "host": "investors.terawulf.com",
          "date": "2026-08-24"
        },
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
          "host": "investors.terawulf.com",
          "date": "2026-07-06"
        },
        {
          "url": "https://www.terawulf.com/our-sites",
          "host": "www.terawulf.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Current operator site directory"
        },
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/0001083301-26-000166.pdf",
          "host": "investors.terawulf.com",
          "published": "2026-08-05",
          "date": "2026-08-05",
          "checked": "2026-10-16",
          "label": "Q2 filing, pages 54–55 reviewed"
        },
        {
          "url": "https://www.justifieddatacampus.com/faq",
          "host": "www.justifieddatacampus.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Project FAQ: site development and cooling design"
        },
        {
          "url": "https://www.justifieddatacampus.com/project-overview",
          "host": "www.justifieddatacampus.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Project overview and prospective timing"
        },
        {
          "url": "https://www.justifieddatacampus.com/newsroom/data-center-noise-levels-at-the-justified-data-campus",
          "host": "www.justifieddatacampus.com",
          "published": "2026-10-12",
          "date": "2026-10-12",
          "checked": "2026-10-16",
          "label": "Project account of noise modelling"
        },
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0000950142-26-000720/eh260751501_8k.htm",
          "host": "investors.terawulf.com",
          "published": "2026-03-16",
          "date": "2026-03-16",
          "checked": "2026-10-16",
          "label": "Raylan / Justified borrower and affiliate roles"
        }
      ],
      "loc": {
        "lat": 37.84153,
        "lng": -86.77784,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "state": "KY",
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hancock County · 401 MW · TeraWulf / Raylan Data",
      "reviewed_evidence": [
        {
          "overlay": "Hawesville primary depth October 16",
          "scope": "Targeted operator/issuer review of Hawesville site development, lease, utility approval and cooling design. Not a physical-site, completed-building, full-order legal, location or whole-state certification.",
          "fields": {
            "site_work_scope": "The undated project FAQ says site development is underway. This supports site development, including brownfield work, not a verified start/completion of data-center halls or an operating facility.",
            "critical_it_contract": {
              "approximately_mw": 401,
              "basis": "contracted critical IT",
              "lease_years": 20,
              "tenant": "Anthropic",
              "source_publication": "2026-07-06",
              "delivered_capacity_established": false
            },
            "electric_service_approval": {
              "up_to_mw": 482,
              "measure": "electric service",
              "order_date_reported_by_operator": "2026-08-21",
              "announcement_date": "2026-08-24",
              "building_occupancy_or_operation_established": false
            },
            "gross_campus_plan": {
              "up_to_mw": 480,
              "measure": "gross data center capacity",
              "basis": "future phased plan",
              "technical_as_of_date": null,
              "source": "current operator directory"
            },
            "delivery_targets": {
              "initial": "second half of 2027",
              "full_401mw": "early 2028",
              "project_faq": "mid-to-late 2027, subject to site planning and permitting",
              "exact_opening_day": null
            },
            "development_forecast": "Operator August 24 estimate of approximately $4.0–4.5 billion for site development and initial data halls, excluding customer computing equipment. Forecast range, not spent investment, incentive or contracted revenue.",
            "land_scope": {
              "project_property_acres": 790,
              "buildable_acres": 250,
              "relationship": "Different operator land measures, not an adopted parcel boundary or exact surveyed acreage; the issuer says more than 250 buildable acres."
            },
            "cooling_design": "Project FAQ describes a planned sealed closed-loop system with air-to-fluid heat rejection and minimal utility water; no Ohio River supply planned. Design statement only, not measured withdrawal/consumption, zero total water use, permit or water right.",
            "developer_legal_roles": "TeraWulf is the project developer brand. March 16 filing identifies Raylan Finance LLC as Holdings, Raylan Data LLC as Borrower and Justified DataPower LLC as affiliate/Real Estate Guarantor. Those financing roles do not certify current parcel title or independent physical sites.",
            "location_hold": "The inherited house point remains county-only and unplotted. Former-smelter context and undated corporate graphics do not establish a verified parcel, roof or address point.",
            "prospective_conflicts": "Project overview retains an expected first-half-2026 construction start subject to planning/permits, while the FAQ says site development is underway. The quarter filing also described expected 2026 commencement. No exact physical start or occupancy day is inferred.",
            "noise_model_scope": "The October 12 project post describes predicted sound at two residential locations and a study of three planned buildings. This is an operator account of modelling, not independent review of the full ERM report, measured noise, legal compliance certification or three completed buildings.",
            "financial_scope": "The July lease revenue forecast is approximately $19 billion over twenty years, not construction investment. The same release’s Abernathy disposition is a separate transaction and campus.",
            "source_limits": "Company pages have no published technical as-of date. Corporate disclosures are field-specific; the PSC docket and relevant order sections were corroborated through the web tool, without local Python retrieval or raw PDF hash/full-order adoption. No contacts or requests were made."
          },
          "notes": [
            "Site development underway is limited to the operator FAQ; data-center halls, opening and delivered IT are unconfirmed.",
            "480 MW gross, 482 MW service and approximately 401 MW IT are different non-additive measures.",
            "County-only house-point protection and all legacy technical figures/forecast text remain unchanged.",
            "Noise values are not normalized without the full study; cooling design does not establish zero water use."
          ],
          "sources": [
            {
              "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
              "host": "investors.terawulf.com",
              "published": "2026-07-06",
              "date": "2026-07-06",
              "checked": "2026-10-16",
              "label": "Anthropic lease announcement"
            },
            {
              "url": "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus",
              "host": "investors.terawulf.com",
              "published": "2026-08-24",
              "date": "2026-08-24",
              "checked": "2026-10-16",
              "label": "Electric-service approval announcement"
            },
            {
              "url": "https://www.terawulf.com/our-sites",
              "host": "www.terawulf.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current operator site directory"
            },
            {
              "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-26-000166/0001083301-26-000166.pdf",
              "host": "investors.terawulf.com",
              "published": "2026-08-05",
              "date": "2026-08-05",
              "checked": "2026-10-16",
              "label": "Q2 filing, pages 54–55 reviewed"
            },
            {
              "url": "https://www.justifieddatacampus.com/faq",
              "host": "www.justifieddatacampus.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Project FAQ: site development and cooling design"
            },
            {
              "url": "https://www.justifieddatacampus.com/project-overview",
              "host": "www.justifieddatacampus.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Project overview and prospective timing"
            },
            {
              "url": "https://www.justifieddatacampus.com/newsroom/data-center-noise-levels-at-the-justified-data-campus",
              "host": "www.justifieddatacampus.com",
              "published": "2026-10-12",
              "date": "2026-10-12",
              "checked": "2026-10-16",
              "label": "Project account of noise modelling"
            },
            {
              "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0000950142-26-000720/eh260751501_8k.htm",
              "host": "investors.terawulf.com",
              "published": "2026-03-16",
              "date": "2026-03-16",
              "checked": "2026-10-16",
              "label": "Raylan / Justified borrower and affiliate roles"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "status_field": "current_status",
      "status_scope": "Operator project FAQ, checked October 16, 2026, says site development is underway. The undated statement supports brownfield/site development only; physical data-hall construction, delivered IT, occupancy and operation remain unconfirmed. The older first-half-2026 target is not a proved start date.",
      "event_evidence": [
        {
          "date": "2026-07-06",
          "text": "TeraWulf announced an Anthropic lease for approximately 401 MW critical IT at Justified. Initial second-half-2027 and full early-2028 delivery are future targets.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
              "host": "investors.terawulf.com",
              "published": "2026-07-06",
              "date": "2026-07-06",
              "checked": "2026-10-16",
              "label": "Anthropic lease announcement"
            }
          ]
        },
        {
          "date": "2026-08-21",
          "text": "Electric-service agreement approval dated August 21, reported in TeraWulf’s August 24 announcement. Up to 482 MW is service capacity, not IT delivery, building approval or operation.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus",
              "host": "investors.terawulf.com",
              "published": "2026-08-24",
              "date": "2026-08-24",
              "checked": "2026-10-16",
              "label": "Electric-service approval announcement"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 401,
          "unit": "MW",
          "basis": "contracted",
          "as_of": "2026-07-06",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Approximately 401 MW leased critical IT across future phases, not delivered or metered load; initial second-half-2027 and full early-2028 targets. Not additive with service or gross capacity.",
          "sources": [
            "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack"
          ]
        },
        {
          "measure": "approved_service",
          "value": 482,
          "unit": "MW",
          "basis": "approved",
          "as_of": "2026-08-21",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Up to 482 MW electric-service agreement approved August 21, according to the August 24 operator announcement. Not IT load, actual demand, building approval or completed service delivery.",
          "sources": [
            "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus"
          ]
        },
        {
          "measure": "site_gross_capacity",
          "value": 480,
          "unit": "MW",
          "basis": "forecast",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-16",
          "scope": "Up to 480 MW future gross data-center capacity in the current undated operator directory; phased plan starting in 2027. Not delivered IT or measured draw.",
          "sources": [
            "https://www.terawulf.com/our-sites"
          ]
        }
      ],
      "typed_water_facts": [
        {
          "measure": "cooling_type",
          "value": "Planned sealed closed-loop cooling with air-to-fluid heat rejection and minimal utility water.",
          "unit": null,
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-16",
          "basis": "operator_reported_statement",
          "scope": "Prospective operator cooling-design statement; Ohio River supply is not planned. Not measured withdrawal or consumption, zero total water use, a permit or a water right.",
          "sources": [
            "https://www.justifieddatacampus.com/faq"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "county_context_only",
        "county_display": "21091"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}