  "schema_version": 1,
  "source_compilation_context": {
    "la": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/la.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "22083",
    "label": "Richland Parish, Louisiana"
  },
  "records": [
    {
      "id": "meta-hyperion-richland-parish-la",
      "state": "la",
      "kind": "project",
      "name": "Meta Hyperion",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "AI data center campus",
      "counties": [
        "Richland"
      ],
      "city": "Delhi vicinity",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated current page says5GWtopline but later says over2GW; retain scope/version discrepancy rather than summing. Compute label is not independently established utility gross or energized load.50B+label is Louisiana investment, not proven site spend. Contracts are committed value, not additional capex. Consumer savings and teacher-bonus claims require independent fiscal evidence before headline use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-13",
          "Meta announced an expansion of its Richland Parish/Hyperion project, describing 5 GW of future compute capacity. The release is not a first-power or operating milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/richland-parish-data-center/",
          "host": "datacenters.atmeta.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
          "host": "datacenters.atmeta.com",
          "published": "2026-07-13",
          "date": "2026-07-13",
          "checked": "2026-10-16",
          "label": "Hyperion expansion announcement"
        },
        {
          "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
          "host": "about.fb.com",
          "published": "2025-10-21",
          "date": "2025-10-21",
          "checked": "2026-10-16",
          "label": "Historical Hyperion venture announcement"
        }
      ],
      "loc": {
        "lat": 32.41738,
        "lng": -91.76324,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "initial_announcement_month": "2024-12",
            "planned_compute_capacity_gw": 5,
            "data_center_investment_louisiana_usd_min_exclusive": 50000000000,
            "forecast_peak_construction_jobs_min_exclusive": 7500,
            "forecast_operational_jobs": 1000,
            "operator_reported_louisiana_contracts_usd_min_exclusive": 1600000000
          },
          "notes": [
            "Undated current page says5GWtopline but later says over2GW; retain scope/version discrepancy rather than summing. Compute label is not independently established utility gross or energized load.50B+label is Louisiana investment, not proven site spend. Contracts are committed value, not additional capex. Consumer savings and teacher-bonus claims require independent fiscal evidence before headline use.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/richland-parish-data-center/",
              "host": "datacenters.atmeta.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-AI-Campus-Depth-20261016",
          "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.",
          "fields": {
            "documented_construction": "Meta describes ongoing work with its general contractors following groundbreaking; the current project page still describes building the Richland Parish campus.",
            "future_compute_capacity_label": "The July 13 expansion announcement labels 5 GW as future compute capacity. It is not independently classified as utility capacity, IT load or metered consumption.",
            "historical_venture_scope": "The October 21, 2025 announcement reports a Meta/Blue Owl funds venture and construction-management role. It is historical transaction context, not a current parcel-title or sole-ownership certification.",
            "compute_capacity_limits": "The 5 GW compute label is a future expansion description. The reviewed source does not define an energized utility/IT boundary or building-level allocation."
          },
          "notes": [
            "Compute capacity is retained in the source wording; no unsupported conversion to IT or utility MW is typed. Regional investment, contractor commitments, jobs and customer savings are different measures and are not site technical totals.",
            "Construction is documented, but a completed campus, opening day and precise site footprint remain unverified.",
            "Earlier retained context noted mixed 5-GW/over-2-GW wording. The current captured page and July 13 expansion announcement state 5 GW of future compute capacity; earlier labels are not represented as current measurements."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
              "host": "datacenters.atmeta.com",
              "published": "2026-07-13",
              "date": "2026-07-13",
              "checked": "2026-10-16",
              "label": "Hyperion expansion announcement"
            },
            {
              "url": "https://datacenters.atmeta.com/richland-parish-data-center/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current Richland Parish project page"
            },
            {
              "url": "https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/",
              "host": "about.fb.com",
              "published": "2025-10-21",
              "date": "2025-10-21",
              "checked": "2026-10-16",
              "label": "Historical Hyperion venture announcement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Delhi vicinity · Richland · Source context reviewed",
      "status_scope": "Meta describes Hyperion/Richland Parish as an active construction and expansion project. Its July 13, 2026 update and current project page do not certify an operating training cluster or energized capacity.",
      "event_evidence": [
        {
          "date": "2026-07-13",
          "text": "Meta announced an expansion of its Richland Parish/Hyperion project, describing 5 GW of future compute capacity. The release is not a first-power or operating milestone.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
              "host": "datacenters.atmeta.com",
              "published": "2026-07-13",
              "date": "2026-07-13",
              "checked": "2026-10-16",
              "label": "Hyperion expansion announcement"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "22083"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}