  "schema_version": 1,
  "source_compilation_context": {
    "la": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/la.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "22125",
    "label": "West Feliciana Parish, Louisiana"
  },
  "records": [
    {
      "id": "hut8-river-bend-west-feliciana-la",
      "state": "la",
      "kind": "project",
      "name": "Hut 8 River Bend AI Data Center Campus",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "AI data center campus",
      "counties": [
        "West Feliciana"
      ],
      "city": "St. Francisville",
      "address": "",
      "who": "Hut 8",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "River Bend: 245 MW contracted IT and 330 MW utility capacity under construction describe the same initial development at different electrical boundaries. They are not additive or metered load; conditional expansion is excluded.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-12-17",
          "Hut 8 announced a 245 MW IT lease for River Bend. This is a commercial announcement, not an opening or physical construction-start day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center",
          "host": "opportunitylouisiana.gov",
          "date": "2025-12-17",
          "published": "2025-12-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
          "host": "www.hut8.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-16",
          "label": "Hut 8 Q2 construction update"
        },
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
          "host": "www.hut8.com",
          "published": "2025-12-17",
          "date": "2025-12-17",
          "checked": "2026-10-16",
          "label": "River Bend lease announcement"
        }
      ],
      "loc": {
        "lat": 30.8759,
        "lng": -91.41253,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "development_announcement_date": "2025-12-17",
            "phase1_investment_usd_max": 10000000000,
            "phase1_initial_utility_capacity_mw": 330,
            "phase1_critical_it_capacity_mw": 245,
            "potential_full_site_utility_capacity_mw_max": 1000,
            "expected_phase1_direct_jobs_min": 75,
            "expected_phase1_indirect_jobs": 193,
            "peak_phase1_construction_workers_approx": 1000,
            "operations_target": "2027-Q2",
            "tenant": "Fluidstack",
            "tenant_lease_backstop": "Google"
          },
          "notes": [
            "330MWutility and245MWcriticalIT are separate scopes, not additive.1000MWfull-site utility potential not operating IT.10Bmaximum phase1investment not audited spend;268jobs includes193indirect. State program participation expected, no paid rebate or executed award value. Reported construction underway not operations.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center",
              "host": "opportunitylouisiana.gov",
              "date": "2025-12-17",
              "published": "2025-12-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-AI-Campus-Depth-20261016",
          "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.",
          "fields": {
            "documented_construction": "Vertical works and the campus substation were in construction in the August 4 update.",
            "initial_utility_capacity": "330 MW of utility capacity under construction; not 330 MW of IT or measured consumption.",
            "contracted_it_capacity": "245 MW of IT capacity in the announced Fluidstack lease, not currently commissioned load.",
            "initial_hall_delivery_target": "Q2 2027, forecast at the August 4 report date; no exact commissioning day.",
            "future_expansion_scope": "Hut 8 describes up to 1,000 MW of additional utility capacity and a distinct Fluidstack right of first offer for up to 1,000 MW of additional IT capacity. Both depend on future expansion; neither is current capacity.",
            "tenant_and_backstop_scope": "Fluidstack is the contracted tenant; Google backs specified payment obligations. This does not make Google the physical operator or certify tenant occupancy.",
            "expansion_source_difference": "The Louisiana announcement describes potential scaling to up to 1,000 MW of utility capacity, while Hut 8 describes up to 1,000 MW of additional utility capacity. These same-day source envelopes differ. The future full-campus limit remains unresolved."
          },
          "notes": [
            "Initial utility service, contracted IT and conditional expansion are different scopes and cannot be added. Earlier retained government context and the operator expansion language remain side by side.",
            "A lease/backstop, projected investment or future delivery quarter does not establish present operation, paid incentives or a verified parcel."
          ],
          "sources": [
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results",
              "host": "www.hut8.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-16",
              "label": "Hut 8 Q2 construction update"
            },
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
              "host": "www.hut8.com",
              "published": "2025-12-17",
              "date": "2025-12-17",
              "checked": "2026-10-16",
              "label": "River Bend lease announcement"
            },
            {
              "url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center",
              "host": "www.opportunitylouisiana.gov",
              "published": "2025-12-17",
              "date": "2025-12-17",
              "checked": "2026-10-16",
              "label": "Louisiana River Bend announcement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "St. Francisville · West Feliciana · Source context reviewed",
      "status_scope": "Hut 8 reported River Bend vertical and substation construction on August 4, 2026. Initial hall delivery remained a Q2 2027 target; operation and the full expansion are not established.",
      "event_evidence": [
        {
          "date": "2025-12-17",
          "text": "Hut 8 announced a 245 MW IT lease for River Bend. This is a commercial announcement, not an opening or physical construction-start day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
              "host": "www.hut8.com",
              "published": "2025-12-17",
              "date": "2025-12-17",
              "checked": "2026-10-16",
              "label": "River Bend lease announcement"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 245,
          "unit": "MW",
          "basis": "contracted",
          "as_of": "2025-12-17",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Initial Fluidstack lease IT capacity; commissioning is future.",
          "sources": [
            "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value"
          ]
        },
        {
          "measure": "utility_capacity",
          "value": 330,
          "unit": "MW",
          "basis": "forecast",
          "as_of": "2026-08-04",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-16",
          "scope": "Initial River Bend utility capacity under construction, not energized load or an issued utility permit.",
          "sources": [
            "https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "22125"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}