{
  "schema_version": 1,
  "source_compilation_context": {
    "me": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/me.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "23007",
    "label": "Franklin County, Maine"
  },
  "records": [
    {
      "id": "sentinel-jay-me",
      "state": "me",
      "kind": "facility",
      "name": "Sentinel Data Centers Androscoggin Mill Campus, Jay",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "Jay",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://themainemonitor.org/jay-backs-data-center-plan/",
          "host": "themainemonitor.org",
          "date": "2026-03-25",
          "published": "2026-03-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.jay-maine.org/warrant-for-november-3-2026-special-town-meeting/",
          "host": "www.jay-maine.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.97407,
        "lng": -70.44379,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Maine Monitor reports Jay’s board voted 4 to 0 with one abstention to prepare a letter supporting JGT2’s proposed former-mill redevelopment for identified client Sentinel.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://themainemonitor.org/jay-backs-data-center-plan/",
              "host": "themainemonitor.org",
              "date": "2026-03-25",
              "published": "2026-03-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The complete original September 16, 2026 Town warrant post describes November 3 ballot questions for mobile home rent stabilization and new commercial ground mounted solar facilities. Those questions are not computing restrictions or a Sentinel computing hearing. A generic Town election, the prior mill closure and private accounts of Sentinel withdrawal do not independently resolve the exact current computing stage, legal outcome or physical closure.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_jay_solar_ballot_not_sentinel_compute_disposition",
              "scope": "The complete original September 16, 2026 Town warrant post describes November 3 ballot questions for mobile home rent stabilization and new commercial ground mounted solar facilities. Those questions are not computing restrictions or a Sentinel computing hearing. A generic Town election, the prior mill closure and private accounts of Sentinel withdrawal do not independently resolve the exact current computing stage, legal outcome or physical closure."
            },
            "source_read_scope": {
              "complete_original_town_warrant_post_body_read": true,
              "solar_moratorium_not_computing_moratorium": true,
              "private_sentinel_withdrawal_not_physical_closure": true
            }
          },
          "notes": [
            "The complete original September 16, 2026 Town warrant post describes November 3 ballot questions for mobile home rent stabilization and new commercial ground mounted solar facilities. Those questions are not computing restrictions or a Sentinel computing hearing. A generic Town election, the prior mill closure and private accounts of Sentinel withdrawal do not independently resolve the exact current computing stage, legal outcome or physical closure.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.jay-maine.org/warrant-for-november-3-2026-special-town-meeting/",
              "host": "www.jay-maine.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Jay · Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23007"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
