{
  "schema_version": 1,
  "source_compilation_context": {
    "me": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/me.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "23015",
    "label": "Lincoln County, Maine"
  },
  "records": [
    {
      "id": "wiscasset-proposed-me",
      "state": "me",
      "kind": "facility",
      "name": "Wiscasset Data Center (Old Ferry Road Site)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lincoln"
      ],
      "city": "Wiscasset",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification. DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/",
          "host": "mainemorningstar.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.wiscasset.gov/m/NewsFlash",
          "host": "www.wiscasset.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wiscasset.gov/DocumentCenter/View/1726/Special-Town-Meeting-Warrant---November-3-2026",
          "host": "www.wiscasset.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wiscasset.gov/DocumentCenter/View/1743/Data-Center-Moratorium-Ordinance---Final",
          "host": "www.wiscasset.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.06476,
        "lng": -69.54326,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification.",
            "DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/",
              "host": "mainemorningstar.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "Complete original election notice and proposed pause text, plus the complete one page warrant text and scan, retain the November 3, 2026 prospective Article4 vote from eight AM to eight PM at Wiscasset Community Center. The signed warrant date and a separate handwritten certification date do not establish ordinance adoption. The pause would take effect upon adoption, with a six month term and stated exceptions, but no adoption or expiry is calculated. This is general municipal policy rather than independently verified current Old Ferry Road computing permission, construction, cancellation or commissioned service. The already retained calendar vote and proposed restriction are not duplicated.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_wiscasset_prospective_policy_exact_old_ferry_stage_held",
              "scope": "Complete original election notice and proposed pause text, plus the complete one page warrant text and scan, retain the November 3, 2026 prospective Article4 vote from eight AM to eight PM at Wiscasset Community Center. The signed warrant date and a separate handwritten certification date do not establish ordinance adoption. The pause would take effect upon adoption, with a six month term and stated exceptions, but no adoption or expiry is calculated. This is general municipal policy rather than independently verified current Old Ferry Road computing permission, construction, cancellation or commissioned service. The already retained calendar vote and proposed restriction are not duplicated."
            },
            "source_read_scope": {
              "complete_original_current_notice_body_read": true,
              "all_original_proposed_pause_text_pages_read": true,
              "complete_original_one_page_warrant_scan_actually_viewed": true,
              "five_select_board_signatures_and_september15_date_read": true,
              "clerk_attestation_signature_line_blank_handwritten_september17_retained": true,
              "november3_not_adoption_yet": true,
              "existing_calendar_and_restriction_not_duplicated": true,
              "exceptions_and_conditional_six_month_term_retained": true
            }
          },
          "notes": [
            "Complete original election notice and proposed pause text, plus the complete one page warrant text and scan, retain the November 3, 2026 prospective Article4 vote from eight AM to eight PM at Wiscasset Community Center. The signed warrant date and a separate handwritten certification date do not establish ordinance adoption. The pause would take effect upon adoption, with a six month term and stated exceptions, but no adoption or expiry is calculated. This is general municipal policy rather than independently verified current Old Ferry Road computing permission, construction, cancellation or commissioned service. The already retained calendar vote and proposed restriction are not duplicated.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.wiscasset.gov/m/NewsFlash",
              "host": "www.wiscasset.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wiscasset.gov/DocumentCenter/View/1726/Special-Town-Meeting-Warrant---November-3-2026",
              "host": "www.wiscasset.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wiscasset.gov/DocumentCenter/View/1743/Data-Center-Moratorium-Ordinance---Final",
              "host": "www.wiscasset.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wiscasset · Lincoln · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23015"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
