{
  "schema_version": 1,
  "source_compilation_context": {
    "mi": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mi.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "26005",
    "label": "Allegan County, Michigan"
  },
  "records": [
    {
      "id": "microsoft-dorr-township-mi",
      "state": "mi",
      "kind": "facility",
      "name": "Microsoft Dorr Township Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Allegan"
      ],
      "city": "Dorr Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No signed ordinance or exact start/expiry retained. Residents allegations about health, water and taxes are not independently adopted effects. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-02-26",
          "Signed Dorr Township minutes record authorization of a 12 month temporary moratorium on new or expanded data centers on February 26, 2026, by six votes to zero. This approval concerns the moratorium, not approval or cancellation of the Microsoft project, an operating shutdown or a verified legal effective day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/",
          "host": "wilcoxnewspapers.com",
          "date": "2026-03-04",
          "published": "2026-03-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
          "host": "www.dorrtownshipmi.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 42.59129,
        "lng": -85.88848,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "twelve-month-moratorium-reported",
            "reported_finding": "TownBroadcast reporting republished by Wilcox says Dorr Township approved twelve-month pause after debate over shorter period.",
            "report_display_date": "2026-03-04",
            "independently_verified_current_status": null
          },
          "notes": [
            "No signed ordinance or exact start/expiry retained. Residents allegations about health, water and taxes are not independently adopted effects.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/",
              "host": "wilcoxnewspapers.com",
              "date": "2026-03-04",
              "published": "2026-03-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "Signed Dorr Township minutes record residents expressing concerns about the Microsoft data center on February 26, 2026. The Board authorized signature of an ordinance imposing a temporary moratorium on new or expanded data centers for 12 months by six votes to zero, after amending an initial nine month motion. This is a township regulatory action. Current individual project construction, permit disposition, operation, the ordinance legal effective day and later amendment history remain unverified. The moratorium is not a project cancellation or a physical shutdown.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "township_moratorium_and_public_comments_physical_stage_held",
              "scope": "Signed Dorr Township minutes record residents expressing concerns about the Microsoft data center on February 26, 2026. The Board authorized signature of an ordinance imposing a temporary moratorium on new or expanded data centers for 12 months by six votes to zero, after amending an initial nine month motion. This is a township regulatory action. Current individual project construction, permit disposition, operation, the ordinance legal effective day and later amendment history remain unverified. The moratorium is not a project cancellation or a physical shutdown."
            },
            "regulatory_scope": {
              "board_action_on": "2026-02-26",
              "minutes_recorded_final_vote": "6 to 0",
              "minutes_recorded_moratorium_duration": "12 months",
              "ordinance_effective_day_established": false,
              "later_ordinance_amendment_history_verified": false,
              "township_not_countywide_rule": true,
              "signed_minutes_pdf_pages_visually_read": [
                1,
                2
              ]
            }
          },
          "notes": [
            "Signed Dorr Township minutes record residents expressing concerns about the Microsoft data center on February 26, 2026. The Board authorized signature of an ordinance imposing a temporary moratorium on new or expanded data centers for 12 months by six votes to zero, after amending an initial nine month motion. This is a township regulatory action. Current individual project construction, permit disposition, operation, the ordinance legal effective day and later amendment history remain unverified. The moratorium is not a project cancellation or a physical shutdown.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
              "host": "www.dorrtownshipmi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Dorr Township · Allegan · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-02-26",
          "text": "Signed Dorr Township minutes record authorization of a 12 month temporary moratorium on new or expanded data centers on February 26, 2026, by six votes to zero. This approval concerns the moratorium, not approval or cancellation of the Microsoft project, an operating shutdown or a verified legal effective day.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
              "host": "www.dorrtownshipmi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "26005"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
