{
  "schema_version": 1,
  "source_compilation_context": {
    "mn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mn.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "27085",
    "label": "McLeod County, Minnesota"
  },
  "records": [
    {
      "id": "aaim-data-centers-hutchinson-mn",
      "state": "mn",
      "kind": "facility",
      "name": "AAIM Data Centers  -  Hutchinson (Minnesota 2 Energy Park)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "McLeod"
      ],
      "city": "Hutchinson",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hutchinson city/utility FAQ,all five pages text reviewed. FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-08-26",
          "The City of Hutchinson FAQ reports that Council approved the named data center project final permits August 26, 2025. This dates the City administrative account, without independent certification of an issued building permit, physical construction or computing service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf",
          "host": "hutchinsonmn.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aaimdc.com/data-centers/minnesota-2/",
          "host": "www.aaimdc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1025+5th+Avenue+SE%2C+Hutchinson%2C+Minnesota&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal original street query, calculated range only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.358715482445%2C44.88206728853755%2C-94.344768517555%2C44.891948711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting; imagery acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -94.351742,
        "lat": 44.887008,
        "precision": "address",
        "basis": "The original City of Hutchinson source names 1025 5th Avenue SE, Hutchinson, Minnesota. One complete literal Census query uniquely supports this calculated street reference. The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Hutchinson city/utility FAQ,all five pages text reviewed",
          "fields": {
            "published_address": "1025 FifthAvenueSE,Hutchinson,Minnesota",
            "city_reported_final_permit_approval_date": "2025-08-26",
            "city_reported_power_agreement_date": "2025-09-24",
            "developer_entity": "B-MNDataCentersInc,dbaAAIMDataCenters",
            "initial_building_area_sqft": 7500,
            "potential_expanded_area_sqft": 15000,
            "expected_peak_power_mw": 20,
            "power_basis": "expected customer load,not explicitly criticalIT",
            "expected_jobs_less_than": 5,
            "city_reported_local_financial_assistance": "none"
          },
          "notes": [
            "FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf",
              "host": "hutchinsonmn.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 58",
          "scope": "The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_city_planning_account_not_compute",
              "scope": "The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields."
            },
            "source_read_scope": {
              "city_faq_selected_text_pages": [
                1,
                2,
                3
              ],
              "full_five_page_faq_not_claimed_read": true,
              "issuer_minnesota2_body_read": true,
              "issuer_exact_city_crosswalk_not_newly_certified": true,
              "prospective_compliance_not_observed_measurement": true,
              "future_expansion_requires_additional_permission": true,
              "file_path_month_not_publication_day": true,
              "utility_mw_per_hour_wording_not_normalized_or_exported": true
            }
          },
          "notes": [
            "The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf",
              "host": "hutchinsonmn.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.aaimdc.com/data-centers/minnesota-2/",
              "host": "www.aaimdc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 74, 2026-10-24",
          "scope": "The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -94.351742,
                "lat": 44.887008,
                "precision": "address",
                "basis": "The original City of Hutchinson source names 1025 5th Avenue SE, Hutchinson, Minnesota. One complete literal Census query uniquely supports this calculated street reference. The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1025 5th Avenue SE, Hutchinson, Minnesota",
              "county_fips": [
                "27085"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. All protected source history, status, roles, quantities, names, addresses and jurisdiction wrappers remain exact.",
            "The inherited general area coordinate was not independently admitted as a reviewed source reference. The original City and Utilities FAQ explicitly identifies the computing project location as 1025 5th Avenue SE and independently names B-MN Data Centers Inc. doing business as AAIM DataCenters. The original August 2025 permit and September 2025 power agreement dates remain administrative source statements. No current operation, changed physical stage, technical quantity, roof, room or full campus is inferred. The PDF publication day remains unknown; its website path is not an exact publication clock. The complete literal query and its independently checked calculated reference are inside the unchanged retained county 27085. The measured correction from the prior Native context is 2.8 metres. This is a source reference review, not a physical relocation. No source setting pixel supplies coordinates or construction stage.",
            "The source setting shows a broad street bordered by substantial buildings, parking, open land, planted trees, water and residential blocks. The street reference selects no computing roof, room, present construction stage or complete campus. Acquisition date is unknown."
          ],
          "sources": [
            {
              "url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf",
              "host": "hutchinsonmn.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original explicit computing project location, separate from mail"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1025+5th+Avenue+SE%2C+Hutchinson%2C+Minnesota&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal original street query, calculated range only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.358715482445%2C44.88206728853755%2C-94.344768517555%2C44.891948711462454&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting; imagery acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Hutchinson · McLeod · Source context reviewed",
      "status_scope": "The original City FAQ names the AAIM and BMN data center project and describes approved plans and future compliance, including analysis after the facility is running. It supports a named listed proposal within the City planning account. The original Minnesota 2 company page says its facility is in design and targeted for a future quarter but identifies only Minnesota rather than an exact City; that generic location is not newly certified as a precise crosswalk. The City account of final permits on August 26, 2025 does not independently certify an issued building permit, construction start or computing operation. A September power purchase agreement also does not prove service. Expected noise, water and utility behavior remain prospective institutional or issuer accounts, without new technical fields.",
      "event_evidence": [
        {
          "date": "2025-08-26",
          "text": "The City of Hutchinson FAQ reports that Council approved the named data center project final permits August 26, 2025. This dates the City administrative account, without independent certification of an issued building permit, physical construction or computing service.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf",
              "host": "hutchinsonmn.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    },
    {
      "id": "revolve-labs-glencoe-mn",
      "state": "mn",
      "kind": "facility",
      "name": "Revolve Labs Glencoe",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "McLeod"
      ],
      "city": "Glencoe",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Maximum headline value is not fixed spent capex. Existing mining operations, proposed AI facilities and another Windom withdrawal are different. Utility net revenue is an attributed historical claim, not project investment or guaranteed bill savings. Noise/health descriptions from elsewhere are not measured Glencoe findings. No IT capacity or later approval established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://crypto.news/bitcoin-miner-revolve-labs-proposes-60m-data-center-in-minnesota/",
          "host": "crypto.news",
          "date": "2024-10-21",
          "published": "2024-10-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 44.8236,
        "lng": -94.27246,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Crypto.news summarizes a preliminary Revolve Labs Glencoe expansion concept, reporting a40-to60-million-USDrange and around ten planned jobs.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Maximum headline value is not fixed spent capex. Existing mining operations, proposed AI facilities and another Windom withdrawal are different. Utility net revenue is an attributed historical claim, not project investment or guaranteed bill savings. Noise/health descriptions from elsewhere are not measured Glencoe findings. No IT capacity or later approval established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://crypto.news/bitcoin-miner-revolve-labs-proposes-60m-data-center-in-minnesota/",
              "host": "crypto.news",
              "date": "2024-10-21",
              "published": "2024-10-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Glencoe · McLeod · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "27085"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
