  "schema_version": 1,
  "source_compilation_context": {
    "mn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mn.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "27131",
    "label": "Rice County, Minnesota"
  },
  "records": [
    {
      "id": "archer-datacenter-faribault-mn",
      "state": "mn",
      "kind": "facility",
      "name": "Archer Datacenter Faribault",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rice"
      ],
      "city": "Faribault",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Faribault official project and review chronology. City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.faribaultmn.gov/815/Archer-Datacenters",
          "host": "faribaultmn.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 44.35423,
        "lng": -93.29673,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Faribault official project and review chronology",
          "fields": {
            "proposed_building_area_sqft_max": 500000,
            "site_acres_approx": 87,
            "proposed_buildings_max": 6,
            "land_purchase_month": "2024-11",
            "city_reported_court_environmental_review_order_date": "2026-06-08",
            "city_reported_supplemental_review_extension_resolution_date": "2026-07-14",
            "supplemental_review_deadline": "2027-03-31",
            "status": "proposed; supplemental environmental review"
          },
          "notes": [
            "City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.faribaultmn.gov/815/Archer-Datacenters",
              "host": "faribaultmn.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 58",
          "scope": "The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_city_explicit_proposal_no_formal_applications",
              "scope": "The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added."
            },
            "source_read_scope": {
              "original_city_current_intro_and_selected_environmental_chronology_read": true,
              "court_outcome_attributed_to_city_not_underlying_opinion": true,
              "supplemental_review_deadline_not_physical_schedule": true,
              "existing_concern_id": "concern:mn-faribault-environmental-review-appeal-record-2026",
              "existing_concern_not_duplicated": true
            }
          },
          "notes": [
            "The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.faribaultmn.gov/815/Archer-Datacenters",
              "host": "www.faribaultmn.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Faribault · Rice · Source context reviewed",
      "status_scope": "The current original City Archer page explicitly describes a proposed development and states that no formal City applications have been submitted. This supports a listed proposal within the City review account. The City chronology records an August 12, 2025 environmental review determination and reports a June 8, 2026 appellate return for additional information or an impact statement, followed by a July 14 extension with supplemental review due March 31, 2027. The underlying court opinion was not independently read. None of those legal or review steps proves construction, operation, final approval or physical closure. The existing Native concern finding already covers this environmental review and appeal episode, so no duplicate concern is added.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "27131"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}