{
  "schema_version": 1,
  "source_compilation_context": {
    "mn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mn.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "27137",
    "label": "St. Louis County, Minnesota"
  },
  "records": [
    {
      "id": "google-hermantown-mn",
      "state": "mn",
      "kind": "project",
      "name": "Google Hermantown Data Center",
      "group": "proposed",
      "status": "Service agreement under review",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Louis"
      ],
      "city": "Hermantown",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnesota PUC named ESA index, no final order reviewed. Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/",
          "host": "mn.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ],
      "loc": {
        "lat": 47.60297,
        "lng": -92.47061,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Minnesota PUC named ESA index, no final order reviewed",
          "fields": {
            "hermantown_service_applicant": "Harmony Group LLC,Alphabet/Google subsidiary",
            "hermantown_esa_filing_date": "2026-03-26",
            "hermantown_utility_docket": "26-159",
            "hermantown_comment_deadline": "2026-08-28"
          },
          "notes": [
            "Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/",
              "host": "mn.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Pending-20261016",
          "scope": "Scoped Google regional identity and lifecycle review; existing approximate points, jurisdiction, legacy totals and opening fields are retained.",
          "fields": {
            "record_association_scope": "Explicit association of the existing named Google Hermantown, Minnesota research context with the primary named location. This does not resolve a parcel, building allocation or distinct physical-site census; inherited project-code aliases are retained rather than independently certified.",
            "electric_service_agreement_review": {
              "utility": "Minnesota Power",
              "named_counterparty": "Harmony Group, LLC",
              "reported_affiliation": "Alphabet/Google subsidiary, as identified by the PUC",
              "docket": "26-159",
              "filed_on": "2026-03-26",
              "status": "Under review on the cited PUC summary",
              "scope": "Public regulatory context only; no legal entity/ownership crosswalk or load figure is inferred."
            },
            "current_status_basis": "The Minnesota PUC currently lists Minnesota Power/Harmony Group LLC’s Hermantown electric service agreement as under review, filed March26,2026. The regulator identifies the Google affiliation. A filed agreement is not PUC approval, a construction permit, an energized facility or commissioned power; the page’s elapsed comment deadline does not prove a decision."
          },
          "notes": [
            "Partial record/field review only. No point movement, exact opening day, commissioned IT capacity, or whole-state freshness certification."
          ],
          "sources": [
            {
              "url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/",
              "host": "mn.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Minnesota Public Utilities Commission reviewed primary source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hermantown · St. Louis · Source context reviewed",
      "status_scope": "The Minnesota PUC currently lists Minnesota Power/Harmony Group LLC’s Hermantown electric service agreement as under review, filed March26,2026. The regulator identifies the Google affiliation. A filed agreement is not PUC approval, a construction permit, an energized facility or commissioned power; the page’s elapsed comment deadline does not prove a decision.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "27137"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
