{
  "schema_version": 1,
  "source_compilation_context": {
    "ms": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ms.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "28087",
    "label": "Lowndes County, Mississippi"
  },
  "records": [
    {
      "id": "greenidge-columbus-ms",
      "state": "ms",
      "kind": "facility",
      "name": "Columbus Bitcoin Mining Facility (formerly Greenidge Columbus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Lowndes"
      ],
      "city": "Columbus",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. LMFunding originalissuer September18,2025 announcement says acquisitionCLOSED forColumbusMS11MWsite/approximately2300miners fromGreenidge for4Mtotalconsideration. NowhostedunderPowerComputebrand; do notsilentlyrenamehistoricalissuer/currentownerwithoutscopeddate. Original8K,deedandcurrent2026ownershipunread. 11MWfacilityminingcapacity versus7.5MWoperationalminers/157PHs are distinct; neither labeledcriticalIT.26MWfleet expectedtotalINCLUDES11, not37.1.3Msecuredloan PARTfunds4Mdeal, not5.3Mcapex. Approx3.6c/kWhpower-priceclaim notexecutedall-inrate/guaranteed2026price. Acquiredminersnotnewemployees/buildings; TampaHQnotMSpremises. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.",
      "date": "",
      "events": [
        [
          "2025-09-18",
          "The original LM Funding September 18, 2025 release reports closing acquisition of the Columbus mining site and equipment. The statement dates the reported transaction without changing corporate roles, certifying present mining output or dating the facility first opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and",
          "host": "power-compute.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.47297,
        "lng": -88.44349,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-original-transactions-and-legal-stage-review-round73-2026-10-15.json",
          "scope": "Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.",
          "fields": {},
          "notes": [
            "LMFunding originalissuer September18,2025 announcement says acquisitionCLOSED forColumbusMS11MWsite/approximately2300miners fromGreenidge for4Mtotalconsideration. NowhostedunderPowerComputebrand; do notsilentlyrenamehistoricalissuer/currentownerwithoutscopeddate. Original8K,deedandcurrent2026ownershipunread.",
            "11MWfacilityminingcapacity versus7.5MWoperationalminers/157PHs are distinct; neither labeledcriticalIT.26MWfleet expectedtotalINCLUDES11, not37.1.3Msecuredloan PARTfunds4Mdeal, not5.3Mcapex. Approx3.6c/kWhpower-priceclaim notexecutedall-inrate/guaranteed2026price. Acquiredminersnotnewemployees/buildings; TampaHQnotMSpremises.",
            "Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."
          ],
          "sources": [
            {
              "url": "https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and",
              "host": "power-compute.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 75",
          "scope": "The complete original September 18, 2025 issuer release reports closing an acquisition of the Columbus mining site and describes operational mining equipment at that historical transaction scope. This is an attributed acquisition account, without an independently read present facility service or complete current corporate crosswalk. Future deployment, site power, miner counts and electricity pricing are not independently certified current production or installed capacity. The legacy Greenidge label is not silently replaced with a different owner or operating role.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_columbus_operational_acquisition_current_service_held",
              "scope": "The complete original September 18, 2025 issuer release reports closing an acquisition of the Columbus mining site and describes operational mining equipment at that historical transaction scope. This is an attributed acquisition account, without an independently read present facility service or complete current corporate crosswalk. Future deployment, site power, miner counts and electricity pricing are not independently certified current production or installed capacity. The legacy Greenidge label is not silently replaced with a different owner or operating role."
            },
            "source_read_scope": {
              "complete_original_issuer_release_and_forward_looking_limits_read": true,
              "historical_operational_equipment_not_current_full_service_certification": true,
              "no_ownership_role_capacity_or_power_price_changes": true
            }
          },
          "notes": [
            "The complete original September 18, 2025 issuer release reports closing an acquisition of the Columbus mining site and describes operational mining equipment at that historical transaction scope. This is an attributed acquisition account, without an independently read present facility service or complete current corporate crosswalk. Future deployment, site power, miner counts and electricity pricing are not independently certified current production or installed capacity. The legacy Greenidge label is not silently replaced with a different owner or operating role.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and",
              "host": "www.power-compute.com",
              "published": "2025-09-18",
              "date": "2025-09-18",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Columbus · Lowndes · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-09-18",
          "text": "The original LM Funding September 18, 2025 release reports closing acquisition of the Columbus mining site and equipment. The statement dates the reported transaction without changing corporate roles, certifying present mining output or dating the facility first opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and",
              "host": "www.power-compute.com",
              "published": "2025-09-18",
              "date": "2025-09-18",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28087"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
