{
  "schema_version": 1,
  "source_compilation_context": {
    "ms": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ms.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "28089",
    "label": "Madison County, Mississippi"
  },
  "records": [
    {
      "id": "aws-costas-ridgeland-ms",
      "state": "ms",
      "kind": "facility",
      "name": "AWS Costas Property Campus (Ridgeland)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Ridgeland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://magnoliatribune.com/?p=118379",
          "host": "magnoliatribune.com",
          "date": "2024-07-24",
          "published": "2024-07-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
          "host": "www.aboutamazon.com",
          "published": "2026-04-09",
          "date": "2026-04-09",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.63505,
        "lng": -90.03336,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Magnolia Tribune identifies Costas/Ridgeland and Canton sites within a combined Madison County AWS plan, with 2027 completion forecast.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://magnoliatribune.com/?p=118379",
              "host": "magnoliatribune.com",
              "date": "2024-07-24",
              "published": "2024-07-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 75",
          "scope": "The complete original Amazon statewide update describes Madison County investment and a Canton campus, but does not independently name the inherited Costas Ridgeland record or establish its exact campus crosswalk. Regional construction and operational staffing do not independently commission this exact record. A Canton water forecast is not a Ridgeland measured resource result. Current physical stage and separate campus identity remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "regional_amazon_account_exact_costas_ridgeland_crosswalk_held",
              "scope": "The complete original Amazon statewide update describes Madison County investment and a Canton campus, but does not independently name the inherited Costas Ridgeland record or establish its exact campus crosswalk. Regional construction and operational staffing do not independently commission this exact record. A Canton water forecast is not a Ridgeland measured resource result. Current physical stage and separate campus identity remain held."
            },
            "source_read_scope": {
              "complete_original_statewide_issuer_body_read": true,
              "county_or_canton_not_automatic_ridgeland_identity": true,
              "no_regional_staffing_or_water_forecast_as_exact_operation": true
            }
          },
          "notes": [
            "The complete original Amazon statewide update describes Madison County investment and a Canton campus, but does not independently name the inherited Costas Ridgeland record or establish its exact campus crosswalk. Regional construction and operational staffing do not independently commission this exact record. A Canton water forecast is not a Ridgeland measured resource result. Current physical stage and separate campus identity remain held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
              "host": "www.aboutamazon.com",
              "published": "2026-04-09",
              "date": "2026-04-09",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ridgeland · Madison · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28089"
      }
    },
    {
      "id": "aws-project-atlas-madison-county-ms",
      "state": "ms",
      "kind": "facility",
      "name": "AWS Project Atlas - Madison County Mega Site (Canton)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Canton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined one GW and ten-billion-USD investment are regional plans, not each site. Groundbreaking is not operation; quoted spring-2027 target remains a forecast. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://siteselection.com/amazon-delivers-record-package-to-mississippi/",
          "host": "siteselection.com",
          "date": "2024-06-19",
          "published": "2024-06-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
          "host": "www.aboutamazon.com",
          "published": "2026-04-09",
          "date": "2026-04-09",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.65147,
        "lng": -90.05127,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Site Selection reports May 20 AWS Madison County groundbreaking and two-campus development goals.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Combined one GW and ten-billion-USD investment are regional plans, not each site. Groundbreaking is not operation; quoted spring-2027 target remains a forecast.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://siteselection.com/amazon-delivers-record-package-to-mississippi/",
              "host": "siteselection.com",
              "date": "2024-06-19",
              "published": "2024-06-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 75",
          "scope": "The original Amazon statewide update describes two Madison County development campuses and past groundbreaking in the region. It does not independently name the exact inherited Project Atlas record or allocate all construction and operational references to that specific campus. The total statewide investment and prospective 2027 recycled water use are separate from commissioned computing and current measured consumption. No precise groundbreaking day, operating date, additional phase or campus merge is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "regional_madison_construction_exact_project_atlas_scope_held",
              "scope": "The original Amazon statewide update describes two Madison County development campuses and past groundbreaking in the region. It does not independently name the exact inherited Project Atlas record or allocate all construction and operational references to that specific campus. The total statewide investment and prospective 2027 recycled water use are separate from commissioned computing and current measured consumption. No precise groundbreaking day, operating date, additional phase or campus merge is inferred."
            },
            "source_read_scope": {
              "complete_original_statewide_issuer_body_read": true,
              "two_county_campuses_not_merged_into_named_atlas": true,
              "relative_two_years_not_invented_groundbreaking_day": true,
              "no_statewide_quantities_or_current_water_measurement_adopted": true
            }
          },
          "notes": [
            "The original Amazon statewide update describes two Madison County development campuses and past groundbreaking in the region. It does not independently name the exact inherited Project Atlas record or allocate all construction and operational references to that specific campus. The total statewide investment and prospective 2027 recycled water use are separate from commissioned computing and current measured consumption. No precise groundbreaking day, operating date, additional phase or campus merge is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
              "host": "www.aboutamazon.com",
              "published": "2026-04-09",
              "date": "2026-04-09",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Canton · Madison · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28089"
      }
    },
    {
      "id": "prado-ai-jackson-metro-ms",
      "state": "ms",
      "kind": "facility",
      "name": "Prado AI / PraCon Global AI Industrial Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Ridgeland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/",
          "host": "web.archive.org",
          "date": "2026-06-01",
          "published": "2026-06-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.60083,
        "lng": -90.03035,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "MississippiToday reports PSC declined to issue requested declaratory opinion on PradoAI private generation/tenant-supply proposal because facts were insufficient and premature. Developer planned to proceed but still sought financing; exact location changed from Ridgeland to unspecified Jacksonmetro.",
            "independently_verified_current_operating_status": null,
            "reported_regulatory_action": "Declined requested declaratory opinion due insufficient facts",
            "regulatory_permission_verified": false,
            "exact_campus_location_verified": false
          },
          "notes": [
            "Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/",
              "host": "web.archive.org",
              "date": "2026-06-01",
              "published": "2026-06-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ridgeland · Madison · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "28089"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
