{
  "schema_version": 1,
  "source_compilation_context": {
    "mo": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mo.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "29095",
    "label": "Jackson County, Missouri"
  },
  "records": [
    {
      "id": "nebius-independence-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Nebius AI Factory (Independence)",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Independence",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.arconational.com/nebius-independence-mo/",
          "host": "arconational.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.00837,
        "lng": -94.34625,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "ARCO's project page labels Nebius Independence under construction and describes a first 200 MW computing-capacity building of about 490,000 square feet within a planned 1.2 GW campus.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.arconational.com/nebius-independence-mo/",
              "host": "arconational.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "contractor_explicit_named_independence_construction",
              "scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed."
            },
            "source_read_scope": {
              "complete_original_current_contractor_project_body_read": true,
              "explicit_under_construction_not_completed_build": true,
              "first_building_not_full_campus_commissioning": true,
              "no_rate_water_noise_or_capacity_certification": true
            }
          },
          "notes": [
            "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.arconational.com/nebius-independence-mo/",
              "host": "www.arconational.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Independence · Jackson · Source context reviewed",
      "status_scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29095"
      }
    },
    {
      "id": "patmos-kansas-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Patmos KC Star Building Campus",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-01-12",
          "The original Patmos January 12, 2026 release announces financing for continued conversion and infrastructure work at its Kansas City campus. The loan announcement is separate from exact completion of the forecast March work or computing commissioning across the campus."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/",
          "host": "kctv5.com",
          "date": "2026-01-12",
          "published": "2026-01-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
          "host": "www.patmos.tech",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Named computing facility or project street in original source body"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1601+McGee+Street%2C+Kansas+City%2C+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street response and county context"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.58623606447564%2C39.09006428853755%2C-94.57350393552436%2C39.09994571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        },
        {
          "url": "https://www.patmos.tech/tech-campus",
          "host": "www.patmos.tech",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lng": -94.57987,
        "lat": 39.095005,
        "precision": "address",
        "basis": "The original January 12, 2026 operator announcement identifies the former Kansas City Star property and mixed use AI campus at 1601 McGee Street, Kansas City, Missouri. One complete literal Census street range supplies only a calculated reference in Jackson County, without selecting a data hall, tenant room or roof boundary. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "KCTV5 reports Patmos bought the former KC Star building after occupying part of it and announced a 100-million-USD clean-energy loan for further improvements.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/",
              "host": "kctv5.com",
              "date": "2026-01-12",
              "published": "2026-01-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 55, October 23, 2026",
          "scope": "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -94.57987,
                "lat": 39.095005,
                "precision": "address",
                "basis": "The original January 12, 2026 operator announcement identifies the former Kansas City Star property and mixed use AI campus at 1601 McGee Street, Kansas City, Missouri. One complete literal Census street range supplies only a calculated reference in Jackson County, without selecting a data hall, tenant room or roof boundary. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1601 McGee Street, Kansas City, MO",
              "county_fips": [
                "29095"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named operator announcement explicitly ties 1601 McGee Street to its former newspaper property retrofit and AI data center project. The general technology campus page is corroboration only. Financing amounts, executed leases, forecast March 2026 completion and reported earlier buildouts do not create new roles, physical stages, quantities or opening events in this location review.",
            "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
            "Dense downtown blocks, large roof forms, road corridors, parking and an arena are visible. The source numeric street identifies the former newspaper property without selecting an individual data hall, tenant space, roof boundary or current computing milestone.",
            "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official sources now support only the bounded reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, without a claim of physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
              "host": "www.patmos.tech",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Named computing facility or project street in original source body"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1601+McGee+Street%2C+Kansas+City%2C+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street response and county context"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.58623606447564%2C39.09006428853755%2C-94.57350393552436%2C39.09994571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_named_kansascity_continued_construction_account",
              "scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster."
            },
            "source_read_scope": {
              "complete_original_issuer_release_and_current_general_campus_body_read": true,
              "continued_work_explicit_not_inferred_from_loan_alone": true,
              "forecast_march2026_not_accomplished": true,
              "signed_tenants_and_built_capacity_not_full_campus_operation": true,
              "no_financial_capacity_or_role_fields_changed": true
            }
          },
          "notes": [
            "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
              "host": "www.patmos.tech",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.patmos.tech/tech-campus",
              "host": "www.patmos.tech",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Kansas City · Jackson · Source context reviewed",
      "status_scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.",
      "event_evidence": [
        {
          "date": "2026-01-12",
          "text": "The original Patmos January 12, 2026 release announces financing for continued conversion and infrastructure work at its Kansas City campus. The loan announcement is separate from exact completion of the forecast March work or computing commissioning across the campus.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
              "host": "www.patmos.tech",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ]
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
