  "schema_version": 1,
  "source_compilation_context": {
    "mo": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mo.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "29165",
    "label": "Platte County, Missouri"
  },
  "records": [
    {
      "id": "lambda-kansas-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Lambda Kansas City AI Supercomputer",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Platte"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-28",
          "The original Missouri and Lambda October 28, 2025 releases announce a proposed Kansas City factory conversion and forecast an early 2026 launch. This dates the proposal announcement without certifying the forecast was accomplished or particular computing equipment was installed."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
          "host": "ded.mo.gov",
          "date": "2025-10-28",
          "published": "2025-10-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
          "host": "lambda.ai",
          "published": "2025-10-28",
          "date": "2025-10-28",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.38017,
        "lng": -94.7737,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "historical_status": "planned conversion of unoccupied building",
            "existing_building_year": 2009,
            "initial_power_mw": 24,
            "initial_power_basis": "capacity, not independently defined as gross or critical IT",
            "future_power_mw_lower_bound": 100,
            "launch_target": "early 2026",
            "initial_phase_investment_usd_lower_bound": 500000000,
            "state_program_as_reported": "Data Center Sales Tax Exemption Program"
          },
          "notes": [
            "Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
              "host": "ded.mo.gov",
              "date": "2025-10-28",
              "published": "2025-10-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "state_and_issuer_named_kansascity_conversion_proposal",
              "scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted."
            },
            "source_read_scope": {
              "complete_original_state_and_issuer_release_bodies_read": true,
              "early2026_forecast_not_actual_launch": true,
              "incentive_not_operation": true,
              "no_gpu_tenant_capacity_or_role_changes": true
            }
          },
          "notes": [
            "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
              "host": "ded.mo.gov",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
              "host": "lambda.ai",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kansas City · Platte · Source context reviewed",
      "status_scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.",
      "event_evidence": [
        {
          "date": "2025-10-28",
          "text": "The original Missouri and Lambda October 28, 2025 releases announce a proposed Kansas City factory conversion and forecast an early 2026 launch. This dates the proposal announcement without certifying the forecast was accomplished or particular computing equipment was installed.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
              "host": "ded.mo.gov",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
              "host": "lambda.ai",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29165"
      }
    },
    {
      "id": "shenandoah-project-kestrel-kc-northland-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Project Kestrel",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Platte"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Port KC Kestrel source arithmetic and project-identity limits. Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-08-26",
          "The original Port KC August 26, 2025 release announces the planned Kestrel Northland campus and forecasts first phase construction in 2026. This is an announcement date without proof the future construction start, full buildout or computing operation occurred."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
          "host": "portkc.com",
          "date": "2025-08-26",
          "published": "2025-08-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.39301,
        "lng": -94.78771,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Port KC Kestrel source arithmetic and project-identity limits",
          "fields": {
            "agency": "Port KC",
            "project": "Project Kestrel",
            "announcement_date": "2025-08-26",
            "site": "KCI-29 industrial mega site, Kansas City, Missouri",
            "planned_site_acres": 379,
            "planned_hyperscale_buildings": 6,
            "planned_full_buildout_sqft_max": 1800000,
            "headline_projected_investment_usd": 100000000000,
            "expected_jobs_per_phase_approx": 50,
            "first_phase_construction_target_year": 2026,
            "forecast_new_tax_revenue_over_bond_term_usd_min_exclusive": 110000000,
            "stated_workforce_fee_usd_per_sqft": 0.25,
            "stated_workforce_forecast_usd": 15750000
          },
          "notes": [
            "Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
              "host": "portkc.com",
              "date": "2025-08-26",
              "published": "2025-08-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "public_port_named_kestrel_campus_proposal",
              "scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance."
            },
            "source_read_scope": {
              "complete_original_public_port_release_body_read": true,
              "forecast2026_construction_not_accomplished": true,
              "unnamed_end_user_not_inferred": true,
              "no_jobs_tax_water_energy_or_capacity_fields_changed": true
            }
          },
          "notes": [
            "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
              "host": "portkc.com",
              "published": "2025-08-26",
              "date": "2025-08-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kansas City · Platte · Source context reviewed",
      "status_scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.",
      "event_evidence": [
        {
          "date": "2025-08-26",
          "text": "The original Port KC August 26, 2025 release announces the planned Kestrel Northland campus and forecasts first phase construction in 2026. This is an announcement date without proof the future construction start, full buildout or computing operation occurred.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
              "host": "portkc.com",
              "published": "2025-08-26",
              "date": "2025-08-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29165"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}