{
  "schema_version": 1,
  "source_compilation_context": {
    "mt": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mt.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "30083",
    "label": "Richland County, Montana"
  },
  "records": [
    {
      "id": "nydig-dfm-kraken-richland-mt",
      "state": "mt",
      "kind": "facility",
      "name": "NYDIG DFM Kraken Central Site",
      "group": "operating",
      "status": "Agency reported existing operations",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Richland"
      ],
      "city": "Sidney vicinity (unincorporated)",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. final Montana air permit identity, point and equipment scope. Final effective air permit is established, but engine horsepower is not critical IT MW and does not prove current workload or site opening. VOC limit change is a permitted standard, not a measured emissions exceedance. New York mailing office is not the Montana facility. Source prints both minus sign and W for longitude; retained ordinary western signed coordinate without a second inversion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-11-15",
          "The original DEQ cover and permit state that Kraken permit 5262-05 became final and effective on November 15, 2025. This is an administrative permit date rather than a first computing opening or measured compliance finding."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
          "host": "deq.mt.gov",
          "date": "2025-11-17",
          "published": "2025-11-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 47.78791,
        "lng": -104.56146,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "final Montana air permit identity, point and equipment scope",
          "fields": {
            "permittee": "NYDIG DFM LLC",
            "site_name": "Kraken Central Site",
            "air_permit": "MAQP 5262-05",
            "permit_final_effective_date": "2025-11-15",
            "agency_posting_date": "2025-11-17",
            "published_location": "Section 8, Township 25 North, Range 59 East, approximately 15.2 miles northeast of Sidney, Richland County, Montana",
            "agency_published_point": {
              "latitude": 47.934,
              "longitude": -104.137,
              "geo_precision": "agency site reference point, not independently parcel geocoded"
            },
            "permitted_rich_burn_natural_gas_engines_max": 7,
            "permitted_engine_brake_horsepower_each_max": 2500
          },
          "notes": [
            "Final effective air permit is established, but engine horsepower is not critical IT MW and does not prove current workload or site opening. VOC limit change is a permitted standard, not a measured emissions exceedance. New York mailing office is not the Montana facility. Source prints both minus sign and W for longitude; retained ordinary western signed coordinate without a second inversion.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
              "host": "deq.mt.gov",
              "date": "2025-11-17",
              "published": "2025-11-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_explicit_existing_kraken_operations",
              "scope": "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings."
            },
            "source_read_scope": {
              "original_physical_pages1_2_3_8_23_24_read": true,
              "selected_assessment_existing_operations_text_read": true,
              "complete_49_page_packet_not_claimed": true,
              "explicit_process_description_not_permit_alone": true,
              "no_emissions_capacity_or_location_change": true
            }
          },
          "notes": [
            "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
              "host": "deq.mt.gov",
              "published": "2025-11-17",
              "date": "2025-11-17",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sidney vicinity (unincorporated) · Richland · Source context reviewed",
      "status_scope": "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings.",
      "event_evidence": [
        {
          "date": "2025-11-15",
          "text": "The original DEQ cover and permit state that Kraken permit 5262-05 became final and effective on November 15, 2025. This is an administrative permit date rather than a first computing opening or measured compliance finding.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
              "host": "deq.mt.gov",
              "published": "2025-11-17",
              "date": "2025-11-17",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30083"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
