{
  "schema_version": 1,
  "source_compilation_context": {
    "ne": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ne.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "31001",
    "label": "Adams County, Nebraska"
  },
  "records": [
    {
      "id": "fortitude-prosser-ne",
      "state": "ne",
      "kind": "facility",
      "name": "Fortitude Prosser Nebraska Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Adams"
      ],
      "city": "Prosser",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. WillVraspir HastingsTribune January4,2024 (updatedFeb27,2025) originalmeetingreport names A-NE/AAIM2.64acreProsser proposal near82nd/Overland/Hayland.6-1planningRECOMMENDATION withsiteplan/setbackconditions; countyboardJanuary16stillfuture. Notfinalpermit/2026Fortitudeownershipproofalone. 12.5MW SUBSTATION planned, notcertifiedIT. Noise measurements fromMexicoMISSOURI OTHERfacilitynotProsserreadings; reported55dB/hour/propertyrules not currentcompliancetest. Upfrontconnectioncostscreditedlater notblanketutilitygift. FortitudeissueracquisitionbelowprovideslaternamedProssercontext, no unverifieddeedlinkclaim. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified. FortitudeoriginalissuerBWmainbodyreadwithweb; ordinarylocalcapturetimeout, nohash/HTTPstatusinvented. AnnouncementURLAugust4,2026 versusissuerindexAugust8 listingdiscrepancyheld; preciseclosingdayunknown. IssuersaysProsser12.5MWrealpropertyassetacquisitionCOMPLETEDandgeneratingrevenueatclose, notnewgreenfieldconstruction. 6.25Mpurchaseprice versusapproximately4.7MNEWCASH aftercredits/deposits, not10.95Mtotalcapex.985khostingcredit/465500minerscreditcomponentsnotextraacquisitions.67kVsubstationnot67MW.12.5MWcontractedpowernotexplicitIT;60MWseven-siteportfolioINCLUDESsite.4.5c/kWhESTIMATEnot2026executedall-intariff. Mergerstillproposed, notcompletedHeartSciencesownership.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.hastingstribune.com/news/adams-county-planning-and-zoning-commission-recommends-conditional-use-permit-for-countys-first-data-center/article_b39985d2-ab6e-11ee-9c27-832166c0311a.html",
          "host": "hastingstribune.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.businesswire.com/news/home/20260804871523/en/Fortitude-Completes-Acquisition-of-12.5-MW-Prosser-Nebraska-Facility",
          "host": "businesswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://fortitudemining.com/investors/",
          "host": "fortitudemining.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.52449,
        "lng": -98.50118,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "WillVraspir HastingsTribune January4,2024 (updatedFeb27,2025) originalmeetingreport names A-NE/AAIM2.64acreProsser proposal near82nd/Overland/Hayland.6-1planningRECOMMENDATION withsiteplan/setbackconditions; countyboardJanuary16stillfuture. Notfinalpermit/2026Fortitudeownershipproofalone.",
            "12.5MW SUBSTATION planned, notcertifiedIT. Noise measurements fromMexicoMISSOURI OTHERfacilitynotProsserreadings; reported55dB/hour/propertyrules not currentcompliancetest. Upfrontconnectioncostscreditedlater notblanketutilitygift. FortitudeissueracquisitionbelowprovideslaternamedProssercontext, no unverifieddeedlinkclaim.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.hastingstribune.com/news/adams-county-planning-and-zoning-commission-recommends-conditional-use-permit-for-countys-first-data-center/article_b39985d2-ab6e-11ee-9c27-832166c0311a.html",
              "host": "hastingstribune.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "FortitudeoriginalissuerBWmainbodyreadwithweb; ordinarylocalcapturetimeout, nohash/HTTPstatusinvented. AnnouncementURLAugust4,2026 versusissuerindexAugust8 listingdiscrepancyheld; preciseclosingdayunknown. IssuersaysProsser12.5MWrealpropertyassetacquisitionCOMPLETEDandgeneratingrevenueatclose, notnewgreenfieldconstruction.",
            "6.25Mpurchaseprice versusapproximately4.7MNEWCASH aftercredits/deposits, not10.95Mtotalcapex.985khostingcredit/465500minerscreditcomponentsnotextraacquisitions.67kVsubstationnot67MW.12.5MWcontractedpowernotexplicitIT;60MWseven-siteportfolioINCLUDESsite.4.5c/kWhESTIMATEnot2026executedall-intariff. Mergerstillproposed, notcompletedHeartSciencesownership.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.businesswire.com/news/home/20260804871523/en/Fortitude-Completes-Acquisition-of-12.5-MW-Prosser-Nebraska-Facility",
              "host": "businesswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 73",
          "scope": "The original issuer investor index carries a Prosser acquisition announcement with an August 8, 2026 display date while its linked distributor URL contains an August 4 date segment. The linked full release host was unavailable at robots. No acquisition or publication day is silently harmonized, and a title or acquisition does not independently establish exact present computing operation. The denied full body, alleged County permission and technical capacity are not adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_index_acquisition_title_date_conflict_current_stage_held",
              "scope": "The original issuer investor index carries a Prosser acquisition announcement with an August 8, 2026 display date while its linked distributor URL contains an August 4 date segment. The linked full release host was unavailable at robots. No acquisition or publication day is silently harmonized, and a title or acquisition does not independently establish exact present computing operation. The denied full body, alleged County permission and technical capacity are not adopted."
            },
            "source_read_scope": {
              "complete_original_issuer_index_read": true,
              "index_display_day_and_link_path_date_not_harmonized": true,
              "linked_denied_release_not_adopted": true,
              "no_exact_acquisition_event_or_current_operation_inferred": true
            }
          },
          "notes": [
            "The original issuer investor index carries a Prosser acquisition announcement with an August 8, 2026 display date while its linked distributor URL contains an August 4 date segment. The linked full release host was unavailable at robots. No acquisition or publication day is silently harmonized, and a title or acquisition does not independently establish exact present computing operation. The denied full body, alleged County permission and technical capacity are not adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://fortitudemining.com/investors/",
              "host": "fortitudemining.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Prosser · Adams · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "31001"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
