{
  "schema_version": 1,
  "source_compilation_context": {
    "ne": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ne.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "31167",
    "label": "Stanton County, Nebraska"
  },
  "records": [
    {
      "id": "jigowatt-stanton-ne",
      "state": "ne",
      "kind": "facility",
      "name": "Jigowatt Stanton Bitcoin Mine",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Stanton"
      ],
      "city": "Stanton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. FlatwaterJune27,2025originalJigowattStantonreport:20MWthenexistingCOUNTYload/70MWrequestedfuture not90MWorIT. PriorNorthernData40ac2021cloudplanpaused/soldwithoutgroundbreaking;Jigowattpods2023differentoperation. Separate4acNorfolksiteunmerged.20Mapproxinfraprogramincludes11Mline/9.5Msubstations,notsummedagainorDCcapex.5Mlettersofcreditcollateralnotpaidcost/rebate;100kparkpledge,paymentunverified.2024taxBILLS98kpersonal+18krealnotcashcollections/current2026taxes. Eminentdomainappealsongoingnotfinallegalityfinding;healthsymptomsresidentreportsnotcausation;partialimmersionconversionnotalltenantfanseliminated. Sourcecommentsnotadopted. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.",
      "date": "",
      "events": [
        [
          "2023-08-10",
          "The original NPPD minutes record August 10, 2023 adoption of resolution 23 40 authorizing preliminary transmission routing and public involvement for the proposed Jigowatt computing load. This is a utility planning action rather than completed transmission, computing construction or the forecast November 2025 service date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://flatwaterfreepress.org/a-nebraska-crypto-company-wants-to-get-bigger-landowners-decry-nppds-use-of-eminent-domain-that-will-help-it-grow/",
          "host": "flatwaterfreepress.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://docs.nppd.com/Board/2023/2023AugustMinutes.pdf",
          "host": "docs.nppd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.91697,
        "lng": -97.19392,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcome-and-source-scope-review-round48-2026-10-14.json",
          "scope": "Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.",
          "fields": {
            "dated_reported_context": "FlatwaterJune27,2025originalJigowattStantonreport:20MWthenexistingCOUNTYload/70MWrequestedfuture not90MWorIT. PriorNorthernData40ac2021cloudplanpaused/soldwithoutgroundbreaking;Jigowattpods2023differentoperation. Separate4acNorfolksiteunmerged.20Mapproxinfraprogramincludes11Mline/9.5Msubstations,notsummedagainorDCcapex.5Mlettersofcreditcollateralnotpaidcost/rebate;100kparkpledge,paymentunverified.2024taxBILLS98kpersonal+18krealnotcashcollections/current2026taxes. Eminentdomainappealsongoingnotfinallegalityfinding;healthsymptomsresidentreportsnotcausation;partialimmersionconversionnotalltenantfanseliminated. Sourcecommentsnotadopted."
          },
          "notes": [
            "FlatwaterJune27,2025originalJigowattStantonreport:20MWthenexistingCOUNTYload/70MWrequestedfuture not90MWorIT. PriorNorthernData40ac2021cloudplanpaused/soldwithoutgroundbreaking;Jigowattpods2023differentoperation. Separate4acNorfolksiteunmerged.20Mapproxinfraprogramincludes11Mline/9.5Msubstations,notsummedagainorDCcapex.5Mlettersofcreditcollateralnotpaidcost/rebate;100kparkpledge,paymentunverified.2024taxBILLS98kpersonal+18krealnotcashcollections/current2026taxes. Eminentdomainappealsongoingnotfinallegalityfinding;healthsymptomsresidentreportsnotcausation;partialimmersionconversionnotalltenantfanseliminated. Sourcecommentsnotadopted.",
            "Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."
          ],
          "sources": [
            {
              "url": "https://flatwaterfreepress.org/a-nebraska-crypto-company-wants-to-get-bigger-landowners-decry-nppds-use-of-eminent-domain-that-will-help-it-grow/",
              "host": "flatwaterfreepress.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 73",
          "scope": "Selected original August 2023 public utility minutes explicitly describe the Jigowatt proposed cloud computing project and adopt routing and public involvement authority for a transmission line. The meeting resumed August 10 and the resolution vote belongs to that day. This is transmission planning authority, not an accomplished computing facility approval, installed line, delivered energy or present mining service. The November 2025 service target is a forecast rather than an actual completion date. The remaining minute business was not fully reviewed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_utility_routing_action_current_computing_stage_held",
              "scope": "Selected original August 2023 public utility minutes explicitly describe the Jigowatt proposed cloud computing project and adopt routing and public involvement authority for a transmission line. The meeting resumed August 10 and the resolution vote belongs to that day. This is transmission planning authority, not an accomplished computing facility approval, installed line, delivered energy or present mining service. The November 2025 service target is a forecast rather than an actual completion date. The remaining minute business was not fully reviewed."
            },
            "source_read_scope": {
              "original_eighteen_page_minutes_selected_physical_pages1_2_3_11_12_13_14_15_read": true,
              "aug10_reconvened_session_and_resolution_vote_read": true,
              "november2025_forecast_not_completed_service": true,
              "no_transmission_power_or_capacity_fields_changed": true
            }
          },
          "notes": [
            "Selected original August 2023 public utility minutes explicitly describe the Jigowatt proposed cloud computing project and adopt routing and public involvement authority for a transmission line. The meeting resumed August 10 and the resolution vote belongs to that day. This is transmission planning authority, not an accomplished computing facility approval, installed line, delivered energy or present mining service. The November 2025 service target is a forecast rather than an actual completion date. The remaining minute business was not fully reviewed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://docs.nppd.com/Board/2023/2023AugustMinutes.pdf",
              "host": "docs.nppd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Stanton · Stanton · Source context reviewed",
      "event_evidence": [
        {
          "date": "2023-08-10",
          "text": "The original NPPD minutes record August 10, 2023 adoption of resolution 23 40 authorizing preliminary transmission routing and public involvement for the proposed Jigowatt computing load. This is a utility planning action rather than completed transmission, computing construction or the forecast November 2025 service date.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://docs.nppd.com/Board/2023/2023AugustMinutes.pdf",
              "host": "docs.nppd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "31167"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
