{
  "schema_version": 1,
  "source_compilation_context": {
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "32023",
    "label": "Nye County, Nevada"
  },
  "records": [
    {
      "id": "manse-technology-campus-pahrump-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Manse Technology Campus",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Nye"
      ],
      "city": "Pahrump",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manse developer fullbuildout and postabatement tax forecast. Developerfinancial/engineeringprojectionsnotactualexpenditure,taxes,jobsorwaterwithdrawals.91.8+22.4=114.2Mroundstoheadline114M,not228M. Claimedpostabatementnettaxnotindependentapprovedabatementreview. Landscapingwaiverconditional. No numericITMW,exactparcelorservice date. Petition/feedbacknotused. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. The proposal is not proof of final county approval, construction or operation. No projected economic or technical total was adopted. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://mansetechcampus.com/",
          "host": "mansetechcampus.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.04196,
        "lng": -116.4718,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Manse developer fullbuildout and postabatement tax forecast",
          "fields": {
            "project": "Manse Technology Campus",
            "locality": "Manse Road corridor, Pahrump, Nye County, Nevada",
            "developer_described_stage": "proposed, county approval future",
            "planned_fullbuildout_capital_usd": 18400000000,
            "estimated_annual_property_tax_usd_approx": 114000000,
            "estimated_real_property_tax_component_usd": 91800000,
            "estimated_personal_property_tax_component_usd": 22400000,
            "estimated_onetime_impact_fees_usd": 12700000,
            "expected_peak_construction_jobs": 1600,
            "expected_permanent_jobs": 380,
            "projected_annual_water_acre_feet_max_exclusive": 300
          },
          "notes": [
            "Developerfinancial/engineeringprojectionsnotactualexpenditure,taxes,jobsorwaterwithdrawals.91.8+22.4=114.2Mroundstoheadline114M,not228M. Claimedpostabatementnettaxnotindependentapprovedabatementreview. Landscapingwaiverconditional. No numericITMW,exactparcelorservice date. Petition/feedbacknotused.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://mansetechcampus.com/",
              "host": "mansetechcampus.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Named-site current agency/operator stage, reviewed October 15, 2026",
          "fields": {
            "current_status": "proposed",
            "status_basis": "The project website describes Manse as a proposed development in Pahrump, Nye County."
          },
          "notes": [
            "The proposal is not proof of final county approval, construction or operation. No projected economic or technical total was adopted. Publication date of this current page is not established; the review date is not an event date."
          ],
          "sources": [
            {
              "url": "https://mansetechcampus.com/",
              "host": "mansetechcampus.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "e6843ae58ede55a37ca30bc89e78aed5c9a48ce472cdd5f9a2cf07f4331ed88d",
          "events": [],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pahrump · Nye · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32023"
      }
    },
    {
      "id": "sarcobatus-solar-scottys-junction-nye-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Sarcobatus Solar Project (off-grid bitcoin mining)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Nye"
      ],
      "city": "Scotty's Junction",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This Tesla Solar LLC is explicitly described as unaffiliated with Elon Musk; do not assign Tesla Inc. as owner. Reported plan covers 800 acres of private land with distributed bitcoin servers, solar and batteries, not a public-land award or verified operating AI campus. Preliminary-plan approval is not final permit or energization. No MW or guaranteed overnight energy is verified. Developer says not grid tied and construction dust-control water trucked in; these are attributed design statements, not independently certified continuous zero-water/renewable operation. No direct original minutes reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://basinandrangewatch.substack.com/p/new-threat-to-the-desert-unlocked",
          "host": "basinandrangewatch.substack.com",
          "date": "2026-01-22",
          "published": "2026-01-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.nyecountynv.gov/DocumentCenter/View/51153/Item19",
          "host": "www.nyecountynv.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.14989,
        "lng": -116.58961,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Basin & Range Watch’s first-person advocacy report says Nye County approved a preliminary Sarcobatus Solar development plan at its January 21 meeting after discussion with Tesla Solar LLC.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "This Tesla Solar LLC is explicitly described as unaffiliated with Elon Musk; do not assign Tesla Inc. as owner. Reported plan covers 800 acres of private land with distributed bitcoin servers, solar and batteries, not a public-land award or verified operating AI campus. Preliminary-plan approval is not final permit or energization. No MW or guaranteed overnight energy is verified. Developer says not grid tied and construction dust-control water trucked in; these are attributed design statements, not independently certified continuous zero-water/renewable operation. No direct original minutes reviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://basinandrangewatch.substack.com/p/new-threat-to-the-desert-unlocked",
              "host": "basinandrangewatch.substack.com",
              "date": "2026-01-22",
              "published": "2026-01-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "Selected original County agenda and draft agreement pages describe Sarcobatus solar development and a request to schedule a hearing on a proposed development agreement. Adoption blanks and a proposed July 27, 2026 effective clause do not independently establish execution or legal commencement. The selected pages do not independently identify the exact distributed computing deployment, and solar approval does not establish computing construction or service. No draft hearing recommendation becomes an accomplished event or a future calendar entry.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_solar_draft_agreement_exact_distributed_compute_stage_held",
              "scope": "Selected original County agenda and draft agreement pages describe Sarcobatus solar development and a request to schedule a hearing on a proposed development agreement. Adoption blanks and a proposed July 27, 2026 effective clause do not independently establish execution or legal commencement. The selected pages do not independently identify the exact distributed computing deployment, and solar approval does not establish computing construction or service. No draft hearing recommendation becomes an accomplished event or a future calendar entry."
            },
            "source_read_scope": {
              "original_packet_physical_pages": [
                1,
                2,
                3,
                7,
                8,
                9,
                11,
                19,
                38,
                39
              ],
              "complete64_page_packet_review_not_claimed": true,
              "blank_adoption_fields_retained": true,
              "draft_effective_day_not_legal_commencement": true,
              "solar_project_not_commissioned_computing": true
            }
          },
          "notes": [
            "Selected original County agenda and draft agreement pages describe Sarcobatus solar development and a request to schedule a hearing on a proposed development agreement. Adoption blanks and a proposed July 27, 2026 effective clause do not independently establish execution or legal commencement. The selected pages do not independently identify the exact distributed computing deployment, and solar approval does not establish computing construction or service. No draft hearing recommendation becomes an accomplished event or a future calendar entry.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.nyecountynv.gov/DocumentCenter/View/51153/Item19",
              "host": "www.nyecountynv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Scotty's Junction · Nye · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32023"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
