  "schema_version": 1,
  "source_compilation_context": {
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "32029",
    "label": "Storey County, Nevada"
  },
  "records": [
    {
      "id": "amazon-data-services-reno-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Amazon Data Services Reno Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "Sparks",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nevada Amazon proposed air-construction permit. Proposed action notice, not issued permit or observed operating proof. Sparks postal address not proof project is withinReno orSparks municipality.358engines not358facilities or MWload. Draft permits can condition use of diesel/renewable diesel; not carbon-free operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ndep.nv.gov/uploads/documents/ap7374-4768-proposed-action.pdf",
          "host": "ndep.nv.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.44687,
        "lng": -119.52913,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Nevada Amazon proposed air-construction permit",
          "fields": {
            "air_permit_applicant": "AmazonDataServicesInc",
            "air_permit_id": "AP7374-4768",
            "air_facility_id": "A2648",
            "published_applicant_address": "3800 PeruDrive,Sparks,NV89437",
            "published_site_region": "TahoeRenoIndustrialCenter,approximately15miles eastofReno",
            "proposed_standby_diesel_generators": 358,
            "historical_comment_deadline": "2026-03-02"
          },
          "notes": [
            "Proposed action notice, not issued permit or observed operating proof. Sparks postal address not proof project is withinReno orSparks municipality.358engines not358facilities or MWload. Draft permits can condition use of diesel/renewable diesel; not carbon-free operations.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ndep.nv.gov/uploads/documents/ap7374-4768-proposed-action.pdf",
              "host": "ndep.nv.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sparks · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "colovore-reno-1-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Colovore Reno 1 (RN01)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. draft Colovore air-permit equipment/site identity. Firstpage visually markedDRAFT despite templateIssuedTo/ClassIIOperatingPermit title. Not an issued final operatingpermit. Generatorratings notcriticalIT. Equipmentmanufacture2024notopeningdate. No actualsiteoperation or currentconsumption established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ndep.nv.gov/uploads/documents/ap7374-5002-class-ii-aqop.pdf",
          "host": "ndep.nv.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.colovore.com/data-center",
          "host": "www.colovore.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.colovore.com/markets/reno",
          "host": "www.colovore.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.45964,
        "lng": -119.54306,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "draft Colovore air-permit equipment/site identity",
          "fields": {
            "air_permit_id": "AP7374-5002",
            "air_facility_id": "A2675",
            "published_permittee": "ColovoreReno1LLC",
            "published_physical_address": "100 ItalyDrive,McCarran,NV89434",
            "published_county": "Storey,Nevada",
            "listed_emergency_generators": 5,
            "generator_rating_kw_each": 3490,
            "document_status": "DRAFT watermark"
          },
          "notes": [
            "Firstpage visually markedDRAFT despite templateIssuedTo/ClassIIOperatingPermit title. Not an issued final operatingpermit. Generatorratings notcriticalIT. Equipmentmanufacture2024notopeningdate. No actualsiteoperation or currentconsumption established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ndep.nv.gov/uploads/documents/ap7374-5002-class-ii-aqop.pdf",
              "host": "ndep.nv.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The original NDEP permit identifies Colovore Reno 1 at 100 Italy Drive in McCarran. The current provider roster describes RNO01 Sparks and RNO02 Reno as under construction, while its Reno market page describes RNO01 halls as sold out and RNO02 as preleasing. This pass does not independently crosswalk the Sparks marketing component to the inherited McCarran permit premises. Sold capacity, preleasing and an air quality operating permit do not establish commissioned computing. Neither a private opening account nor a marketing city name is substituted for exact current service evidence.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "ndep_named_premise_and_provider_code_crosswalk_held",
              "scope": "The original NDEP permit identifies Colovore Reno 1 at 100 Italy Drive in McCarran. The current provider roster describes RNO01 Sparks and RNO02 Reno as under construction, while its Reno market page describes RNO01 halls as sold out and RNO02 as preleasing. This pass does not independently crosswalk the Sparks marketing component to the inherited McCarran permit premises. Sold capacity, preleasing and an air quality operating permit do not establish commissioned computing. Neither a private opening account nor a marketing city name is substituted for exact current service evidence."
            },
            "source_read_scope": {
              "original_permit_physical_pages": [
                1,
                2,
                3
              ],
              "remaining_permit_pages_not_claimed_read": true,
              "complete_current_roster_and_market_text_read": true,
              "sold_out_not_commissioned": true,
              "no_city_or_component_merge": true
            }
          },
          "notes": [
            "The original NDEP permit identifies Colovore Reno 1 at 100 Italy Drive in McCarran. The current provider roster describes RNO01 Sparks and RNO02 Reno as under construction, while its Reno market page describes RNO01 halls as sold out and RNO02 as preleasing. This pass does not independently crosswalk the Sparks marketing component to the inherited McCarran permit premises. Sold capacity, preleasing and an air quality operating permit do not establish commissioned computing. Neither a private opening account nor a marketing city name is substituted for exact current service evidence.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://ndep.nv.gov/uploads/documents/ap7374-5002-class-ii-aqop.pdf",
              "host": "ndep.nv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.colovore.com/data-center",
              "host": "www.colovore.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.colovore.com/markets/reno",
              "host": "www.colovore.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "edgecore-reno-campus-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "EdgeCore Reno Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Hyperscale data center campus",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "EdgeCore Digital Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Upon-completion three-building campus forecast. Contracted near-term power has no reviewed quantity, allocation or energization day. Technical as-of date is not published. No utility, backup-generation or metered-use figure is inferred.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Developer-described cooling design; no measured facility water volume is established.",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nevada draft air-permit identity andstatus. WatermarkvisuallyDRAFTdespiteIssuedTotemplate. Notfinaloperatingpermit. Enginehorsepower andemergencygeneration notcriticalIT. Manufacturingafter2024notcampusopening. ExactEdgeCoreoperatorlegalentitycrosswalknotindependentlyprovenhere. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-11-18",
          "Scheduled event: Storey County notice lists an EdgeCore topping-off and ribbon-cutting function at 3615 USA Parkway, McCarran, on November 18, 2026. This is a future ceremony, not proof of opening, commissioning or full-campus delivery. The county index links two PDFs under swapped labels; the cited document contains the actual EdgeCore notice."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ndep.nv.gov/uploads/documents/ap7374-4772_AC12456-class-ii-aqop.pdf",
          "host": "ndep.nv.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://edgecore.com/locations/reno-data-center",
          "host": "edgecore.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed operator campus page"
        },
        {
          "url": "https://www.storeycounty.org/agendacenter",
          "host": "www.storeycounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "storey agendas"
        },
        {
          "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11122026-1414",
          "host": "www.storeycounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "storey nnda 20261112 notice"
        },
        {
          "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11182026-1415",
          "host": "www.storeycounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "storey reno 20261118 notice"
        },
        {
          "url": "https://storeycounty.org/AgendaCenter/ViewFile/Agenda/_09182025-1330",
          "host": "storeycounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "storey reno 20250918 notice"
        },
        {
          "url": "https://edgecore.com/resources/thought-leadership/reno-the-ai-booms-emerging-western-hub",
          "host": "edgecore.com",
          "published": "2024-07-18",
          "date": "2024-07-18",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-enters-2026-with-1-8gw-of-data-center-capacity-delivered-or-under-development",
          "host": "edgecore.com",
          "published": "2026-01-13",
          "date": "2026-01-13",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.42024,
        "lng": -119.52679,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Nevada draft air-permit identity andstatus",
          "fields": {
            "air_permit_id": "AP7374-4772",
            "air_facility_id": "A2652",
            "published_permittee": "MECP1Reno1LLC",
            "published_physical_address": "3000 USAParkway,McCarran,NV89437",
            "published_county": "Storey,Nevada",
            "document_status": "DRAFTwatermark"
          },
          "notes": [
            "WatermarkvisuallyDRAFTdespiteIssuedTotemplate. Notfinaloperatingpermit. Enginehorsepower andemergencygeneration notcriticalIT. Manufacturingafter2024notcampusopening. ExactEdgeCoreoperatorlegalentitycrosswalknotindependentlyprovenhere.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ndep.nv.gov/uploads/documents/ap7374-4772_AC12456-class-ii-aqop.pdf",
              "host": "ndep.nv.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "edgecore-depth-2026-10-16",
          "scope": "Selected operator campus/phase and technical-envelope review; no whole-state refresh, exact location, legal ownership or physical-site count certification.",
          "fields": {
            "market_identity": "Current operator places its metro Reno campus in the Tahoe-Reno Industrial Center and Storey County; the existing McCarran/Storey record is retained without redefining Reno as legal city jurisdiction.",
            "campus_envelope": {
              "critical_it_mw": 216,
              "building_count_claim": 3,
              "gross_square_feet_claim": "nearly 1 million",
              "acres_claim": 56
            },
            "current_phase_scope": "The current page puts 216 MW and three buildings at completion and advertises contracted near-term power. Neither language establishes which building is currently operating or energized. Current data-center status remains unclear; no closure is inferred.",
            "water_scope": "Below .01 L/kWh is described as an industry-benchmark WUE rating. This is not a measured site water-volume series or a verified annual period.",
            "identity_review_scope": "Existing named campus matched by brand and published locality/context only. No precise address, title, physical-site census or point correction is adopted."
          },
          "notes": [
            "Campus figures overlap with their components and older plans. Do not sum them or call them available, energized, approved or metered power.",
            "Published/review dates and forecasts are not accomplished construction or opening dates. Existing coordinates and location precision remain unverified and unchanged."
          ],
          "sources": [
            {
              "url": "https://edgecore.com/locations/reno-data-center",
              "host": "edgecore.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed operator campus page"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "EdgeCore Ashburn permit/identity and Reno schedule follow-up",
          "scope": "A county notice schedules a November 18, 2026 topping-off/ribbon-cutting function. This is not an accomplished opening, commissioning, current operating phase or delivery of the complete campus.",
          "fields": {
            "scheduled_ceremony": {
              "scheduled_on": "2026-11-18",
              "time_literal": "9:30 AM to 2:00 PM",
              "venue_literal": "3615 USA Parkway, McCarran, NV",
              "scope": "Scheduled county-notice function only, not occurred or commissioned."
            },
            "notice_link_mismatch": {
              "index_edgecore_href": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11182026-1415",
              "actual_edgecore_pdf_href": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11122026-1414",
              "actual_edgecore_pdf_sha256": "7f5703c6c1ba596f27184e70e96fd3981a263ddfb16364c2498740bd82f1cf7d",
              "wrong_pdf_contents": "NNDA Business Edge luncheon, November 12, 2026, Atlantis Casino, 3800 South Virginia Street, Reno.",
              "scope": "Actual PDF content controls the document identity; preserve wrong index label/filename as a source conflict."
            },
            "posting_date_scope": {
              "agenda_posted": "2026-10-15 10:42 AM, displayed county-site time",
              "signed_certification": "On or before October 15, 2026",
              "scope": "Index posting, on-or-before certification, metadata and future function date are distinct."
            },
            "historical_scheduled_function": {
              "scheduled_on": "2025-09-18",
              "venue_literal": "3000 USA Parkway, McCarran, NV 89434",
              "scope": "Historical scheduled topping-off function, not proof it happened, a street renumbering, legal boundary or same-address identity."
            },
            "location_and_stage_hold": "Existing approximate point, blank core address, unknown current stage, 216 MW campus forecast and all technical facts stay unchanged. The county notice does not certify any commissioned building or assign this event to RN01."
          },
          "notes": [
            "The agenda link labels and actual PDF contents are swapped. The actual EdgeCore notice is reached by the neighboring NNDA-labeled link. Full image-only pages were rendered and visually read. The 2025 notice used a different venue number. Neither venue is promoted to an operator postal address or map point; no parcel or building code is certified. Current operation remains unresolved."
          ],
          "sources": [
            {
              "url": "https://www.storeycounty.org/agendacenter",
              "host": "www.storeycounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "storey agendas"
            },
            {
              "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11122026-1414",
              "host": "www.storeycounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "storey nnda 20261112 notice"
            },
            {
              "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11182026-1415",
              "host": "www.storeycounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "storey reno 20261118 notice"
            },
            {
              "url": "https://storeycounty.org/AgendaCenter/ViewFile/Agenda/_09182025-1330",
              "host": "storeycounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "storey reno 20250918 notice"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Reno developer-role and cooling-design review October 16",
          "scope": "Developer brand and prospective cooling-design context only. No current construction/operation, physical location, legal ownership, new power quantity or measured water volume is established.",
          "fields": {
            "provider_roles": [
              {
                "name": "EdgeCore Digital Infrastructure",
                "role": "developer"
              }
            ],
            "cooling_design_scope": "The developer describes an air-cooled design with a closed-loop chilled-water system. Flexible direct-to-chip server-cooling capability is a different design layer, not proof of a commissioned building or current water volume.",
            "design_rating_scope": "The below 0.01 L/kWh WUE claim is a design/industry benchmark statement. It is not a metered withdrawal/consumption series, annual period or evidence of zero water use."
          },
          "notes": [
            "Developer is a source-scoped brand role, not title, tenant or current operating-stage certification.",
            "The existing 216 MW completion forecast, inherited approximate point and future November 18, 2026 ceremony retain their earlier sources and limits."
          ],
          "sources": [
            {
              "url": "https://edgecore.com/locations/reno-data-center",
              "host": "edgecore.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed operator campus page"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 2",
          "scope": "EdgeCore reported Reno construction in its July 18, 2024 article. Its current location page retains upon completion and contracted near term power wording. This is not evidence that the future November 18, 2026 ceremony occurred or that all buildings are operational. The historical construction report is retained without certifying the present physical stage.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "EdgeCore reported Reno construction in its July 18, 2024 article. Its current location page retains upon completion and contracted near term power wording. This is not evidence that the future November 18, 2026 ceremony occurred or that all buildings are operational. The historical construction report is retained without certifying the present physical stage."
            }
          },
          "notes": [
            "EdgeCore reported Reno construction in its July 18, 2024 article. Its current location page retains upon completion and contracted near term power wording. This is not evidence that the future November 18, 2026 ceremony occurred or that all buildings are operational. The historical construction report is retained without certifying the present physical stage."
          ],
          "sources": [
            {
              "url": "https://edgecore.com/resources/thought-leadership/reno-the-ai-booms-emerging-western-hub",
              "host": "edgecore.com",
              "published": "2024-07-18",
              "date": "2024-07-18",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://edgecore.com/locations/reno-data-center",
              "host": "edgecore.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 20, October 23, 2026",
          "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The Reno page explicitly places the planned campus in Storey County and uses upon completion wording. Developer is supported, with no operation, permit, delivery or current full load inference. Market name Reno does not change the retained McCarran jurisdiction.",
          "fields": {
            "company_association": {
              "name": "EdgeCore Digital Infrastructure",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The Reno page explicitly places the planned campus in Storey County and uses upon completion wording. Developer is supported, with no operation, permit, delivery or current full load inference. Market name Reno does not change the retained McCarran jurisdiction."
            },
            "provider_role": "developer"
          },
          "notes": [
            "EdgeCore Digital Infrastructure explicitly describes this named campus or component on its own website. The attributed provider brand relationship is not a finding of the legal operator or owner, independent safety verification, surveyed title or completed construction. No status, location, address, physical milestone, quantity, water use, air permit, measured harm, incentive or tenant identity is promoted. The Reno page explicitly places the planned campus in Storey County and uses upon completion wording. Developer is supported, with no operation, permit, delivery or current full load inference. Market name Reno does not change the retained McCarran jurisdiction.",
            "First publication dates are not established. Current retrieval and advertised build out are not physical milestones."
          ],
          "sources": [
            {
              "url": "https://edgecore.com/locations/reno-data-center",
              "host": "edgecore.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party explicitly named campus, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research followup 1",
          "scope": "The complete original January 13, 2026 portfolio account combines capacity delivered and under development across several markets and separately lists Reno among active markets. It reports companywide construction targets and workforce metrics without a named Reno building commissioning or current physical phase. Mixed portfolio totals, active market language, financing and fulfilled companywide targets do not independently resolve the inherited exact Reno campus stage. No precise current completion, operation, installed quantity or municipality crosswalk is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_edgecore_2026_mixed_portfolio_exact_reno_stage_held",
              "scope": "The complete original January 13, 2026 portfolio account combines capacity delivered and under development across several markets and separately lists Reno among active markets. It reports companywide construction targets and workforce metrics without a named Reno building commissioning or current physical phase. Mixed portfolio totals, active market language, financing and fulfilled companywide targets do not independently resolve the inherited exact Reno campus stage. No precise current completion, operation, installed quantity or municipality crosswalk is inferred."
            },
            "source_read_scope": {
              "complete_original_jan13_portfolio_release_body_read": true,
              "mixed_delivered_and_development_total_not_site_operation": true,
              "companywide_targets_not_exact_reno_commissioning": true
            }
          },
          "notes": [
            "The complete original January 13, 2026 portfolio account combines capacity delivered and under development across several markets and separately lists Reno among active markets. It reports companywide construction targets and workforce metrics without a named Reno building commissioning or current physical phase. Mixed portfolio totals, active market language, financing and fulfilled companywide targets do not independently resolve the inherited exact Reno campus stage. No precise current completion, operation, installed quantity or municipality crosswalk is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-enters-2026-with-1-8gw-of-data-center-capacity-delivered-or-under-development",
              "host": "edgecore.com",
              "published": "2026-01-13",
              "date": "2026-01-13",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 216,
          "unit": "MW",
          "as_of": null,
          "basis": "forecast",
          "scope": "Upon-completion three-building campus forecast. Contracted near-term power has no reviewed quantity, allocation or energization day.",
          "observed_on": "2026-10-16",
          "as_of_basis": "not_published",
          "sources": [
            "https://edgecore.com/locations/reno-data-center"
          ]
        }
      ],
      "event_evidence": [
        {
          "date": "2026-11-18",
          "text": "Scheduled event: Storey County notice lists an EdgeCore topping-off and ribbon-cutting function at 3615 USA Parkway, McCarran, on November 18, 2026. This is a future ceremony, not proof of opening, commissioning or full-campus delivery. The county index links two PDFs under swapped labels; the cited document contains the actual EdgeCore notice.",
          "kind": "scheduled_event",
          "sources": [
            {
              "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11122026-1414",
              "host": "www.storeycounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "storey nnda 20261112 notice"
            }
          ]
        }
      ],
      "typed_water_facts": [
        {
          "measure": "cooling_type",
          "value": "Developer-described air-cooled design with a closed-loop chilled-water system.",
          "unit": null,
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-16",
          "basis": "operator_reported_statement",
          "scope": "Undated developer design statement. Not a commissioned mechanical inspection, measured water volume, zero-use claim or annual WUE series. Flexible server liquid-cooling capability is separate from heat-rejection design.",
          "sources": [
            "https://edgecore.com/locations/reno-data-center"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "fleet-data-centers-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Two 200 MW campuses are not 400 MW each. Initial power delivery, ultimate IT and temporary generation differ. Construction and all-in investment scenarios are not additive. Tenant identity cannot be inferred from market capitalization. Forecast 2027 openings are not current operation. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nnbw.com/news/2026/jun/02/fleet-data-centers-breaks-ground-on-2-facilities/",
          "host": "nnbw.com",
          "date": "2026-06-02",
          "published": "2026-06-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_02182025-1269",
          "host": "www.storeycounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.47285,
        "lng": -119.50921,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "NNBW reports Fleet South Valley and Peru Ridge groundbreakings and a combined 400 MW of critical computing capacity.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Two 200 MW campuses are not 400 MW each. Initial power delivery, ultimate IT and temporary generation differ. Construction and all-in investment scenarios are not additive. Tenant identity cannot be inferred from market capitalization. Forecast 2027 openings are not current operation.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nnbw.com/news/2026/jun/02/fleet-data-centers-breaks-ground-on-2-facilities/",
              "host": "nnbw.com",
              "date": "2026-06-02",
              "published": "2026-06-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "Selected original Storey County packet pages describe the NVPRU applicants proposed data center campus at 2300 Peru Drive and a height request. The staff report records a February 6, 2025 Planning Commission recommendation and a proposed Board motion, rather than an independently read final Board vote. This pass does not establish the exact crosswalk between those older parcels and all components of the inherited combined Fleet South Valley and Peru Ridge record. Private groundbreaking accounts and proposed private generation do not independently establish current exact computing construction or service. No applicant or ownership role is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_peru_proposal_and_height_review_combined_fleet_crosswalk_held",
              "scope": "Selected original Storey County packet pages describe the NVPRU applicants proposed data center campus at 2300 Peru Drive and a height request. The staff report records a February 6, 2025 Planning Commission recommendation and a proposed Board motion, rather than an independently read final Board vote. This pass does not establish the exact crosswalk between those older parcels and all components of the inherited combined Fleet South Valley and Peru Ridge record. Private groundbreaking accounts and proposed private generation do not independently establish current exact computing construction or service. No applicant or ownership role is changed."
            },
            "source_read_scope": {
              "original_agenda_and_staff_report_physical_pages": [
                4,
                86,
                88,
                89,
                90,
                91,
                92,
                93
              ],
              "complete173_page_packet_review_not_claimed": true,
              "recommended_motion_not_adopted_vote": true,
              "combined_campus_components_not_merged": true,
              "no_capacity_or_roles_export": true
            }
          },
          "notes": [
            "Selected original Storey County packet pages describe the NVPRU applicants proposed data center campus at 2300 Peru Drive and a height request. The staff report records a February 6, 2025 Planning Commission recommendation and a proposed Board motion, rather than an independently read final Board vote. This pass does not establish the exact crosswalk between those older parcels and all components of the inherited combined Fleet South Valley and Peru Ridge record. Private groundbreaking accounts and proposed private generation do not independently establish current exact computing construction or service. No applicant or ownership role is changed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_02182025-1269",
              "host": "www.storeycounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "google-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Google  Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Calendar-year 2025 operator-reported location totals. Withdrawal, discharge and consumption are separate quantities; methodology permits estimates and does not establish today’s use.",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. 6B+state total not Storey-onlycapex. Built2021is year only, not exact opening date. Geothermal sourcing is not siteITcapacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. duplicate URL, no additional facility. Trailing-slash duplicate of StoreyCountyoperator page reviewed in same overlay. No second site, investment or milestone. Google 2026 quarterly performance table; named regional campus scope. Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/storey-county-nevada",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/locations/storey-county-nevada/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/efficiency/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/storey-county-nevada/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "host": "sustainability.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google 2026 Environmental Report"
        }
      ],
      "loc": {
        "lat": 39.44028,
        "lng": -119.56635,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "storey_built_year_operator_statement": 2021,
            "regional_investment_usd_min_exclusive": 6000000000,
            "investment_scope": "Nevada statewide including Henderson and Storey",
            "geothermal_use_start_year": 2023
          },
          "notes": [
            "6B+state total not Storey-onlycapex. Built2021is year only, not exact opening date. Geothermal sourcing is not siteITcapacity.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/storey-county-nevada",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "duplicate URL, no additional facility",
          "fields": {},
          "notes": [
            "Trailing-slash duplicate of StoreyCountyoperator page reviewed in same overlay. No second site, investment or milestone.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/storey-county-nevada/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Google 2026 quarterly performance table; named regional campus scope",
          "fields": {
            "operator_reported_pue_period": "2026-Q2",
            "operator_reported_campus_pue": [
              {
                "source_campus_label": "Storey County, Nevada",
                "quarterly_pue": 1.17,
                "trailing_twelve_month_pue": 1.15
              }
            ]
          },
          "notes": [
            "Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/efficiency/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://datacenters.google/locations/storey-county-nevada/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "398f42d55ca9e2ebecd3b24e2dede307ad2d9d3b653469d1efebd135488f9c17",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Storey County, Nevada is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "annual_water_reporting": {
              "source_location": "Storey County, NV",
              "report_year": 2026,
              "reporting_year": 2025,
              "source_page": 97,
              "unit": "Million gallons",
              "withdrawal": 66.7,
              "discharge": 60.0,
              "consumption": 6.7
            },
            "water_method_scope": "Annual calendar-year 2025 figures for the reported location, not instantaneous use, a daily rate, an approved limit or one building. Google uses metered or invoiced values when available and can estimate missing data; the table does not identify each row’s metering completeness. Consumption is calculated as withdrawal minus discharge; values are rounded. Seawater and brackish water over 1,000 mg/L total dissolved solids are excluded. Unless otherwise specified, withdrawals are potable; Douglas County includes reclaimed wastewater. No litres or daily averages are calculated.",
            "water_location_association": "Storey County, NV is associated with this regional campus research context only; no allocation to separate expansion/street-address records or individual buildings.",
            "current_status_basis": "An operating component is supported at Google’s named Storey County, Nevada location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
            "reported_cooling_footnote": "Report endnote233 cross-references air-cooled facility. Its annual withdrawal and consumption remain nonzero; no zero-water claim."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/storey-county-nevada/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
              "host": "sustainability.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google 2026 Environmental Report"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check57, October24,2026",
          "scope": "Google identifies the named Storey County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Storey County page distinguishes the2021built campus from the2019Henderson site. Geothermal and water project statements remain source claims, not a verified utility mix, water measurement or outcome.",
          "fields": {
            "company_association": {
              "name": "Google",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Google identifies the named Storey County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Storey County page distinguishes the2021built campus from the2019Henderson site. Geothermal and water project statements remain source claims, not a verified utility mix, water measurement or outcome."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Google identifies the named Storey County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Storey County page distinguishes the2021built campus from the2019Henderson site. Geothermal and water project statements remain source claims, not a verified utility mix, water measurement or outcome."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/storey-county-nevada/",
              "host": "datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Storey · Source context reviewed",
      "status_scope": "An operating component is supported at Google’s named Storey County, Nevada location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
      "typed_water_facts": [
        {
          "measure": "withdrawal",
          "value": 66.7,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Storey County, NV, calendar year 2025 withdrawal; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Endnote233 refers to air-cooled facility; air cooling does not mean zero site water use.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "discharge",
          "value": 60.0,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Storey County, NV, calendar year 2025 discharge; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Endnote233 refers to air-cooled facility; air cooling does not mean zero site water use.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "consumption",
          "value": 6.7,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Storey County, NV, calendar year 2025 consumption; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Endnote233 refers to air-cooled facility; air cooling does not mean zero site water use.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "novva-tahoe-reno-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Novva Tahoe Reno Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Launchcompletedfacility supported.60MWsumofdatahalls distinct100MWsubstation; no160MWtotal. Newcapacity2026targetnotproofallhallsfullyoccupiedorenergized. January13,2026modifiedheadernotlaunch. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.novva.com/media-center/launch-of-tahoe-reno-data-center/",
          "host": "novva.com",
          "date": "2025-07-08",
          "published": "2025-07-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.novva.com/data-center-facilities/tahoe-reno-nevada/",
          "host": "www.novva.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 39.42419,
        "lng": -119.49347,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "launch_announcement_date": "2025-07-08",
            "campus_acres": 20,
            "area_sqft": 300000,
            "data_halls": 6,
            "data_hall_capacity_mw_each": 10,
            "data_hall_area_sqft_approx_each": 30000,
            "onsite_substation_mw": 100,
            "new_capacity_availability_target_year": 2026
          },
          "notes": [
            "Launchcompletedfacility supported.60MWsumofdatahalls distinct100MWsubstation; no160MWtotal. Newcapacity2026targetnotproofallhallsfullyoccupiedorenergized. January13,2026modifiedheadernotlaunch.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.novva.com/media-center/launch-of-tahoe-reno-data-center/",
              "host": "novva.com",
              "date": "2025-07-08",
              "published": "2025-07-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Novva offers current colocation, network and deployment services at its named Tahoe Reno facility. Its substation and hall power measures are not added or treated as energized IT capacity. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "Novva offers current colocation, network and deployment services at its named Tahoe Reno facility. Its substation and hall power measures are not added or treated as energized IT capacity. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Novva offers current colocation, network and deployment services at its named Tahoe Reno facility. Its substation and hall power measures are not added or treated as energized IT capacity."
          ],
          "sources": [
            {
              "url": "https://www.novva.com/data-center-facilities/tahoe-reno-nevada/",
              "host": "www.novva.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "status_scope": "Novva offers current colocation, network and deployment services at its named Tahoe Reno facility. Its substation and hall power measures are not added or treated as energized IT capacity. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "powerhouse-reno-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "PowerHouse Reno Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. PowerHouse Reno republished historical development report. UndatedoperatorrepublicationattributesgroundbreakingtoRenoGazetteJournalandthisMonday;noexactceremonydayinferred. Q32025targetunobserved,notcurrentopenstatus.30DC/2.3GWcompanypipelineotherprojectsnotReno. No executedleaseoractualcapexinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-01-19",
          "PowerHouse announced a site acquisition for its Reno development. This is the release date and does not establish the exact closing, construction start or opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center",
          "host": "powerhousedata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno",
          "host": "www.powerhousedata.com",
          "published": "2024-01-19",
          "date": "2024-01-19",
          "checked": "2026-10-22",
          "label": "Reviewed company identity source"
        },
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-reno",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed company identity source"
        },
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno-2",
          "host": "www.powerhousedata.com",
          "published": "2024-01-19",
          "date": "2024-01-19",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.49158,
        "lng": -119.54115,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "PowerHouse Reno republished historical development report",
          "fields": {
            "developer_publication": "PowerHouse",
            "project": "Reno campus",
            "location": "Tahoe Reno Industrial Center, Storey County, Nevada",
            "planned_campus_capacity_mw": 65,
            "power_basis": "campus capacity, not explicit IT",
            "site_acres": 49,
            "planned_buildings": 3,
            "each_building_stories": 2,
            "total_planned_building_sqft": 900000,
            "first_building_historical_target": "2025-Q3",
            "campus_completion_target_year": 2028
          },
          "notes": [
            "UndatedoperatorrepublicationattributesgroundbreakingtoRenoGazetteJournalandthisMonday;noexactceremonydayinferred. Q32025targetunobserved,notcurrentopenstatus.30DC/2.3GWcompanypipelineotherprojectsnotReno. No executedleaseoractualcapexinreviewedbody.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-breaks-ground-on-reno-data-center",
              "host": "powerhousedata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno",
              "host": "www.powerhousedata.com",
              "published": "2024-01-19",
              "date": "2024-01-19",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            },
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-reno",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "PowerHouse lists Reno with delivery in April 2026 and a historical construction schedule. An expired target does not establish completion. The dated January 19, 2024 release describes the site acquisition announcement. The undated groundbreaking republication and current page do not establish present operating service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "PowerHouse lists Reno with delivery in April 2026 and a historical construction schedule. An expired target does not establish completion. The dated January 19, 2024 release describes the site acquisition announcement. The undated groundbreaking republication and current page do not establish present operating service."
            }
          },
          "notes": [
            "PowerHouse lists Reno with delivery in April 2026 and a historical construction schedule. An expired target does not establish completion. The dated January 19, 2024 release describes the site acquisition announcement. The undated groundbreaking republication and current page do not establish present operating service."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno-2",
              "host": "www.powerhousedata.com",
              "published": "2024-01-19",
              "date": "2024-01-19",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-reno",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-01-19",
          "text": "PowerHouse announced a site acquisition for its Reno development. This is the release date and does not establish the exact closing, construction start or opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno-2",
              "host": "www.powerhousedata.com",
              "published": "2024-01-19",
              "date": "2024-01-19",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-citadel-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch CITADEL Campus",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only capture. HTTP200contains title only, no substantive captured campus specifications. This is not verification of claimed full-buildcapacity or currentoperation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/citadel/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/tahoe-reno/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 39.40249,
        "lng": -119.55218,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "title-only capture",
          "fields": {},
          "notes": [
            "HTTP200contains title only, no substantive captured campus specifications. This is not verification of claimed full-buildcapacity or currentoperation.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/citadel/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "Switch currently markets CITADEL campus colocation in Tahoe Reno, with future multi-gigawatt expansion described separately. The inherited approximate center and Storey display-outline discrepancy remain a location hold pending address and primary geography review; no point is moved to fit a polygon."
            }
          },
          "notes": [
            "Switch currently markets CITADEL campus colocation in Tahoe Reno, with future multi-gigawatt expansion described separately. The inherited approximate center and Storey display-outline discrepancy remain a location hold pending address and primary geography review; no point is moved to fit a polygon."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/tahoe-reno/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.switch.com/citadel/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. This is the campus record only. The source does not name Tahoe Reno 1, 2 or 3 and no role, service milestone or value is transferred to those separate records.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. This is the campus record only. The source does not name Tahoe Reno 1, 2 or 3 and no role, service milestone or value is transferred to those separate records."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. This is the campus record only. The source does not name Tahoe Reno 1, 2 or 3 and no role, service milestone or value is transferred to those separate records.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/tahoe-reno/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "status_scope": "Switch currently markets CITADEL campus colocation in Tahoe Reno, with future multi-gigawatt expansion described separately. The inherited approximate center and Storey display-outline discrepancy remain a location hold pending address and primary geography review; no point is moved to fit a polygon.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-tahoe-reno-1-the-citadel-campus-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Tahoe Reno 1 (The Citadel Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
          "host": "switch.com",
          "date": "2020-07-21",
          "published": "2020-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.46521,
        "lng": -119.47891,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "offsite/behind-meter generation portfolio, not IT capacity",
          "fields": {
            "project_type": "solar and battery development portfolio",
            "solar_power_mw_portfolio": 555,
            "battery_energy_mwh_portfolio": 800,
            "storey_solar_power_mw": 127,
            "storey_battery_energy_mwh": 240
          },
          "notes": [
            "Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "switch.com",
              "date": "2020-07-21",
              "published": "2020-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete original Switch article describes solar and battery development groundbreakings and refers broadly to the Tahoe Reno provider ecosystem. It does not independently establish current commissioned computing at the inherited Tahoe Reno 1 component. Solar construction, battery capacity and the older market description are not transferred to a specific data center building, and no exact article day or present computing stage is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_energy_groundbreaking_exact_compute_component_held",
              "scope": "The complete original Switch article describes solar and battery development groundbreakings and refers broadly to the Tahoe Reno provider ecosystem. It does not independently establish current commissioned computing at the inherited Tahoe Reno 1 component. Solar construction, battery capacity and the older market description are not transferred to a specific data center building, and no exact article day or present computing stage is inferred."
            },
            "source_read_scope": {
              "complete_original_energy_release_text_read": true,
              "energy_project_not_computing_building": true,
              "undated_article_not_exact_event": true,
              "capacity_roles_and_locations_unchanged": true
            }
          },
          "notes": [
            "The complete original Switch article describes solar and battery development groundbreakings and refers broadly to the Tahoe Reno provider ecosystem. It does not independently establish current commissioned computing at the inherited Tahoe Reno 1 component. Solar construction, battery capacity and the older market description are not transferred to a specific data center building, and no exact article day or present computing stage is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-tahoe-reno-2-the-citadel-campus-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Tahoe Reno 2 (The Citadel Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
          "host": "switch.com",
          "date": "2020-07-21",
          "published": "2020-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.4685,
        "lng": -119.58154,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "offsite/behind-meter generation portfolio, not IT capacity",
          "fields": {
            "project_type": "solar and battery development portfolio",
            "solar_power_mw_portfolio": 555,
            "battery_energy_mwh_portfolio": 800,
            "storey_solar_power_mw": 127,
            "storey_battery_energy_mwh": 240
          },
          "notes": [
            "Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "switch.com",
              "date": "2020-07-21",
              "published": "2020-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_energy_development_exact_tahoe_numbered_building_held",
              "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events."
            },
            "source_read_scope": {
              "complete_original_energy_release_text_read": true,
              "same_actual_raw_capture_reused": true,
              "energy_projects_not_numbered_compute_buildings": true,
              "no_exact_opening_or_capacity_export": true
            }
          },
          "notes": [
            "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "switch-tahoe-reno-3-the-citadel-campus-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Switch Tahoe Reno 3 (The Citadel Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. offsite/behind-meter generation portfolio, not IT capacity. Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
          "host": "switch.com",
          "date": "2020-07-21",
          "published": "2020-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.39274,
        "lng": -119.5038,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "offsite/behind-meter generation portfolio, not IT capacity",
          "fields": {
            "project_type": "solar and battery development portfolio",
            "solar_power_mw_portfolio": 555,
            "battery_energy_mwh_portfolio": 800,
            "storey_solar_power_mw": 127,
            "storey_battery_energy_mwh": 240
          },
          "notes": [
            "Allenergy-generation/storagecontext, not any TahoeReno data-centerbuildingIT.1.3Binvestment in energyportfolio not facilitycapex. MWhisenergy, notMWpower. PublicationmetadataJuly21,2020versus2024modified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "switch.com",
              "date": "2020-07-21",
              "published": "2020-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 68",
          "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_energy_development_exact_tahoe_numbered_building_held",
              "scope": "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events."
            },
            "source_read_scope": {
              "complete_original_energy_release_text_read": true,
              "same_actual_raw_capture_reused": true,
              "energy_projects_not_numbered_compute_buildings": true,
              "no_exact_opening_or_capacity_export": true
            }
          },
          "notes": [
            "The complete retained original Switch release describes solar and battery groundbreakings and broad Tahoe Reno provider context. It does not independently establish current exact computing service or construction at this numbered Tahoe Reno building. The same primary energy article is not counted as two independently commissioned buildings. Its undated publication and energy construction are not exact computing opening events.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-and-capital-dynamics-break-ground-on-massive-solar-and-battery-storage-developments-advancing-rob-roys-gigawatt-nevada/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    },
    {
      "id": "vantage-nv1-storey-county-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Vantage Data Centers NV1",
      "group": "proposed",
      "status": "Provider listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Storey"
      ],
      "city": "McCarran",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-07-15",
          "Vantage dated its original NV1 campus announcement July 15, 2025. The announcement projects a first building opening in the second quarter of 2026. This records the announcement day without treating that forecast as an accomplished opening or commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
          "host": "vantage-dc.com",
          "date": "2025-07-15",
          "published": "2025-07-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.50668,
        "lng": -119.51037,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_capacity_mw": 224,
            "power_basis": "campus capacity, IT versus gross unspecified in release",
            "planned_investment_usd_approx": 3000000000,
            "campus_acres_approx": 137,
            "planned_buildings": 4,
            "planned_area_sqft_min_exclusive": 1000000,
            "first_building_opening_target": "2026-Q2",
            "first_two_buildings_lease_status": "fully leased at announcement",
            "forecast_combined_construction_operations_jobs_min_exclusive": 1200
          },
          "notes": [
            "Past target is not proof opening. Lease status does not mean delivered. Investment nearly3Bnot actualspend.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "date": "2025-07-15",
              "published": "2025-07-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The July 15, 2025 NV1 announcement names Storey County and a first building target in the second quarter of 2026. A past target and reported leasing do not establish actual current operation.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "published": "2025-07-15",
              "date": "2025-07-15",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "provider_listed_nv1_proposal",
              "scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted."
            },
            "source_read_scope": {
              "complete_original_announcement_body_read": true,
              "forecast_opening_not_current_completion": true,
              "leased_capacity_not_operational_capacity": true
            }
          },
          "notes": [
            "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "published": "2025-07-15",
              "date": "2025-07-15",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCarran · Storey · Source context reviewed",
      "status_scope": "The complete original provider announcement explicitly lists the NV1 Storey County campus proposal and its planned buildings. This supports a provider listed proposal. Fully leased buildings, expected cooling performance and the forecast second quarter of 2026 opening do not independently establish construction completion or actual computing service. The passed forecast is not treated as an accomplished opening and no unverified present operational capacity is adopted.",
      "event_evidence": [
        {
          "date": "2025-07-15",
          "text": "Vantage dated its original NV1 campus announcement July 15, 2025. The announcement projects a first building opening in the second quarter of 2026. This records the announcement day without treating that forecast as an accomplished opening or commissioning.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
              "host": "vantage-dc.com",
              "published": "2025-07-15",
              "date": "2025-07-15",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32029"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}