{
  "schema_version": 1,
  "source_compilation_context": {
    "nv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nv.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "32031",
    "label": "Washoe County, Nevada"
  },
  "records": [
    {
      "id": "apple-reno-nv",
      "state": "nv",
      "kind": "facility",
      "name": "Apple Reno Data Center (Reno Technology Park)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washoe"
      ],
      "city": "Sparks",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Apple Washoe expansion incentive application facts,notpaidaward. Application/boardpacket not observed actual spend, taxsaving or final executed approval. Fiveyearcapex is within tenyearprojection, not additive.1281economicimpactjobs include1257construction andindirecteffects, not permanent onsitepositions. Solarprojects offsite generation notITload. Claimed130600millionmetrictonsCO2avoided implausible; fieldquarantined without silent correction. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-07-11",
          "The Apple letter in the original GOED packet bears July 11, 2024 and describes existing Reno operations and proposed expansion. This dates the issuer letter rather than an incentive award, first opening or completion of the expansion."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
          "host": "goed.nv.gov",
          "date": "2024-07-25",
          "published": "2024-07-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.66573,
        "lng": -119.66433,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Apple Washoe expansion incentive application facts,notpaidaward",
          "fields": {
            "board_packet_date": "2024-07-25",
            "published_company_site_address": "21505 RenoTechnologyParkwayWest,Sparks,NV89434",
            "published_county": "Washoe,Nevada",
            "historical_opening_month": "2012-12",
            "five_year_proposed_equipment_capex_usd": 742071428,
            "ten_year_proposed_equipment_capex_usd": 992071428,
            "estimated_ten_year_sales_tax_abatement_usd": 62153275,
            "proposed_new_fulltime_jobs_first5years": 10
          },
          "notes": [
            "Application/boardpacket not observed actual spend, taxsaving or final executed approval. Fiveyearcapex is within tenyearprojection, not additive.1281economicimpactjobs include1257construction andindirecteffects, not permanent onsitepositions. Solarprojects offsite generation notITload. Claimed130600millionmetrictonsCO2avoided implausible; fieldquarantined without silent correction.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
              "host": "goed.nv.gov",
              "date": "2024-07-25",
              "published": "2024-07-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "Selected original July 2024 GOED packet pages publish an Apple letter describing existing Reno data center operations and a separate expansion request. The account identifies Washoe County, while broader Nevada summaries use regional county groupings. The letter establishes an attributed historical service account without certifying the current completion of the expansion or independently crosswalking every regional building. The forecast expansion month and an incentive application are not commissioned capacity. The original 2026 environmental report exceeded the bounded capture limit and was not read. No exact first opening day or present physical stage is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_issuer_operation_and_expansion_letter_current_stage_held",
              "scope": "Selected original July 2024 GOED packet pages publish an Apple letter describing existing Reno data center operations and a separate expansion request. The account identifies Washoe County, while broader Nevada summaries use regional county groupings. The letter establishes an attributed historical service account without certifying the current completion of the expansion or independently crosswalking every regional building. The forecast expansion month and an incentive application are not commissioned capacity. The original 2026 environmental report exceeded the bounded capture limit and was not read. No exact first opening day or present physical stage is adopted."
            },
            "source_read_scope": {
              "original_packet_physical_pages": [
                1,
                2,
                3,
                4,
                6
              ],
              "complete_packet_review_not_claimed": true,
              "existing_operation_separate_from_expansion": true,
              "month_only_opening_not_exact_day": true,
              "regional_county_assignment_unchanged": true,
              "oversize2026_report_unread": true
            }
          },
          "notes": [
            "Selected original July 2024 GOED packet pages publish an Apple letter describing existing Reno data center operations and a separate expansion request. The account identifies Washoe County, while broader Nevada summaries use regional county groupings. The letter establishes an attributed historical service account without certifying the current completion of the expansion or independently crosswalking every regional building. The forecast expansion month and an incentive application are not commissioned capacity. The original 2026 environmental report exceeded the bounded capture limit and was not read. No exact first opening day or present physical stage is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
              "host": "goed.nv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sparks · Washoe · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-07-11",
          "text": "The Apple letter in the original GOED packet bears July 11, 2024 and describes existing Reno operations and proposed expansion. This dates the issuer letter rather than an incentive award, first opening or completion of the expansion.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
              "host": "goed.nv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32031"
      }
    },
    {
      "id": "centra-rno2-keystone-reno-nv",
      "state": "nv",
      "kind": "facility",
      "name": "CENTRA RNO2 (Keystone Data Center)",
      "group": "building",
      "status": "Construction documented by City",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Washoe"
      ],
      "city": "Reno",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.. City names Centra Keystone project and reports CUP approval January15,2025 with no appeal filed at that point, allowing building-permit stage. Not a certificate of occupancy, all permits or current RFS. Question22 alleges3MWinitial/6.67MW and12MWadvertisement. City answer refers electrical capacity/service to NVEnergy; it does NOT supply executed power agreement or independently verify12MWIT/current demand. Question assertions are not city findings. Question29 refers to26000gallons initial cooling fill; answer describes changed cooling/documentation, not measured daily consumption. City answer onpage11 anticipates about2acre-feet without printing a time period; no gallons/day/year conversion or zero-water claim adopted. City describes15ftchillerbarrier,53dBAambient and43dBAequipment target, not measured operating compliance. Its residential-zoning applicability and regulator statements are city interpretations, not an independently reviewed court decision. OnlyselectedFAQpages read. Not whole record/current operating census, legal compliance or independent meter certification.",
      "date": "",
      "events": [
        [
          "2025-01-15",
          "The original City of Reno Keystone FAQ reports Planning Commission conditional use approval on January 15, 2025 and says no appeal followed that decision. This is a land use approval account, separate from building completion, utility delivery and computing service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300",
          "host": "reno.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.69393,
        "lng": -119.69512,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-originals-model-and-approval-stages-round55-2026-10-15.json",
          "scope": "Selected original public document pages; draft, city interpretation, application and partly-signed-contract limits retained.",
          "fields": {},
          "notes": [
            "City names Centra Keystone project and reports CUP approval January15,2025 with no appeal filed at that point, allowing building-permit stage. Not a certificate of occupancy, all permits or current RFS.",
            "Question22 alleges3MWinitial/6.67MW and12MWadvertisement. City answer refers electrical capacity/service to NVEnergy; it does NOT supply executed power agreement or independently verify12MWIT/current demand. Question assertions are not city findings.",
            "Question29 refers to26000gallons initial cooling fill; answer describes changed cooling/documentation, not measured daily consumption. City answer onpage11 anticipates about2acre-feet without printing a time period; no gallons/day/year conversion or zero-water claim adopted.",
            "City describes15ftchillerbarrier,53dBAambient and43dBAequipment target, not measured operating compliance. Its residential-zoning applicability and regulator statements are city interpretations, not an independently reviewed court decision. OnlyselectedFAQpages read.",
            "Not whole record/current operating census, legal compliance or independent meter certification."
          ],
          "sources": [
            {
              "url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300",
              "host": "reno.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 67",
          "scope": "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_documented_keystone_construction",
              "scope": "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation."
            },
            "source_read_scope": {
              "complete_original_fifteen_page_faq_text_read": true,
              "blank_last_page_retained": true,
              "july28_is_document_update_not_opening": true,
              "existing_concern_episode_not_duplicated": true,
              "city_responses_not_independent_measured_performance": true,
              "project_conditions_not_countywide_ban": true
            }
          },
          "notes": [
            "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300",
              "host": "www.reno.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Reno · Washoe · Source context reviewed",
      "status_scope": "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation.",
      "event_evidence": [
        {
          "date": "2025-01-15",
          "text": "The original City of Reno Keystone FAQ reports Planning Commission conditional use approval on January 15, 2025 and says no appeal followed that decision. This is a land use approval account, separate from building completion, utility delivery and computing service.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300",
              "host": "www.reno.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "32031"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
