{
  "schema_version": 1,
  "source_compilation_context": {
    "nm": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nm.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "35005",
    "label": "Chaves County, New Mexico"
  },
  "records": [
    {
      "id": "roswell-information-park-chaves-county-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Roswell Information Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chaves"
      ],
      "city": "Roswell",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html",
          "host": "thenewswire.com",
          "date": "2026-05-29",
          "published": "2026-05-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.36332,
        "lng": -104.46697,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Issuer-distributed release says Desert Mountain Energy signed a25-year Roswell Information Park lease with a five-year option, while a separate long-term gas contract and new pipeline route remained to be developed.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html",
              "host": "thenewswire.com",
              "date": "2026-05-29",
              "published": "2026-05-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Roswell · Chaves · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35005"
      }
    },
    {
      "id": "zenith-volts-roswell-chaves-county-data-center-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Zenith Volts Roswell / Chaves County Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chaves"
      ],
      "city": "Roswell",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chaves combined solar/storage/DC summary power-basis correction. Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility",
          "host": "chavescounty.net",
          "date": "2025-08-22",
          "published": "2025-08-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.41634,
        "lng": -104.52484,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Chaves combined solar/storage/DC summary power-basis correction",
          "fields": {
            "publisher_role": "Roswell Chaves County Economic Development Corporation summary linking original article",
            "publication_date": "2025-08-22",
            "developer": "Zenith Volts Corp.",
            "reported_action": "county approved special use permit",
            "proposed_solar_generation_mw": 1265,
            "proposed_data_center_acres": 300,
            "proposed_battery_storage_acres": 250,
            "combined_estimated_project_cost_usd": 6000000000,
            "location": "north side of700/800block WestPearsonRoad near LakeArthur, Chaves/Eddy boundary"
          },
          "notes": [
            "Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility",
              "host": "chavescounty.net",
              "date": "2025-08-22",
              "published": "2025-08-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Roswell · Chaves · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35005"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
