{
  "schema_version": 1,
  "source_compilation_context": {
    "nm": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nm.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "35053",
    "label": "Socorro County, New Mexico"
  },
  "records": [
    {
      "id": "green-data-socorro-county-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Green Data Socorro Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Socorro"
      ],
      "city": "Socorro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [
        [
          "2026-03-06",
          "The original New Mexico Tech minutes record March 6, 2026 direction and authority for continued evaluation of a Green Data Center opportunity. The separate April 17 approval of the minutes does not date construction, an executed lease or computing service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420",
          "host": "abqjournal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf",
          "host": "www.nmt.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.00741,
        "lng": -106.93023,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420",
              "host": "abqjournal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "Selected original Regents minutes dated March 6, 2026 describe a Green Data Center opportunity and direct further evaluation, information gathering and due diligence about impacts, feasibility, infrastructure and water. The minutes were approved on April 17. Authority to continue evaluation is not approval to construct, an executed land lease or computing service. This bounded body does not independently crosswalk all private developer, land area and campus accounts. The County transparency page was read, but its public document folder is disallowed by robots and no County moratorium instrument was obtained. Exact current physical stage remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "institutional_evaluation_authority_not_project_construction_or_service",
              "scope": "Selected original Regents minutes dated March 6, 2026 describe a Green Data Center opportunity and direct further evaluation, information gathering and due diligence about impacts, feasibility, infrastructure and water. The minutes were approved on April 17. Authority to continue evaluation is not approval to construct, an executed land lease or computing service. This bounded body does not independently crosswalk all private developer, land area and campus accounts. The County transparency page was read, but its public document folder is disallowed by robots and no County moratorium instrument was obtained. Exact current physical stage remains held."
            },
            "source_read_scope": {
              "original_five_page_minutes_selected_physical_pages1_3_5_read": true,
              "meeting_day_distinct_from_minutes_approval_day": true,
              "evaluation_authority_not_final_construction_permission": true,
              "no_unread_county_moratorium_or_exact_corporate_crosswalk_adopted": true
            }
          },
          "notes": [
            "Selected original Regents minutes dated March 6, 2026 describe a Green Data Center opportunity and direct further evaluation, information gathering and due diligence about impacts, feasibility, infrastructure and water. The minutes were approved on April 17. Authority to continue evaluation is not approval to construct, an executed land lease or computing service. This bounded body does not independently crosswalk all private developer, land area and campus accounts. The County transparency page was read, but its public document folder is disallowed by robots and no County moratorium instrument was obtained. Exact current physical stage remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf",
              "host": "www.nmt.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Socorro · Socorro · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-03-06",
          "text": "The original New Mexico Tech minutes record March 6, 2026 direction and authority for continued evaluation of a Green Data Center opportunity. The separate April 17 approval of the minutes does not date construction, an executed lease or computing service.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf",
              "host": "www.nmt.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35053"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
