{
  "schema_version": 1,
  "source_compilation_context": {
    "nm": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nm.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "35061",
    "label": "Valencia County, New Mexico"
  },
  "records": [
    {
      "id": "meta-los-lunas-ai-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Meta Los Lunas AI Expansion",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Valencia"
      ],
      "city": "Los Lunas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico",
          "host": "mmcginvest.com",
          "date": "2026-03-07",
          "published": "2026-03-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/los-lunas/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 34.71532,
        "lng": -106.80882,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "MMCG commercial analysis describes Meta Los Lunas phased expansion and reports an approximately USD3.3billion completed-buildout investment, eight completed buildings and later AI-building plans.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico",
              "host": "mmcginvest.com",
              "date": "2026-03-07",
              "published": "2026-03-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "label": "Status unclear",
              "basis": "The current Los Lunas factsheet says the base campus went online in 2018, but does not establish the physical stage of the AI expansion represented by this inherited research record.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The older campus and the named AI expansion are different scopes. The expansion remains unresolved; no generic campus service label, building count, commissioning date or power figure is transferred to it."
          },
          "notes": [
            "The older campus and the named AI expansion are different scopes. The expansion remains unresolved; no generic campus service label, building count, commissioning date or power figure is transferred to it.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/los-lunas/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Los Lunas · Valencia · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35061"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
