{
  "schema_version": 1,
  "source_compilation_context": {
    "ny": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ny.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "36037",
    "label": "Genesee County, New York"
  },
  "records": [
    {
      "id": "stream-stamp-alabama-ny",
      "state": "ny",
      "kind": "facility",
      "name": "STREAM U.S. Data Centers at STAMP",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Genesee"
      ],
      "city": "Alabama",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. June 4 legislative passage still awaited governor signature in this account; do not treat bill passage or related-story headlines as an effective signed moratorium. Planned 19.5 billion cost and requested 1.46 billion sales/mortgage-tax relief are not spent capital or granted incentives. Forecast 550 million taxes is OVER 30 YEARS, not annual.125 permanent jobs and construction positions are forecasts disputed by an opposition-commissioned analysis. Critic-attributed 500 MW is not verified critical IT;25-to-1 benefit ratio is contested advocacy analysis, not an adjudicated result. No operating/RFS/utility contract verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/",
          "host": "rbj.net",
          "date": "2026-06-15",
          "published": "2026-06-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://townofalabamany.gov/wp-content/uploads/2026/06/NMZ-5DRAFT-AlabamaPB-Findings-Form-STREAM-06082026.pdf",
          "host": "townofalabamany.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.gcedc.com/stamp",
          "host": "www.gcedc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 43.00128,
        "lng": -78.19392,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Rochester Business Journal reports Stream’s proposed three-building,2.2-million-square-foot STAMP campus on roughly 90 acres and the legislative debate over a statewide pause.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "June 4 legislative passage still awaited governor signature in this account; do not treat bill passage or related-story headlines as an effective signed moratorium. Planned 19.5 billion cost and requested 1.46 billion sales/mortgage-tax relief are not spent capital or granted incentives. Forecast 550 million taxes is OVER 30 YEARS, not annual.125 permanent jobs and construction positions are forecasts disputed by an opposition-commissioned analysis. Critic-attributed 500 MW is not verified critical IT;25-to-1 benefit ratio is contested advocacy analysis, not an adjudicated result. No operating/RFS/utility contract verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/",
              "host": "rbj.net",
              "date": "2026-06-15",
              "published": "2026-06-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 61",
          "scope": "The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_stream_draft_project_description",
              "scope": "The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation."
            },
            "source_read_scope": {
              "original_draft_selected_intro_and_project_description_read": true,
              "physical_pages1and3_draft_watermark_and_blank_execution_viewed": true,
              "copied_edwards_vacuum_decision_not_stream_approval": true,
              "complete_original_park_main_body_read": true,
              "park_substation_forecast_not_computing": true,
              "no_location_role_or_quantity_export": true
            }
          },
          "notes": [
            "The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://townofalabamany.gov/wp-content/uploads/2026/06/NMZ-5DRAFT-AlabamaPB-Findings-Form-STREAM-06082026.pdf",
              "host": "townofalabamany.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.gcedc.com/stamp",
              "host": "www.gcedc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Alabama · Genesee · Source context reviewed",
      "status_scope": "The original Town hosted draft explicitly names a proposed STREAM data center at STAMP and describes planned computing buildings. This supports a listed proposal within the draft project description, without certifying a final legal outcome. Physical pages one and three show a draft watermark, unfilled execution fields and date placeholders. The cover also retains a November 20, 2023 Edwards Vacuum decision sentence, which is not a STREAM approval. The separate official park page describes infrastructure and a 2026 substation energization forecast, not completed STREAM computing. No draft findings or estimated technical figures are promoted as accomplished approvals, construction or operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "36037"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
