{
  "schema_version": 1,
  "source_compilation_context": {
    "ny": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ny.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "36043",
    "label": "Herkimer County, New York"
  },
  "records": [
    {
      "id": "turin-hoefler-ilion-ny",
      "state": "ny",
      "kind": "facility",
      "name": "Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Herkimer"
      ],
      "city": "Ilion",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/",
          "host": "rockinst.org",
          "date": "2026-06-10",
          "published": "2026-06-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://extapps.dec.ny.gov/data/DecDocs/C622036C/Application.BCP.C622036C.2026-01-12.BCP%20Application.pdf",
          "host": "extapps.dec.ny.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 43.41927,
        "lng": -74.96235,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Rockefeller Institute discusses Massena's proposed three-building campus near Alcoa East and Turin Hoefler's revised brownfield application for an Ilion mixed-use redevelopment.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Reported 635 MW and 200 MW are proposals without verified critical-IT basis. Ilion employment spans the whole mixed use. Brownfield application is not cleanup completion or construction approval. The state's bill is described as awaiting the governor as of June; it must not be labeled enacted from this account. Other local moratorium and statewide bill summaries require original texts and later outcomes.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.rockinst.org/blog/updates-on-the-cloud-more-moratoriums-on-data-centers/",
              "host": "rockinst.org",
              "date": "2026-06-10",
              "published": "2026-06-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 61",
          "scope": "The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_ilion_postremediation_computing_proposal",
              "scope": "The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved."
            },
            "source_read_scope": {
              "original99page_document_selected_cover_and_pages26_29_87_89_read": true,
              "physical_pages26and29_project_and_use_context_viewed": true,
              "applicant_submission_not_state_final_approval": true,
              "anticipated_schedule_not_actual_events_or_notices": true,
              "legacy_industrial_pollution_not_datacenter_causation": true,
              "one_40mb_bound_captured_34618365_bytes": true,
              "no_role_location_or_quantity_export": true
            }
          },
          "notes": [
            "The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://extapps.dec.ny.gov/data/DecDocs/C622036C/Application.BCP.C622036C.2026-01-12.BCP%20Application.pdf",
              "host": "extapps.dec.ny.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ilion · Herkimer · Source context reviewed",
      "status_scope": "The original revised applicant submission dated January 12, 2026 explicitly proposes a data center and AI computing use after remediation at the former Remington Site C. This supports a listed proposal. Selected cover and physical pages 26, 29, 87 and 89 were read, with the project description and current use pages visually checked. This is an applicant account hosted by the State, not a verified final permit, cleanup certificate, completed construction or operating computing facility. Its anticipated project schedule does not establish actual review deadlines or accomplished work. Legacy manufacturing closure and fill contamination are not caused by proposed computing. No forecast capacity, expected employment, financial benefit or health improvement is exported as achieved.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "36043"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
