  "schema_version": 1,
  "source_compilation_context": {
    "nc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nc.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "37145",
    "label": "Person County, North Carolina"
  },
  "records": [
    {
      "id": "microsoft-person-county-roxboro-nc",
      "state": "nc",
      "kind": "facility",
      "name": "Microsoft Person County Mega Park",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Person"
      ],
      "city": "Roxboro",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending. Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/",
          "host": "wral.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/person-county-datacenter-project/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 36.39002,
        "lng": -78.97174,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "EricMiller WRAL June30,2026 originalcommunitymeetingreport (updatedJuly1) identifies MicrosoftPersonCountyWoodsdale/Virginiaborder mega-site;1385acres and28.85M2024landpurchase reported, notcurrentconstructionspending.",
            "Pay-own-way/lowwater promises remainvoluntary assertions inarticle, notexecutedtariff/PPA/abatement/currentmeasuredwater. No ITMW or building approval/operatingdeadline. LaterSeptemberparagraph lacks independenteventdate and doesnotmoveJune30meetingtoSeptember. Localconcerns/poll notmeasuredcampusharm.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/",
              "host": "wral.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_planning_with_preliminary_preparation",
              "scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation."
            },
            "phase_scope": {
              "source_update_period": "April 2026",
              "operator_explicit_phase": "planning",
              "road_work_forecast_is_not_completed_occurrence": true,
              "vertical_datacenter_construction_verified": false
            }
          },
          "notes": [
            "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/person-county-datacenter-project/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Person County data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The page describes planning and early site preparation and road work. An expected reduction in water use from the described cooling design is not a measured quantity or a zero water finding; no actual road closure outcome is newly established."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/person-county-datacenter-project/",
              "host": "local.microsoft.com",
              "published": "2026-05-01",
              "date": "2026-05-01",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Roxboro · Person · Source context reviewed",
      "status_scope": "Microsoft expressly places the Person County programme in planning and describes early soil sampling, surveying and road related preparation in its April 2026 update. Operator listed development describes this proposal. These limited preparations are not a verified start of vertical data center construction, completion of the forecast road work or operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "37145"
      }
    }
  ],