{
  "schema_version": 1,
  "source_compilation_context": {
    "nc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nc.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "37157",
    "label": "Rockingham County, North Carolina"
  },
  "records": [
    {
      "id": "whitefiber-nc1-madison-nc",
      "state": "nc",
      "kind": "facility",
      "name": "WhiteFiber NC-1 AI Data Center Campus",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rockingham"
      ],
      "city": "Madison",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. WhiteFiber NC1 mixed-date status and conditional investment. May2026updatedpagestillusesDec2025futuretargetand24expectedbodywhileheadline24operational;statusconflictheld.200conditionalESAnotcurrentIToradditionalto99.45Mcashpropertyacquisitionnotfullbuildcapex;1Bplanincludesconditionalphasesnotallpaid.970kgrossindustrialreuse notallbuiltDCwhitespace. Noobservedcommissioning/executedtenantlease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-08-12",
          "WhiteFiber issued its corrected quarterly results release August 12, 2026, reporting active customer deployment and initial billing at NC 1. This dates issuer publication, not the first physical commissioning day, full contracted load or completion of every planned campus phase."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.whitefiber.com/blog/nc-1-data-center",
          "host": "whitefiber.com",
          "date": "2026-05-06",
          "published": "2026-05-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/whitefiber-inc-reports-second-quarter-2026-results-302848971.html",
          "host": "www.prnewswire.com",
          "published": "2026-08-12",
          "date": "2026-08-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 36.39602,
        "lng": -79.77497,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "WhiteFiber NC1 mixed-date status and conditional investment",
          "fields": {
            "operator": "WhiteFiber",
            "site": "NC1",
            "locality": "Madison, Rockingham County, North Carolina",
            "page_updated_date": "2026-05-06",
            "existing_industrial_sqft_approx": 970000,
            "site_acres": 96,
            "reported_cash_property_purchase_usd": 45000000,
            "headline_operational_power_mw": 24,
            "body_expected_power_mw": 24,
            "body_expected_power_target": "2025-Q4",
            "historical_go_live_target": "2025-12",
            "reported_power_secured_mw": 99,
            "conditional_potential_power_mw_max": 200,
            "planned_investment_usd_min_exclusive": 1000000000,
            "investment_condition": "up-to200MWfromDukeEnergyoverextendedperiod,financingandexecutionmilestones",
            "first_customer_commitment": "nonbindingLOI",
            "canonical_current_operating_power_mw": null
          },
          "notes": [
            "May2026updatedpagestillusesDec2025futuretargetand24expectedbodywhileheadline24operational;statusconflictheld.200conditionalESAnotcurrentIToradditionalto99.45Mcashpropertyacquisitionnotfullbuildcapex;1Bplanincludesconditionalphasesnotallpaid.970kgrossindustrialreuse notallbuiltDCwhitespace. Noobservedcommissioning/executedtenantlease.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.whitefiber.com/blog/nc-1-data-center",
              "host": "whitefiber.com",
              "date": "2026-05-06",
              "published": "2026-05-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 57",
          "scope": "The original corrected August 12, 2026 WhiteFiber issuer release explicitly reports that NC 1 moved from construction into active customer deployment, that initial billing had commenced and that the site was generating revenue. This supports reported initial service at the named Madison campus within the issuer account. Full contracted billing later that month and larger future campus scale remain forecasts, without a verified exact first commissioning day or current full load. The older blog last updated May 6 mixes operational power with an older expected power date and planned retrofit language; those power and property claims do not independently establish computing operation. The selected SEC filing source was held by unavailable robots, while this distinct original issuer release was independently read.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_corrected_issuer_reports_initial_customer_service",
              "scope": "The original corrected August 12, 2026 WhiteFiber issuer release explicitly reports that NC 1 moved from construction into active customer deployment, that initial billing had commenced and that the site was generating revenue. This supports reported initial service at the named Madison campus within the issuer account. Full contracted billing later that month and larger future campus scale remain forecasts, without a verified exact first commissioning day or current full load. The older blog last updated May 6 mixes operational power with an older expected power date and planned retrofit language; those power and property claims do not independently establish computing operation. The selected SEC filing source was held by unavailable robots, while this distinct original issuer release was independently read."
            },
            "source_read_scope": {
              "original_corrected_issuer_authorship_and_nc1_executive_account_read": true,
              "correction_notice_and_final_correction_note_read": true,
              "original_fiscal_period_not_service_start_day": true,
              "first_billing_and_deployment_not_full_future_contracted_load": true,
              "older_blog_last_updated_not_original_opening_day": true,
              "power_availability_not_compute_occupancy": true,
              "sec_body_not_read_or_substituted": true,
              "no_technical_financial_or_provider_role_export": true
            }
          },
          "notes": [
            "The original corrected August 12, 2026 WhiteFiber issuer release explicitly reports that NC 1 moved from construction into active customer deployment, that initial billing had commenced and that the site was generating revenue. This supports reported initial service at the named Madison campus within the issuer account. Full contracted billing later that month and larger future campus scale remain forecasts, without a verified exact first commissioning day or current full load. The older blog last updated May 6 mixes operational power with an older expected power date and planned retrofit language; those power and property claims do not independently establish computing operation. The selected SEC filing source was held by unavailable robots, while this distinct original issuer release was independently read.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/whitefiber-inc-reports-second-quarter-2026-results-302848971.html",
              "host": "www.prnewswire.com",
              "published": "2026-08-12",
              "date": "2026-08-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.whitefiber.com/blog/nc-1-data-center",
              "host": "www.whitefiber.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Madison · Rockingham · Source context reviewed",
      "status_scope": "The original corrected August 12, 2026 WhiteFiber issuer release explicitly reports that NC 1 moved from construction into active customer deployment, that initial billing had commenced and that the site was generating revenue. This supports reported initial service at the named Madison campus within the issuer account. Full contracted billing later that month and larger future campus scale remain forecasts, without a verified exact first commissioning day or current full load. The older blog last updated May 6 mixes operational power with an older expected power date and planned retrofit language; those power and property claims do not independently establish computing operation. The selected SEC filing source was held by unavailable robots, while this distinct original issuer release was independently read.",
      "event_evidence": [
        {
          "date": "2026-08-12",
          "text": "WhiteFiber issued its corrected quarterly results release August 12, 2026, reporting active customer deployment and initial billing at NC 1. This dates issuer publication, not the first physical commissioning day, full contracted load or completion of every planned campus phase.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/whitefiber-inc-reports-second-quarter-2026-results-302848971.html",
              "host": "www.prnewswire.com",
              "published": "2026-08-12",
              "date": "2026-08-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "37157"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
