  "schema_version": 1,
  "source_compilation_context": {
    "nd": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nd.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "38021",
    "label": "Dickey County, North Dakota"
  },
  "records": [
    {
      "id": "applied-digital-polaris-forge-1-ellendale-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Applied Digital Polaris Forge 1",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dickey"
      ],
      "city": "Ellendale",
      "address": "",
      "who": "Applied Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum phases into campus total again. 250MW is operator-reported commissioned criticalIT capacity, not independently measured demand. July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page 42; operating buildings and a building under construction. An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [
        [
          "2026-10-01",
          "Applied Digital reported the second phase of Building 2 ready for service; further HPC campus construction continued."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1",
          "host": "ir.applieddigital.com",
          "date": "2026-07-01",
          "published": "2026-07-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source for campus operational it mw"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "host": "ir.applieddigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Applied Digital reviewed source"
        }
      ],
      "loc": {
        "lat": 46.1102,
        "lng": -98.50491,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "Ellendale",
            "event_status": "Building2Phase1ready for service",
            "event_date": "2026-07-01",
            "phase_operational_it_mw": 75,
            "campus_operational_it_mw": 250,
            "contracted_full_buildout_it_mw": 400,
            "campus_operational_it_as_of": "2026-10-02"
          },
          "notes": [
            "Do not sum phases into campus total again.",
            "250MW is operator-reported commissioned criticalIT capacity, not independently measured demand.",
            "July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1",
              "host": "ir.applieddigital.com",
              "date": "2026-07-01",
              "published": "2026-07-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            },
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source for campus operational it mw"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer reports; readiness is not metered grid demand.",
          "fields": {
            "announcement_date": "2026-10-07",
            "fiscal_quarter_ended": "2026-08-31",
            "polaris_forge_1_reported_ready_for_service_date": "2026-10-01",
            "polaris_forge_1_reported_operational_critical_it_mw": 250,
            "other_named_ai_campuses_reported_stage": "Various construction stages",
            "jamestown_crypto_facility_mw_as_of_quarter_end": 106,
            "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180,
            "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300,
            "potential_base_electron_generation_mw": 1200
          },
          "notes": [
            "Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Issuer Form10Q Business Update, printed page 42; operating buildings and a building under construction",
          "fields": {
            "operating_phase_context": "Two HPC buildings operate; a third is under construction.",
            "current_status": "partly operating",
            "status_basis": "The issuer identifies two operating HPC buildings and a third under construction.",
            "status_scope": "Operating phase only; full campus buildout remains unresolved."
          },
          "notes": [
            "An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40",
          "events": [
            {
              "date": "2026-10-01",
              "kind": "milestone",
              "text": "Applied Digital reported the second phase of Building 2 ready for service; further HPC campus construction continued.",
              "sources": [
                {
                  "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
                  "host": "ir.applieddigital.com",
                  "date": "2026-10-07",
                  "published": "2026-10-07",
                  "checked": "2026-10-15",
                  "date_kind": "publication",
                  "label": "Reviewed source"
                }
              ]
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "Applied Digital",
              "reporting_period": "2026-05-31",
              "source_name": "Polaris Forge 1",
              "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Applied Digital reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 30, October 23, 2026",
          "scope": "Applied Digital identifies the same uniquely named Polaris Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review. The separate Ellendale cryptocurrency facility is not merged into this HPC campus record. Current marketing and filing building capacity and service descriptions retain their separate scope.",
          "fields": {
            "company_association": {
              "name": "Applied Digital",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Applied Digital identifies the same uniquely named Polaris Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review. The separate Ellendale cryptocurrency facility is not merged into this HPC campus record. Current marketing and filing building capacity and service descriptions retain their separate scope."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Applied Digital identifies the same uniquely named Polaris Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review. The separate Ellendale cryptocurrency facility is not merged into this HPC campus record. Current marketing and filing building capacity and service descriptions retain their separate scope."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ellendale · Dickey · Source context reviewed",
      "status_scope": "An operating phase is supported; full campus completion is not established.",
      "event_evidence": [
        {
          "date": "2026-10-01",
          "kind": "milestone",
          "text": "Applied Digital reported the second phase of Building 2 ready for service; further HPC campus construction continued.",
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38021"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}