{
  "schema_version": 1,
  "source_compilation_context": {
    "nd": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nd.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "38105",
    "label": "Williams County, North Dakota"
  },
  "records": [
    {
      "id": "atlas-power-williston-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Atlas Power Data Center (Williston)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Williams"
      ],
      "city": "Williston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power",
          "host": "yesenergy.com",
          "date": "2024-05-09",
          "published": "2024-05-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://atlaspower.io/",
          "host": "atlaspower.io",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
          "host": "northwesternenergy.com",
          "published": "2024-12-19",
          "date": "2024-12-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 48.34381,
        "lng": -103.48011,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Yes Energy publishes its own historical Atlas Williston load/congestion analysis and describes possible future phases.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power",
              "host": "yesenergy.com",
              "date": "2024-05-09",
              "published": "2024-05-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 71",
          "scope": "The complete original provider body describes current hosting facilities in Montana, North Dakota and Kentucky, and the historical utility release refers to established North Dakota activity. Neither independently names the inherited Williston premise in its read body. The exact site crosswalk and current specific physical stage remain held rather than transferring aggregate state activity to an unverified component. Future power supply, aggregate infrastructure capacity and grid benefit claims are not current commissioned computing at this site.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "aggregate_north_dakota_hosting_exact_williston_crosswalk_held",
              "scope": "The complete original provider body describes current hosting facilities in Montana, North Dakota and Kentucky, and the historical utility release refers to established North Dakota activity. Neither independently names the inherited Williston premise in its read body. The exact site crosswalk and current specific physical stage remain held rather than transferring aggregate state activity to an unverified component. Future power supply, aggregate infrastructure capacity and grid benefit claims are not current commissioned computing at this site."
            },
            "source_read_scope": {
              "complete_original_current_provider_and_historical_utility_bodies_read": true,
              "state_activity_not_exact_premise_operation": true,
              "aggregate_capacity_not_site_capacity": true
            }
          },
          "notes": [
            "The complete original provider body describes current hosting facilities in Montana, North Dakota and Kentucky, and the historical utility release refers to established North Dakota activity. Neither independently names the inherited Williston premise in its read body. The exact site crosswalk and current specific physical stage remain held rather than transferring aggregate state activity to an unverified component. Future power supply, aggregate infrastructure capacity and grid benefit claims are not current commissioned computing at this site.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://atlaspower.io/",
              "host": "atlaspower.io",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
              "host": "northwesternenergy.com",
              "published": "2024-12-19",
              "date": "2024-12-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Williston · Williams · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38105"
      }
    },
    {
      "id": "enerfore-pleasant-valley-tioga-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Enerfore Pleasant Valley Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Williams"
      ],
      "city": "Tioga",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application. Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct. Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk. No later commissioning or current permit result established.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/",
          "host": "sdxcentral.com",
          "date": "2024-10-04",
          "published": "2024-10-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://williamsnd.civicweb.net/document/174556/",
          "host": "williamsnd.civicweb.net",
          "date": "2024-09-17",
          "published": "2024-09-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://williamsnd.civicweb.net/document/175356/",
          "host": "williamsnd.civicweb.net",
          "date": "2024-12-19",
          "published": "2024-12-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 48.36671,
        "lng": -103.50511,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "SDxCentral describes Enerfore's successful appeal allowing a permit application, with a sound study and public comment still ahead.",
            "independently_verified_current_operating_status": null,
            "operator_or_site_identity_needs_crosswalk": true
          },
          "notes": [
            "The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/",
              "host": "sdxcentral.com",
              "date": "2024-10-04",
              "published": "2024-10-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Original county minutes record a four-zero vote approving the appeal so Enerfore could concurrently submit a conditional-use and reduced-setback variance application.",
            "appeal_approval_date": "2024-09-17",
            "vote_ayes": 4,
            "vote_nays": 0,
            "conditional_use_permit_issuance_verified": false
          },
          "notes": [
            "Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application.",
            "Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://williamsnd.civicweb.net/document/174556/",
              "host": "williamsnd.civicweb.net",
              "date": "2024-09-17",
              "published": "2024-09-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Later official agenda lists Enerfore Digital Valley request LU-0086-24 for a cryptocurrency facility in Dry Fork Township.",
            "application_number": "LU-0086-24",
            "printed_location": "Sublot 2 and Sublot 3, Section 4, T155N, R95W; Dry Fork Township",
            "permit_outcome_verified": false
          },
          "notes": [
            "Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk.",
            "No later commissioning or current permit result established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://williamsnd.civicweb.net/document/175356/",
              "host": "williamsnd.civicweb.net",
              "date": "2024-12-19",
              "published": "2024-12-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tioga · Williams · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38105"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
