{
  "schema_version": 1,
  "source_compilation_context": {
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "39027",
    "label": "Clinton County, Ohio"
  },
  "records": [
    {
      "id": "ardent-technologies-wilmington-clinton-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Ardent Technologies Wilmington Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clinton"
      ],
      "city": "Wilmington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. No opening or construction result established. Planned referendum is not a filed or successful referendum; two developments are not one campus. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.whio.com/news/local/another-500-acres-land-zoned-second-data-center-wilmington/KXXP722G6ZD4LMQV2Z6U4UJUQE/",
          "host": "whio.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.41495,
        "lng": -83.80843,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "WHIO reports Wilmington council approved Ardent land rezoning five-two, separate from earlier Amazon rezoning.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No opening or construction result established. Planned referendum is not a filed or successful referendum; two developments are not one campus.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.whio.com/news/local/another-500-acres-land-zoned-second-data-center-wilmington/KXXP722G6ZD4LMQV2Z6U4UJUQE/",
              "host": "whio.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wilmington · Clinton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39027"
      }
    },
    {
      "id": "aws-wilmington-clinton-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS Wilmington Data Center Campus",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clinton"
      ],
      "city": "Wilmington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wilmington official project site and separate annexation petition. Separate545acJanuary15,2026annexation petition by four owners not automatically this471acAWSsite. Developer infrastructure25Mplus forecast not actual completed upgrades or money paid to county. Entitlement/annexation not energization. Nine planned data buildings not operational building census. Quoted current code requirements from FAQ not independent signed ordinance inspection. No ITMW or exact customer service date adopted. School compensation approval reported by agency, but executed signed agreement not independently read. Promised upfront/annual payments not actual receipts. Water6M is ANNUAL, not daily, and not guaranteed peak demand. One-million-gallon PUBLIC water tower is storage capacity, not annual DC consumption. State tax award reported but underlying award not inspected; no local CRA percentage/term guessed from first reading. Distribution/transmission assurances explicitly do not cover generation rates. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-08-07",
          "The Port Authority FAQ reports City Council approval of project site annexation August 7, 2025. This is its bounded government account of that municipal action, not approval or operation of the data center, certification of every annexed parcel or a change to Atlas jurisdiction fields."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs",
          "host": "chooseclintoncountyoh.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.42665,
        "lng": -83.8212,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Wilmington official project site and separate annexation petition",
          "fields": {
            "publisher_role": "Clinton County Port Authority economic-development FAQ",
            "project_operator": "AWS",
            "address": "1488 SouthUS68, Wilmington, Ohio45177",
            "project_site_acres": 471,
            "planned_principal_data_center_buildings": 9,
            "total_planned_building_sqft": 1920299,
            "individual_building_sqft_range": [
              162787,
              219689
            ],
            "agency_reported_annexation_approval_date": "2025-08-07",
            "agency_reported_light_industrial_zoning_approval_date": "2025-08-07",
            "agency_reported_dc_code_requirements_approval_date": "2025-07-17",
            "faq_location_zoning_updated_date": "2026-03-25",
            "developer_paid_public_infrastructure_capex_usd_min_exclusive": 25000000,
            "minimum_expected_permanent_jobs": 100,
            "expected_construction_jobs_min_exclusive": 200,
            "construction_duration_years_min_inclusive": 5,
            "expected_school_annual_revenue_usd": 1000000,
            "agency_reported_school_compensation_approval_date": "2025-11-19",
            "promised_upfront_city_payment_usd": 1500000,
            "separate_port_authority_payment_usd": 350000,
            "expected_annual_city_pilot_plus_income_tax_usd_min_exclusive": 1000000,
            "estimated_annual_water_gallons": 6000000,
            "water_basis": "developer projection quoted in FAQ, not metered actual",
            "water_service_agreement_stage": "being pursued",
            "city_public_water_tower_planned_gallons": 1000000
          },
          "notes": [
            "Separate545acJanuary15,2026annexation petition by four owners not automatically this471acAWSsite. Developer infrastructure25Mplus forecast not actual completed upgrades or money paid to county. Entitlement/annexation not energization. Nine planned data buildings not operational building census. Quoted current code requirements from FAQ not independent signed ordinance inspection. No ITMW or exact customer service date adopted.",
            "School compensation approval reported by agency, but executed signed agreement not independently read. Promised upfront/annual payments not actual receipts. Water6M is ANNUAL, not daily, and not guaranteed peak demand. One-million-gallon PUBLIC water tower is storage capacity, not annual DC consumption. State tax award reported but underlying award not inspected; no local CRA percentage/term guessed from first reading. Distribution/transmission assurances explicitly do not cover generation rates.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs",
              "host": "chooseclintoncountyoh.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_aws_wilmington_proposal_separate_from_other_land_petitions",
              "scope": "The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure."
            }
          },
          "notes": [
            "The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs",
              "host": "www.chooseclintoncountyoh.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wilmington · Clinton · Source context reviewed",
      "status_scope": "The Port Authority current FAQ explicitly names the AWS Wilmington campus proposal and the South US 68 project site, separately distinguishing other land petitions and their unidentified prospective end users. Agency listed proposal is limited to the named AWS account. Its August 7, 2025 annexation statement is not data center commissioning, individual site plan approval or a new jurisdiction edit. Water use, utility effects and community benefits remain attributed design estimates and explanations, not measured outcomes. A future design or service agreement is not delivered infrastructure.",
      "event_evidence": [
        {
          "date": "2025-08-07",
          "text": "The Port Authority FAQ reports City Council approval of project site annexation August 7, 2025. This is its bounded government account of that municipal action, not approval or operation of the data center, certification of every annexed parcel or a change to Atlas jurisdiction fields.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs",
              "host": "www.chooseclintoncountyoh.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39027"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
