  "schema_version": 1,
  "source_compilation_context": {
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "39031",
    "label": "Coshocton County, Ohio"
  },
  "records": [
    {
      "id": "aligned-conesville-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Aligned Data Centers - Conesville Industrial Park",
      "group": "proposed",
      "status": "Operator-announced development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Coshocton"
      ],
      "city": "Conesville",
      "address": "",
      "who": "Aligned Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Multi-billion wording supplies no exact investment amount; no MW in release. Past target does not establish delivered. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. TIF is not no taxes; future capacity/opening are not delivered. Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/",
          "host": "aligneddc.com",
          "date": "2025-07-24",
          "published": "2025-07-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://athensindependent.com/data-centers-across-appalachian-ohio/",
          "host": "athensindependent.com",
          "date": "2026-08-06",
          "published": "2026-08-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.30172,
        "lng": -81.92013,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_development_acres": 197,
            "initial_capacity_delivery_target": "mid2026",
            "initial_customer_status": "foundational customer secured at announcement"
          },
          "notes": [
            "Multi-billion wording supplies no exact investment amount; no MW in release. Past target does not establish delivered.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/",
              "host": "aligneddc.com",
              "date": "2025-07-24",
              "published": "2025-07-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Conesville Aligned Data Centers project described separately, including tax-increment arrangement and future opening.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "TIF is not no taxes; future capacity/opening are not delivered.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://athensindependent.com/data-centers-across-appalachian-ohio/",
              "host": "athensindependent.com",
              "date": "2026-08-06",
              "published": "2026-08-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "Aligned announces planned development of a data center campus inside Conesville Industrial Park.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_announced_development",
              "scope": "Aligned announces planned development of a data center campus inside Conesville Industrial Park."
            }
          },
          "notes": [
            "The original delivery target has passed, but a target is not a completion report. Current commissioning and an exact physical-stage date remain unestablished."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/",
              "host": "aligneddc.com",
              "published": "2025-07-24",
              "date": "2025-07-24",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 13, October 23, 2026",
          "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The July 24, 2025 announcement reports planned development and a mid 2026 target. The target is not adopted as an event that happened or a current service date.",
          "fields": {
            "company_association": {
              "name": "Aligned Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The July 24, 2025 announcement reports planned development and a mid 2026 target. The target is not adopted as an event that happened or a current service date."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted. The July 24, 2025 announcement reports planned development and a mid 2026 target. The target is not adopted as an event that happened or a current service date.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/",
              "host": "aligneddc.com",
              "published": "2025-07-24",
              "date": "2025-07-24",
              "checked": "2026-10-23",
              "label": "First party exact named code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Conesville · Coshocton · Source context reviewed",
      "status_scope": "Aligned announces planned development of a data center campus inside Conesville Industrial Park.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39031"
      }
    },
    {
      "id": "standard-power-coshocton-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Standard Power Coshocton",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Coshocton"
      ],
      "city": "Coshocton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Host publication metadata is November 28, 2023, not a new opening. Monday ribbon-cutting day is relative and not assigned an inferred exact date. Historical 50 MW is not certified critical IT/current load. Proposed nearby Conesville 700 MW is a distinct project, not additive capacity at Coshocton. Plans for over 100 employees or more power by 2023 are unobserved forecasts in this retained account. October 2018 property purchase and 2015 paper-mill closure are separate history events. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2021-07-12",
          "Energy Harbor announced a supply partnership for the Standard Power Coshocton mining project on July 12, 2021. The release forecasts a December 2021 supply start; neither the forecast nor this announcement dates an accomplished computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://frontier-companies.com/coshoctons-standard-power-center-powers-blockchain-mining-for-ohio/",
          "host": "frontier-companies.com",
          "date": "2022-09-21",
          "published": "2022-09-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/energy-harbor-partners-with-standard-power-to-provide-carbon-free-nuclear-power-to-new-ohio-bitcoin-blockchain-mining-center-301331473.html",
          "host": "www.prnewswire.com",
          "published": "2021-07-12",
          "date": "2021-07-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.coshoctoncounty.net/rpc/wp-content/uploads/sites/22/2025/01/Minutes-from-full-board-attachments-11-18-24-Approved.pdf",
          "host": "www.coshoctoncounty.net",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 40.31203,
        "lng": -81.93139,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Frontier Companies republishes a September 21, 2022 Coshocton Tribune account of Standard Power’s ribbon cutting at 500 North Fourth Street, with reported 50 MW mining operation and about twenty employees at that time.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Host publication metadata is November 28, 2023, not a new opening. Monday ribbon-cutting day is relative and not assigned an inferred exact date. Historical 50 MW is not certified critical IT/current load. Proposed nearby Conesville 700 MW is a distinct project, not additive capacity at Coshocton. Plans for over 100 employees or more power by 2023 are unobserved forecasts in this retained account. October 2018 property purchase and 2015 paper-mill closure are separate history events.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://frontier-companies.com/coshoctons-standard-power-center-powers-blockchain-mining-for-ohio/",
              "host": "frontier-companies.com",
              "date": "2022-09-21",
              "published": "2022-09-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 62",
          "scope": "The complete original July 12, 2021 Energy Harbor issuer release announces a supply contract with a projected December 2021 start. It does not establish that computing actually opened on that forecast. Selected physical page one of the original November 18, 2024 County minutes describes a wastewater lagoon closure plan and anticipated later dewatering, not closure of a computing facility. Current Standard Power and CS Global original robots requests remain held. Older service accounts, contract terms and nearby Conesville development are not present exact computing confirmation, measured load or an assumed closure.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_supply_announcement_and_lagoon_workflow_present_computing_stage_held",
              "scope": "The complete original July 12, 2021 Energy Harbor issuer release announces a supply contract with a projected December 2021 start. It does not establish that computing actually opened on that forecast. Selected physical page one of the original November 18, 2024 County minutes describes a wastewater lagoon closure plan and anticipated later dewatering, not closure of a computing facility. Current Standard Power and CS Global original robots requests remain held. Older service accounts, contract terms and nearby Conesville development are not present exact computing confirmation, measured load or an assumed closure."
            },
            "source_read_scope": {
              "complete_original_energyharbor_issuer_body_read": true,
              "december2021_supply_target_not_actual_opening": true,
              "original_county_minutes_selected_physical_page1_read": true,
              "lagoon_reclamation_forecast_not_data_center_closure": true,
              "current_provider_robots_holds_retained": true,
              "no_role_location_capacity_or_supply_quantity_export": true
            }
          },
          "notes": [
            "The complete original July 12, 2021 Energy Harbor issuer release announces a supply contract with a projected December 2021 start. It does not establish that computing actually opened on that forecast. Selected physical page one of the original November 18, 2024 County minutes describes a wastewater lagoon closure plan and anticipated later dewatering, not closure of a computing facility. Current Standard Power and CS Global original robots requests remain held. Older service accounts, contract terms and nearby Conesville development are not present exact computing confirmation, measured load or an assumed closure.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/energy-harbor-partners-with-standard-power-to-provide-carbon-free-nuclear-power-to-new-ohio-bitcoin-blockchain-mining-center-301331473.html",
              "host": "www.prnewswire.com",
              "published": "2021-07-12",
              "date": "2021-07-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.coshoctoncounty.net/rpc/wp-content/uploads/sites/22/2025/01/Minutes-from-full-board-attachments-11-18-24-Approved.pdf",
              "host": "www.coshoctoncounty.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Coshocton · Coshocton · Source context reviewed",
      "event_evidence": [
        {
          "date": "2021-07-12",
          "text": "Energy Harbor announced a supply partnership for the Standard Power Coshocton mining project on July 12, 2021. The release forecasts a December 2021 supply start; neither the forecast nor this announcement dates an accomplished computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/energy-harbor-partners-with-standard-power-to-provide-carbon-free-nuclear-power-to-new-ohio-bitcoin-blockchain-mining-center-301331473.html",
              "host": "www.prnewswire.com",
              "published": "2021-07-12",
              "date": "2021-07-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39031"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}