{
  "schema_version": 1,
  "source_compilation_context": {
    "oh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/oh.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "39089",
    "label": "Licking County, Ohio"
  },
  "records": [
    {
      "id": "aligned-pataskala-licking-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Aligned Data Centers  -  Pataskala",
      "group": "proposed",
      "status": "Operator listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Pataskala",
      "address": "",
      "who": "Aligned Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Neither recommendation is council decision; August 25 hearing andJuly 6 petition submission were future.200 MWbasis is undefined, not criticalIT/currentload or an executed electricity agreement. Fuel-cell/closed-loop claims are proposed design, not hydrogen supply contract or zero-water guarantee.110 jobs andJEDDincome-tax estimates are forecasts;300,000 dollarpostconstructionperiod is not explicit annual revenue. Four-to-three redesign is not sevenbuildings. Proposedcharter 25 MWthreshold is not adopted law. Directory 139 regional/224 statecounts are not independently verified operating census. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html",
          "host": "aol.com",
          "date": "2026-06-30",
          "published": "2026-06-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://aligneddc.com/pataskala-oh-data-center/",
          "host": "aligneddc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.09155,
        "lng": -82.48306,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "NewarkAdvocate viaAOL reports Aligned’s revised three-building 89-acre Pataskala 200 MWproposal with staff recommendation in favor but planning commission 5 to 2 recommendation to reject.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Neither recommendation is council decision; August 25 hearing andJuly 6 petition submission were future.200 MWbasis is undefined, not criticalIT/currentload or an executed electricity agreement. Fuel-cell/closed-loop claims are proposed design, not hydrogen supply contract or zero-water guarantee.110 jobs andJEDDincome-tax estimates are forecasts;300,000 dollarpostconstructionperiod is not explicit annual revenue. Four-to-three redesign is not sevenbuildings. Proposedcharter 25 MWthreshold is not adopted law. Directory 139 regional/224 statecounts are not independently verified operating census.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.aol.com/articles/pataskala-allow-data-center-industrial-180844000.html",
              "host": "aol.com",
              "date": "2026-06-30",
              "published": "2026-06-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 19",
          "scope": "Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_operator_proposal_not_accomplished_construction",
              "scope": "Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established."
            }
          },
          "notes": [
            "Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/pataskala-oh-data-center/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 13, October 23, 2026",
          "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted.",
          "fields": {
            "company_association": {
              "name": "Aligned Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Aligned Data Centers describes development of this named campus in its own source. Developer is the attributed provider brand relationship, not proof of current construction, completed works, operating service, legal ownership or a confirmed parcel. No status, location, physical date, quantity or environmental outcome is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/pataskala-oh-data-center/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact named code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pataskala · Licking · Source context reviewed",
      "status_scope": "Aligned current Pataskala page describes a proposed campus and proposed site plan. Operator listed development describes that proposal only. Cooling, jobs and dedicated power infrastructure are company plans or commitments, not measured effects, delivered utility capacity, completed construction or operation. No exact construction start, current permit or opening day is established.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "aws-2550-beech-road-new-albany-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS New Albany (2550 Beech Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Assessed improvements/abatements are property records, not investment or incentive payments. Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111744-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
          "host": "www.aboutamazon.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.10383,
        "lng": -82.49647,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "parcel": "095-111744-00.000",
            "parcel_owner": "VADATA INC",
            "parcel_site_address": "2550 BEECH RD NW",
            "tax_acres": 67.27,
            "county": "Licking"
          },
          "notes": [
            "Assessed improvements/abatements are property records, not investment or incentive payments.",
            "Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111744-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 54",
          "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "broader_new_albany_market_not_exact_component_stage",
              "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."
            },
            "source_read_scope": {
              "selected_section": "August 7, 2025 AWS data centers in New Albany",
              "current_rolling_source_not_all_articles_read": true,
              "regional_service_not_transferred_to_every_building": true,
              "no_site_event_from_broader_market_publication": true
            }
          },
          "notes": [
            "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
              "host": "www.aboutamazon.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "aws-3180-beech-road-new-albany-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS New Albany (3180 Beech Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Assessed improvements/abatements are property records, not investment or incentive payments. 3180 street number is not present in this queried parcel. Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
          "host": "www.aboutamazon.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.06593,
        "lng": -82.48081,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "parcel": "095-111618-04.000",
            "parcel_owner": "AMAZON DATA SERVICES INC",
            "parcel_site_address": "BEECH RD NW",
            "tax_acres": 106.41,
            "county": "Licking"
          },
          "notes": [
            "Assessed improvements/abatements are property records, not investment or incentive payments.",
            "3180 street number is not present in this queried parcel.",
            "Official Licking County parcel query returns ownership/location. It does not demonstrate commissioned servers or operating load.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-111618-04.000'&outFields=*&returnCentroid=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 54",
          "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "broader_new_albany_market_not_exact_component_stage",
              "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."
            },
            "source_read_scope": {
              "selected_section": "August 7, 2025 AWS data centers in New Albany",
              "current_rolling_source_not_all_articles_read": true,
              "regional_service_not_transferred_to_every_building": true,
              "no_site_event_from_broader_market_publication": true
            }
          },
          "notes": [
            "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
              "host": "www.aboutamazon.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "aws-beech-road-new-albany-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS New Albany (Beech/Miller Road Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25AMAZON%25'&outFields=*&returnCentroid=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
          "host": "www.aboutamazon.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.11654,
        "lng": -82.4639,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 8,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 93672,
                "Parcel": "093-106422-00.004",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "2575 NEWTON CT ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 1.64
              },
              {
                "PID": 96925,
                "Parcel": "095-111408-00.000",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "BEECH RD ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 199.81
              },
              {
                "PID": 93874,
                "Parcel": "095-111618-04.000",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "BEECH RD NW",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 106.41
              },
              {
                "PID": 96928,
                "Parcel": "095-111648-00.000",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "MILLER RD NW",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 67.68
              },
              {
                "PID": 96932,
                "Parcel": "095-111870-00.000",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "BEECH RD NW",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 0.27
              },
              {
                "PID": 90304,
                "Parcel": "095-112074-00.000",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "2575 NEWTON CT ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 92.69
              },
              {
                "PID": 96936,
                "Parcel": "095-112248-00.000",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "13757 MILLER RD ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 12.9
              },
              {
                "PID": 96941,
                "Parcel": "095-112248-00.001",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "BEECH RD ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 71.3
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25AMAZON%25'&outFields=*&returnCentroid=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 54",
          "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "broader_new_albany_market_not_exact_component_stage",
              "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."
            },
            "source_read_scope": {
              "selected_section": "August 7, 2025 AWS data centers in New Albany",
              "current_rolling_source_not_all_articles_read": true,
              "regional_service_not_transferred_to_every_building": true,
              "no_site_event_from_broader_market_publication": true
            }
          },
          "notes": [
            "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
              "host": "www.aboutamazon.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "aws-newton-court-new-albany-oh",
      "state": "oh",
      "kind": "facility",
      "name": "AWS New Albany (Newton Court)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
          "host": "www.aboutamazon.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.08521,
        "lng": -82.51888,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 1,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 90304,
                "Parcel": "095-112074-00.000",
                "OwnerName": "AMAZON DATA SERVICES INC",
                "SiteAddress": "2575 NEWTON CT ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 92.69
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'095-112074-00.000'&outFields=*&returnCentroid=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 54",
          "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "broader_new_albany_market_not_exact_component_stage",
              "scope": "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed."
            },
            "source_read_scope": {
              "selected_section": "August 7, 2025 AWS data centers in New Albany",
              "current_rolling_source_not_all_articles_read": true,
              "regional_service_not_transferred_to_every_building": true,
              "no_site_event_from_broader_market_publication": true
            }
          },
          "notes": [
            "The retained original Amazon locations news page contains an August 7, 2025 New Albany market and community investment account. It does not individually identify this inherited street or campus component as currently commissioned computing. Market investment, general jobs and community programs do not certify service in every building or establish a separate campus identity. Exact physical stage remains held and no street, parcel, provider role, component count or quantity is changed.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
              "host": "www.aboutamazon.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "cologix-johnstown-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Cologix Johnstown AI-Ready Campus",
      "group": "proposed",
      "status": "Announced development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Johnstown",
      "address": "",
      "who": "Cologix",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Potential800MWnot energized. ExistingColumbus500k/80MWportfolio not Johnstowncampus.525Msecuritizationnav not siteinvestment. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-11-20",
          "Cologix published its Johnstown land acquisition and planned campus release on November 20, 2024. The anticipated 2025 first phase development remains a forecast in that source. This is the release date, not an exact construction start, power delivery or opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/",
          "host": "cologix.com",
          "date": "2024-11-20",
          "published": "2024-11-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.06972,
        "lng": -82.44875,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_investment_usd_min_exclusive": 7000000000,
            "land_acres_approx": 154,
            "full_build_planned_buildings": 8,
            "potential_campus_capacity_mw": 800,
            "power_basis": "potential capacity, not explicitlyIT",
            "planned_campus_area_sqft": 2000000,
            "first_phase_development_start_target_year": 2025
          },
          "notes": [
            "Potential800MWnot energized. ExistingColumbus500k/80MWportfolio not Johnstowncampus.525Msecuritizationnav not siteinvestment.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/",
              "host": "cologix.com",
              "date": "2024-11-20",
              "published": "2024-11-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 19",
          "scope": "Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "dated_johnstown_acquisition_not_current_columbus_operation",
              "scope": "Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified."
            },
            "source_read_scope": {
              "raw_response_gzip_decoded_locally": true,
              "decode_receipt": "cohort-19-captures/cologix.com/c19-johnstown-f53d5bbc.decode-receipt.json",
              "original_capture_preserved": true,
              "columbus_existing_service_not_johnstown_operation": true
            }
          },
          "notes": [
            "Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/",
              "host": "cologix.com",
              "published": "2024-11-20",
              "date": "2024-11-20",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 16, October 23, 2026",
          "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The November 20, 2024 company announcement names land acquisition and planned Johnstown campus development. Its 2025 start target, eight building plan, potential capacity and seller identity do not establish actual current construction, legal title, complete boundaries or equivalence with COL7 and COL8.",
          "fields": {
            "company_association": {
              "name": "Cologix",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The November 20, 2024 company announcement names land acquisition and planned Johnstown campus development. Its 2025 start target, eight building plan, potential capacity and seller identity do not establish actual current construction, legal title, complete boundaries or equivalence with COL7 and COL8."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Cologix explicitly identifies the retained named code or grouped campus in its own source. The developer role is an attributed provider brand relationship, not independently established legal ownership, whole building control or current operation of every phase. No status, location, address, physical date, capacity, water figure, safety finding, certification, environmental outcome or incentive eligibility is promoted. The November 20, 2024 company announcement names land acquisition and planned Johnstown campus development. Its 2025 start target, eight building plan, potential capacity and seller identity do not establish actual current construction, legal title, complete boundaries or equivalence with COL7 and COL8.",
            "Publication dates, retrieval dates, targets and physical milestones stay separate. Raw response hashes remain original; gzip text derivatives are retained separately."
          ],
          "sources": [
            {
              "url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/",
              "host": "cologix.com",
              "published": "2024-11-20",
              "date": "2024-11-20",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Johnstown · Licking · Source context reviewed",
      "status_scope": "Cologix November 20, 2024 release announces a Johnstown land acquisition and planned data center campus. Announced development describes that dated proposal. Its anticipated 2025 first phase development is a forecast, not evidence that construction occurred. Existing Columbus operations and facilities completed elsewhere are separate. The current Johnstown physical stage and operation remain unverified.",
      "event_evidence": [
        {
          "date": "2024-11-20",
          "text": "Cologix published its Johnstown land acquisition and planned campus release on November 20, 2024. The anticipated 2025 first phase development remains a forecast in that source. This is the release date, not an exact construction start, power delivery or opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/",
              "host": "cologix.com",
              "published": "2024-11-20",
              "date": "2024-11-20",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "cyrusone-new-albany-col1-licking-county-oh",
      "state": "oh",
      "kind": "facility",
      "name": "CyrusOne New Albany COL-1",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Johnstown",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Address-number query returns two different streets and owners. Only the Jug Street/C1 New Albany parcel is an identity candidate; do not merge the Johnstown-Utica property or add both acres. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=SiteAddress+LIKE+%27%2512181%25%27&outFields=*&returnGeometry=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.13456,
        "lng": -82.49463,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 2,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 36887,
                "Parcel": "052-173028-00.000",
                "OwnerName": "SPHERE PROPERTIES LLC",
                "SiteAddress": "12181 JOHNSTOWN-UTICA RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 1.78
              },
              {
                "PID": 95785,
                "Parcel": "095-112236-00.000",
                "OwnerName": "C1 NEW ALBANY LLC",
                "SiteAddress": "12181 JUG STREET RD ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 89.81
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Address-number query returns two different streets and owners. Only the Jug Street/C1 New Albany parcel is an identity candidate; do not merge the Johnstown-Utica property or add both acres.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=SiteAddress+LIKE+%27%2512181%25%27&outFields=*&returnGeometry=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Johnstown · Licking · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "edgeconnex-mcn-new-albany-licking-county-oh",
      "state": "oh",
      "kind": "facility",
      "name": "EdgeConneX MCN New Albany (South Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25EDGECONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.04885,
        "lng": -82.50524,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 17,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 37146,
                "Parcel": "052-173658-00.000",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "JOHNSTOWN-UTICA RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 35.2
              },
              {
                "PID": 37147,
                "Parcel": "052-173658-00.002",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "JOHNSTOWN-UTICA RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 4.0
              },
              {
                "PID": 37148,
                "Parcel": "052-173658-00.003",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "13490 GREEN CHAPEL RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 2.53
              },
              {
                "PID": 37149,
                "Parcel": "052-173658-00.004",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "GREEN CHAPEL RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 2.53
              },
              {
                "PID": 37150,
                "Parcel": "052-173658-00.005",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "GREEN CHAPEL RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 2.53
              },
              {
                "PID": 37151,
                "Parcel": "052-173658-00.006",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "GREEN CHAPEL RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 1.33
              },
              {
                "PID": 37152,
                "Parcel": "052-173664-00.000",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "13151 JOHNSTOWN-UTICA RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 79.86
              },
              {
                "PID": 37357,
                "Parcel": "052-174306-00.000",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "13399 JOHNSTOWN-UTICA RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 0.75
              },
              {
                "PID": 37649,
                "Parcel": "052-176184-00.000",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "13399 JOHNSTOWN-UTICA RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 1.0
              },
              {
                "PID": 37650,
                "Parcel": "052-176184-00.001",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "GREEN CHAPEL RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 1.33
              },
              {
                "PID": 37651,
                "Parcel": "052-176184-00.002",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "GREEN CHAPEL RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 1.33
              },
              {
                "PID": 37652,
                "Parcel": "052-176184-00.004",
                "OwnerName": "EDGECONNEX MCN PIPER FARMS PROPERTY 8 LLC",
                "SiteAddress": "JOHNSTOWN-UTICA RD ",
                "SitePostalCity": "JOHNSTOWN",
                "Jurisdiction": "Monroe Twp.",
                "Municipality": null,
                "Township": "Monroe",
                "TaxAcres": 3.99
              },
              {
                "PID": 95774,
                "Parcel": "093-107490-00.002",
                "OwnerName": "EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC",
                "SiteAddress": "INNOVATION CAMPUS WAY ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 14.78
              },
              {
                "PID": 96257,
                "Parcel": "095-111720-00.000",
                "OwnerName": "EDGECONNEX MCN NEW ALBANY NORTH PROPCO 1 LLC",
                "SiteAddress": "3356 CLOVER VALLEY RD NW",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 170.29
              },
              {
                "PID": 96920,
                "Parcel": "095-112056-00.006",
                "OwnerName": "EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC",
                "SiteAddress": "12525 JUG STREET RD ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 9.28
              },
              {
                "PID": 91103,
                "Parcel": "095-112080-02.001",
                "OwnerName": "EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC",
                "SiteAddress": "9850 INNOVATION CAMPUS WAY ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 33.86
              },
              {
                "PID": 95687,
                "Parcel": "095-112188-00.000",
                "OwnerName": "EDGECONNEX MCN NEW ALBANY SOUTH PROPCO 2 LLC",
                "SiteAddress": "2465 CLOVER VALLEY RD NW",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 39.61
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25EDGECONNEX%25'&outFields=*&returnCentroid=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "meta-prometheus-new-albany-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Meta Prometheus",
      "group": "proposed",
      "status": "AI expansion planned",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-",
          "host": "spectrumnews1.com",
          "date": "2025-11-17",
          "published": "2025-11-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 40.10919,
        "lng": -82.43475,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Spectrum News reports ongoing Prometheus construction and officials' plans for on-site gas generation at Meta's New Albany campus.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The visible publication date is November 17, not the November 13 URL. Gigawatt-scale, world-first, no-grid-use and no-rate-impact statements are plans or attributed claims, not verified operating metrics or guarantees. Temporary construction jobs are not permanent jobs; no completed generation or power agreement is established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://spectrumnews1.com/oh/columbus/news/2025/11/13/meta-gigawatt-data-center-new-albany-",
              "host": "spectrumnews1.com",
              "date": "2025-11-17",
              "published": "2025-11-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "AI expansion planned",
              "basis": "The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted."
          },
          "notes": [
            "Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current New Albany factsheet specifically names Prometheus and describes its AI role and delivery in future terms. Existing operation of the older New Albany campus does not establish operation or completion of the Prometheus AI expansion. No current delivered gigawatt or energized load is asserted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "microsoft-heath-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Microsoft Heath Data Center",
      "group": "building",
      "status": "Site development underway",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Heath",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.11236,
        "lng": -82.53349,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "latest_dated_update": "2026-07",
            "reported_activity": "Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.",
            "general_contractor": "Ames Construction",
            "vertical_construction_schedule": "Not determined/awaiting detail in March2026 update.",
            "older_mass_grading_forecast": "February through November2026",
            "actual_operational_date": null,
            "reported_access": "Thornwood Drive construction entrance; second off Lees Road planned"
          },
          "notes": [
            "Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.",
            "Future tree-removal or work-hour text does not establish a new hearing or current road closure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_preliminary_site_development",
              "scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred."
            },
            "phase_scope": {
              "reported_activity_period": "July 2026",
              "preliminary_site_works_distinct_from_vertical_construction": true,
              "datacenter_operation_verified": false,
              "month_not_converted_into_exact_start_day": true
            }
          },
          "notes": [
            "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Heath data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor and describes site preparation, truck traffic and erosion controls. Potential Sunday work is not an unrestricted right or proof that work occurred, and no vertical completion or opening is inferred."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/heath-datacenter-construction-updates/",
              "host": "local.microsoft.com",
              "published": "2026-03-02",
              "date": "2026-03-02",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Heath · Licking · Source context reviewed",
      "status_scope": "Microsoft reports continuing site preparation in Heath, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "microsoft-hebron-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Microsoft Hebron Data Center",
      "group": "building",
      "status": "Site development underway",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Hebron",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.. Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization. Future tree-removal or work-hour text does not establish a new hearing or current road closure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.03946,
        "lng": -82.45869,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round16-2026-10-14.json",
          "scope": "Named source section or explicitly limited regional context; no metered load or exact parcel automatically certified.",
          "fields": {
            "latest_dated_update": "2026-07",
            "reported_activity": "Summer site preparation, grading, stormwater controls and fencing; substation work expected to begin.",
            "general_contractor": "Ames Construction",
            "vertical_construction_schedule": "Not determined/awaiting detail in March2026 update.",
            "older_mass_grading_forecast": "February through November2026",
            "actual_operational_date": null,
            "reported_access": "Temporary Canyon Road entrance; permanent east entrance by industrial park planned"
          },
          "notes": [
            "Site preparation is not a completed operating building. Forecast November grading completion not observed as of October14. July substation work is prospective, not actual energization.",
            "Future tree-removal or work-hour text does not establish a new hearing or current road closure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_preliminary_site_development",
              "scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred."
            },
            "phase_scope": {
              "reported_activity_period": "July 2026",
              "preliminary_site_works_distinct_from_vertical_construction": true,
              "datacenter_operation_verified": false,
              "month_not_converted_into_exact_start_day": true
            }
          },
          "notes": [
            "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Hebron data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft names Ames Construction as general contractor. Its possible brief trail closure is prospective, not an observed closure; estimated grading completion is not operation or availability."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/hebron-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2025-11-13",
              "date": "2025-11-13",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hebron · Licking · Source context reviewed",
      "status_scope": "Microsoft reports continuing site preparation in Hebron, including grading, stormwater pond work and erosion controls, in its July 2026 update. Site development underway is scoped to those preliminary physical works. The source treats vertical construction as a later phase and expressly separates construction completion from operation. No finished server building, operating capacity or exact construction start day is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "qts-new-albany-1-franklin-county-oh",
      "state": "oh",
      "kind": "facility",
      "name": "QTS New Albany 1",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/new-albany-1/",
          "host": "q.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 40.14909,
        "lng": -82.46501,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 1,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 98685,
                "Parcel": "094-106404-00.011",
                "OwnerName": "QTS NEW ALBANY I DC1 LLC",
                "SiteAddress": "1235 BEECH RD SW",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 18.1
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-106404-00.011'&outFields=*&f=json&returnGeometry=true&outSR=4326",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "direct-operators-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_named_listing": "New Albany1"
          },
          "notes": [
            "No exact MW, opening event or site capital value adopted. Three-million-dollar electricity-assistance commitment is across Ohio over three years, not this individual campus. County conflict remains in the separate cadastral review.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/new-albany-1/",
              "host": "q.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_development",
              "scope": "QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "status_scope": "QTS explicitly lists New Albany 1 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "qts-new-albany-2-franklin-county-oh",
      "state": "oh",
      "kind": "facility",
      "name": "QTS New Albany 2",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/new-albany-2/",
          "host": "q.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 40.05996,
        "lng": -82.53757,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 1,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 96153,
                "Parcel": "094-107502-00.003",
                "OwnerName": "QTS NEW ALBANY II DC1 LLC",
                "SiteAddress": "BEECH RD SW",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 18.85
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Upstream ID/county label says Franklin, but cited parcel is in the Licking County cadastral service and Jersey Township. Resolve county to the matched physical site before publication; do not retain the imported Franklin label as verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=Parcel%3D'094-107502-00.003'&outFields=*&f=json&returnGeometry=true&outSR=4326",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "direct-operators-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_named_listing": "New Albany2"
          },
          "notes": [
            "No exact MW, opening event or site capital value adopted. Shared statewide assistance commitment cannot be counted again for this campus. County conflict remains unresolved.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/new-albany-2/",
              "host": "q.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_development",
              "scope": "QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "status_scope": "QTS explicitly lists New Albany 2 as in development in its current location directory. This does not establish a physical construction phase or commissioning; the inherited county and address associations are not reverified by this review. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "qts-new-albany-4-licking-county-oh",
      "state": "oh",
      "kind": "facility",
      "name": "QTS New Albany IV",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "New Albany",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25QTS+NEW+ALBANY+IV%25'&outFields=*&returnCentroid=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.07747,
        "lng": -82.41903,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 1,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 97052,
                "Parcel": "095-111570-01.000",
                "OwnerName": "QTS NEW ALBANY IV LLC",
                "SiteAddress": "13335 MILLER RD ",
                "SitePostalCity": "NEW ALBANY",
                "Jurisdiction": "New Albany City",
                "Municipality": "New Albany",
                "Township": "Jersey",
                "TaxAcres": 161.26
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=UPPER(OwnerName)+LIKE+'%25QTS+NEW+ALBANY+IV%25'&outFields=*&returnCentroid=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Albany · Licking · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    },
    {
      "id": "vantage-oh1-new-albany-licking-county-oh",
      "state": "oh",
      "kind": "facility",
      "name": "Vantage Data Centers OH1",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Licking"
      ],
      "city": "Johnstown",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named operator source. Target does not prove delivery by2026. Combined construction/long-term jobs not permanent-only.",
      "date": "",
      "events": [
        [
          "2024-10-25",
          "Vantage published its OH1 campus announcement October 25, 2024 and reported an onsite groundbreaking ceremony that day. This is the dated company account, not independent proof of actual excavation or achievement of the later opening forecast."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=PID%3D96538&outFields=PID,Parcel,OwnerName,SiteAddress&returnGeometry=true&outSR=4326&f=json",
          "host": "gis.lickingcounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
          "host": "vantage-dc.com",
          "date": "2024-10-25",
          "published": "2024-10-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.14721,
        "lng": -82.5222,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "cadastral_response_features": 1,
            "cadastral_error": null,
            "parcel_assertions": [
              {
                "PID": 96538,
                "Parcel": "095-111756-00.009",
                "OwnerName": "VANTAGE DATA CENTERS OH11 LLC",
                "SiteAddress": "2914 HORIZON CT NW"
              }
            ]
          },
          "notes": [
            "Public cadastral attributes are ownership/address/assessment evidence, not operating data-center status, end-user identity or a surveyed building pin. Acres and building area retain original field basis. No geometry is promoted; broad company queries can include unrelated property.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0/query?where=PID%3D96538&outFields=PID,Parcel,OwnerName,SiteAddress&returnGeometry=true&outSR=4326&f=json",
              "host": "gis.lickingcounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "groundbreaking_date": "2024-10-25",
            "planned_investment_usd_min_exclusive": 2000000000,
            "campus_acres": 70,
            "planned_it_capacity_mw": 192,
            "planned_area_sqft_min_exclusive": 1500000,
            "first_building_opening_target": "late2025",
            "forecast_combined_construction_operations_jobs_min_exclusive": 1500
          },
          "notes": [
            "Target does not prove delivery by2026. Combined construction/long-term jobs not permanent-only.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "date": "2024-10-25",
              "published": "2024-10-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 25, 2024 OH1 announcement describes New Albany development and a late 2025 first building target. The reported ceremony and target are not adopted as new timeline events or current operating status.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 25, 2024 OH1 announcement describes New Albany development and a late 2025 first building target. The reported ceremony and target are not adopted as new timeline events or current operating status."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The October 25, 2024 OH1 announcement describes New Albany development and a late 2025 first building target. The reported ceremony and target are not adopted as new timeline events or current operating status.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "published": "2024-10-25",
              "date": "2024-10-25",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 33",
          "scope": "The current named OH1 page still forecasts its first building operational by December 2025 and later phases through 2028. The October 25, 2024 original release reports a celebratory groundbreaking. A past forecast, a ceremony and generic campus capabilities do not verify present individual building service or all campus completion. The existing exact physical phase remains unclear. Current address and quantity fields are not changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_oh1_elapsed_opening_forecast_and_historic_ceremony_not_current_completion",
              "scope": "The current named OH1 page still forecasts its first building operational by December 2025 and later phases through 2028. The October 25, 2024 original release reports a celebratory groundbreaking. A past forecast, a ceremony and generic campus capabilities do not verify present individual building service or all campus completion. The existing exact physical phase remains unclear. Current address and quantity fields are not changed."
            }
          },
          "notes": [
            "The current named OH1 page still forecasts its first building operational by December 2025 and later phases through 2028. The October 25, 2024 original release reports a celebratory groundbreaking. A past forecast, a ceremony and generic campus capabilities do not verify present individual building service or all campus completion. The existing exact physical phase remains unclear. Current address and quantity fields are not changed.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "published": "2024-10-25",
              "date": "2024-10-25",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Johnstown · Licking · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-10-25",
          "text": "Vantage published its OH1 campus announcement October 25, 2024 and reported an onsite groundbreaking ceremony that day. This is the dated company account, not independent proof of actual excavation or achievement of the later opening forecast.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
              "host": "vantage-dc.com",
              "published": "2024-10-25",
              "date": "2024-10-25",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "39089"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
