{
  "schema_version": 1,
  "source_compilation_context": {
    "ok": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ok.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "40103",
    "label": "Noble County, Oklahoma"
  },
  "records": [
    {
      "id": "oklahoma-ai-ventures-black-bear-noble-county-ok",
      "state": "ok",
      "kind": "facility",
      "name": "Black Bear AI Data Center Campus",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Noble"
      ],
      "city": "Perry",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Jericho describes Oklahoma AI Ventures launched April2025 and Black Bear as its flagship development between Oklahoma City and Tulsa. The roughly47000acres describe a subsurface oil/gas JV portfolio, not the data center parcel or fee-simple campus. Noble County identity is not established by this page. Existing infrastructure network and planned grid/gas/hydrogen resilience are not completed campus infrastructure, zero-emission operation or an executed utility agreement. No IT MW, tenant or ready-for-service date verified. Not whole-record or current operating-census certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.jerichoenergyventures.com/aidatacenter",
          "host": "jerichoenergyventures.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.3885,
        "lng": -97.2306,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-and-original-local-reporting-round57-2026-10-15.json",
          "scope": "Operator or original local-reporting context; source dates and proposal stages retained.",
          "fields": {},
          "notes": [
            "Jericho describes Oklahoma AI Ventures launched April2025 and Black Bear as its flagship development between Oklahoma City and Tulsa. The roughly47000acres describe a subsurface oil/gas JV portfolio, not the data center parcel or fee-simple campus. Noble County identity is not established by this page. Existing infrastructure network and planned grid/gas/hydrogen resilience are not completed campus infrastructure, zero-emission operation or an executed utility agreement. No IT MW, tenant or ready-for-service date verified.",
            "Not whole-record or current operating-census certification."
          ],
          "sources": [
            {
              "url": "https://www.jerichoenergyventures.com/aidatacenter",
              "host": "jerichoenergyventures.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 76",
          "scope": "The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_named_black_bear_development",
              "scope": "The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented."
            },
            "source_read_scope": {
              "complete_original_issuer_computing_page_body_read": true,
              "energy_assets_and_readiness_not_computing_operation": true,
              "portfolio_land_not_specific_campus_boundary": true,
              "month_only_not_invented_exact_event_day": true
            }
          },
          "notes": [
            "The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.jerichoenergyventures.com/aidatacenter",
              "host": "www.jerichoenergyventures.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Perry · Noble · Source context reviewed",
      "status_scope": "The complete original issuer page explicitly describes Black Bear as its flagship computing campus development and offers future build to suit facilities. This supports a company listed proposal. Producing oil and gas infrastructure, available energy and deployment readiness are not proof of computing construction or operation at this campus. The broad subsurface portfolio is separate from the physical campus area. The venture account gives April 2025 without an exact day, so no exact announcement event is invented.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "40103"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
