{
  "schema_version": 1,
  "source_compilation_context": {
    "ok": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ok.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "40111",
    "label": "Okmulgee County, Oklahoma"
  },
  "records": [
    {
      "id": "fluidstack-okmulgee-county-ok",
      "state": "ok",
      "kind": "facility",
      "name": "Fluidstack Okmulgee County Data Center",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Okmulgee"
      ],
      "city": "Okmulgee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Okmulgee forecast, tenant claim and voluntary commitments. 7McommitmentnotactualpaymentorsignedCBAschedule. No executedtenantleaseorMWread. Statutorycompliance/ratepayerprotectionclaimsnotindependentlegalfinding;SB259textnotinspectedhere.60decibelsnotexplicitAweighting/timebasisoractualmeasurement. Olympic-poolcomparisonnotnumericverifiedwaterconsumption. Noon-siteinspection,approvalorenergizationconfirmed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.okmulgeefluidstack.io/",
          "host": "okmulgeefluidstack.io",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.64659,
        "lng": -95.96425,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Fluidstack Okmulgee forecast, tenant claim and voluntary commitments",
          "fields": {
            "developer": "Fluidstack",
            "locality": "Okmulgee County, Oklahoma",
            "first_phase_service_target": "2027-09",
            "final_phase_service_target": "2028-09",
            "developer_named_first_tenant": "Jane Street",
            "joint_education_commitment_usd": 7000000,
            "developer_claims_no_local_property_tax_incentives_sought": true,
            "operator_named_power_provider": "AEP-PSO",
            "voluntary_boundary_noise_limit_db": 60
          },
          "notes": [
            "7McommitmentnotactualpaymentorsignedCBAschedule. No executedtenantleaseorMWread. Statutorycompliance/ratepayerprotectionclaimsnotindependentlegalfinding;SB259textnotinspectedhere.60decibelsnotexplicitAweighting/timebasisoractualmeasurement. Olympic-poolcomparisonnotnumericverifiedwaterconsumption. Noon-siteinspection,approvalorenergizationconfirmed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.okmulgeefluidstack.io/",
              "host": "okmulgeefluidstack.io",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 76",
          "scope": "The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_named_okmulgee_future_development",
              "scope": "The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted."
            },
            "source_read_scope": {
              "complete_original_project_page_body_read": true,
              "years2027_and2028_forecasts_not_accomplished": true,
              "developer_compliance_assertions_not_independent_legal_finding": true,
              "no_resource_or_capacity_fields_changed": true
            }
          },
          "notes": [
            "The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.okmulgeefluidstack.io/",
              "host": "www.okmulgeefluidstack.io",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Okmulgee · Okmulgee · Source context reviewed",
      "status_scope": "The complete original named project page describes a computing campus being developed and targets its first operating phase in September 2027 and final phase in September 2028. This supports a company listed proposal without independently verified construction or operation. Prospective tenant descriptions, cooling commitments, voluntary sound limits, ratepayer promises and asserted statutory compliance are attributed project claims rather than measured performance or a verified legal determination. No technical quantities, investment, tenant roles or resource findings are adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "40111"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
