{
  "schema_version": 1,
  "source_compilation_context": {
    "ok": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ok.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "40131",
    "label": "Rogers County, Oklahoma"
  },
  "records": [
    {
      "id": "beale-project-mustang-claremore-ok",
      "state": "ok",
      "kind": "facility",
      "name": "Project Mustang",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rogers"
      ],
      "city": "Claremore",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Noformalcommitment, approval, landclosing or executedutilitycontract established. CityofClaremore/GRDA supplydescription is anticipatedarrangement, not verifiedreservedcapacity. Air-coolingclaim is design, not zeroactualwater certification. Clydesdale 1 billion/506 acres, CowetaAtlas andotherBealeprojects are distinct; nofigures transferredtoMustang. January 26 update is not a newpermit/actiondate. NoMWorcurrentRFSadopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://constructionreviewonline.com/beale-infrastructure-in-talks-to-build-project-mustang-data-center-campus-outside-tulsa-oklahoma/",
          "host": "constructionreviewonline.com",
          "date": "2026-01-06",
          "published": "2026-01-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://bealeinfra.com/location/claremore/",
          "host": "bealeinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 36.37159,
        "lng": -95.60426,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "ConstructionReview reports Beale’s preliminary ProjectMustang discussions and due diligence for ClaremoreIndustrialPark, with numberofbuildingsundisclosed andfirst-phase 2028 target.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Noformalcommitment, approval, landclosing or executedutilitycontract established. CityofClaremore/GRDA supplydescription is anticipatedarrangement, not verifiedreservedcapacity. Air-coolingclaim is design, not zeroactualwater certification. Clydesdale 1 billion/506 acres, CowetaAtlas andotherBealeprojects are distinct; nofigures transferredtoMustang. January 26 update is not a newpermit/actiondate. NoMWorcurrentRFSadopted.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://constructionreviewonline.com/beale-infrastructure-in-talks-to-build-project-mustang-data-center-campus-outside-tulsa-oklahoma/",
              "host": "constructionreviewonline.com",
              "date": "2026-01-06",
              "published": "2026-01-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 76",
          "scope": "The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_named_claremore_planned_campus",
              "scope": "The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred."
            },
            "source_read_scope": {
              "complete_original_claremore_project_page_body_read": true,
              "seasonal2026_start_target_not_accomplished_construction": true,
              "unnamed_customer_not_inferred": true,
              "no_incentive_or_workforce_pledge_as_operation": true,
              "no_location_role_capacity_or_resource_changes": true
            }
          },
          "notes": [
            "The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://bealeinfra.com/location/claremore/",
              "host": "bealeinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Claremore · Rogers · Source context reviewed",
      "status_scope": "The complete original developer page identifies the planned Claremore campus and a future phase program. This supports a company listed proposal at the named developer campus scope. Its seasonal Fall 2026 construction timeline does not independently establish that work began, and no exact construction day is invented. Prospective completion, incentive approvals, workforce partnerships and mitigation claims are not commissioned computing, delivered benefits or measured compliance. The unnamed computing customer is not inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "40131"
      }
    },
    {
      "id": "potentia-oklahoma-campus-02-inola-ok",
      "state": "ok",
      "kind": "facility",
      "name": "Potentia Oklahoma Campus 02 (Inola)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rogers"
      ],
      "city": "Inola",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Current Rocky Point master-development website; limited project context.. Developer presents an 1800-plus-acre, multi-industry industrial park near Inola in Rogers County. Home page alone does not identify a named data-center tenant, 2000 MW contract, data-hall completion date or physical campus boundary. Connection of Rocky Point to Potentia is attributed to the original resident reporting below, not independently inspected company registrations or deeds. Limited context, not full technical or current operating verification. Developer role and infrastructure intentions.. Developer distinguishes land acquisition, entitlements and shared infrastructure from independently operated tenant buildings; tenant announcements remain prospective. Computing and digital infrastructure are among possible advanced-technology uses, alongside manufacturing and logistics. Grid redundancy, water availability and developer/tenant funding are planned representations, not inspected service agreements, certified capacities or independently measured protection of household rates. Disclaimer expressly treats figures as preliminary and nonbinding. Developer FAQ, not an enacted-law or final-zoning inspection.. Developer says land is zoned for moderate industrial, commercial and mixed use, and says the master developer seeks no abatements, PILOTs or ad valorem exemptions. Future tenant incentives are separately possible; this is not proof of no public subsidy anywhere in the park. FAQ asserts Oklahoma HB2992 requires tenants at or above 75 MW to fund grid upgrades. Underlying enacted text and PSO agreements not inspected in this pass; no legal conclusion or universal rate guarantee adopted. Noise/lighting controls and water-supply commitments are intended standards, not measurements or inspected permits. No exact public hearing date found in these pages.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://rockypointpark.org/",
          "host": "rockypointpark.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://rockypointpark.org/industrial-park.html",
          "host": "rockypointpark.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://rockypointpark.org/transparency.html",
          "host": "rockypointpark.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.38804,
        "lng": -95.62223,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json",
          "scope": "Current Rocky Point master-development website; limited project context.",
          "fields": {},
          "notes": [
            "Developer presents an 1800-plus-acre, multi-industry industrial park near Inola in Rogers County. Home page alone does not identify a named data-center tenant, 2000 MW contract, data-hall completion date or physical campus boundary.",
            "Connection of Rocky Point to Potentia is attributed to the original resident reporting below, not independently inspected company registrations or deeds.",
            "Limited context, not full technical or current operating verification."
          ],
          "sources": [
            {
              "url": "https://rockypointpark.org/",
              "host": "rockypointpark.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json",
          "scope": "Developer role and infrastructure intentions.",
          "fields": {},
          "notes": [
            "Developer distinguishes land acquisition, entitlements and shared infrastructure from independently operated tenant buildings; tenant announcements remain prospective. Computing and digital infrastructure are among possible advanced-technology uses, alongside manufacturing and logistics.",
            "Grid redundancy, water availability and developer/tenant funding are planned representations, not inspected service agreements, certified capacities or independently measured protection of household rates. Disclaimer expressly treats figures as preliminary and nonbinding.",
            "Limited context, not full technical or current operating verification."
          ],
          "sources": [
            {
              "url": "https://rockypointpark.org/industrial-park.html",
              "host": "rockypointpark.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-campus-totals-parcel-scope-and-developer-roles-round89-2026-10-15.json",
          "scope": "Developer FAQ, not an enacted-law or final-zoning inspection.",
          "fields": {},
          "notes": [
            "Developer says land is zoned for moderate industrial, commercial and mixed use, and says the master developer seeks no abatements, PILOTs or ad valorem exemptions. Future tenant incentives are separately possible; this is not proof of no public subsidy anywhere in the park.",
            "FAQ asserts Oklahoma HB2992 requires tenants at or above 75 MW to fund grid upgrades. Underlying enacted text and PSO agreements not inspected in this pass; no legal conclusion or universal rate guarantee adopted.",
            "Noise/lighting controls and water-supply commitments are intended standards, not measurements or inspected permits. No exact public hearing date found in these pages.",
            "Limited context, not full technical or current operating verification."
          ],
          "sources": [
            {
              "url": "https://rockypointpark.org/transparency.html",
              "host": "rockypointpark.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Inola · Rogers · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "40131"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
