{
  "schema_version": 1,
  "source_compilation_context": {
    "ok": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ok.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "40145",
    "label": "Wagoner County, Oklahoma"
  },
  "records": [
    {
      "id": "beale-project-atlas-coweta-ok",
      "state": "ok",
      "kind": "facility",
      "name": "Project Atlas at Coweta",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Wagoner"
      ],
      "city": "Coweta",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Report is secondary commentary, not originalwithdrawalletter or finalcourt/permitrecord.270 acres is Atlasproposal, notIRENcampus. IREN 2000 acres/50 billion/1.2 GWandChildress 750 MW/Sweetwater 1.4 GWare otherprojects withdifferentgeneration/load/energizationstages. HB 2992/SB 259 legalstatusandscope are not independently reviewed here. Author’s single-week framing spansweeks/months, and no actualweek,lawdate,watercontractoutcomeorassetvaluationinferenceadopted. NoAtlascriticalIT/ESA/currentbuildverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-20",
          "The original Coweta City March 20, 2026 notice publishes procedures for a scheduled April 6 Project Atlas hearing. This dates publication of the procedures rather than an accomplished hearing, vote, approval or physical stage. The December 2025 newsletter supplies no exact publication day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers",
          "host": "infrathesis.substack.com",
          "date": "2026-05-30",
          "published": "2026-05-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.cityofcoweta-ok.gov/ArchiveCenter/ViewFile/Item/1158",
          "host": "www.cityofcoweta-ok.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816",
          "host": "www.cityofcoweta-ok.gov",
          "published": "2026-03-20",
          "date": "2026-03-20",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 35.96155,
        "lng": -95.52118,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "InfraThesis investment commentary reports Beale withdrew CowetaProjectAtlas onMarch 30 after opposition, while primarily arguing implications forIREN’sseparateOklahoma/Texasportfolio.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Report is secondary commentary, not originalwithdrawalletter or finalcourt/permitrecord.270 acres is Atlasproposal, notIRENcampus. IREN 2000 acres/50 billion/1.2 GWandChildress 750 MW/Sweetwater 1.4 GWare otherprojects withdifferentgeneration/load/energizationstages. HB 2992/SB 259 legalstatusandscope are not independently reviewed here. Author’s single-week framing spansweeks/months, and no actualweek,lawdate,watercontractoutcomeorassetvaluationinferenceadopted. NoAtlascriticalIT/ESA/currentbuildverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers",
              "host": "infrathesis.substack.com",
              "date": "2026-05-30",
              "published": "2026-05-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-F1-label-review-2026-10-20",
          "scope": "InfraThesis investment commentary describes a Project Atlas withdrawal while discussing a different IREN project. This pass does not adopt that commentary as an independently verified current application outcome. Exact original company or city confirmation remains a separate lead.",
          "fields": {
            "identity_label_context": {
              "previous_name": "Project Atlas (Coweta)  -  withdrawn",
              "plain_name": "Project Atlas at Coweta",
              "interpretation": "InfraThesis investment commentary describes a Project Atlas withdrawal while discussing a different IREN project. This pass does not adopt that commentary as an independently verified current application outcome. Exact original company or city confirmation remains a separate lead.",
              "outcome_wording_is_not_identity": true
            }
          },
          "notes": [
            "InfraThesis investment commentary describes a Project Atlas withdrawal while discussing a different IREN project. This pass does not adopt that commentary as an independently verified current application outcome. Exact original company or city confirmation remains a separate lead.",
            "Inherited inventory name: Project Atlas (Coweta)  -  withdrawn. The wording is retained as provenance, not as an independently verified outcome.",
            "An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."
          ],
          "sources": [
            {
              "url": "https://infrathesis.substack.com/p/oklahoma-is-walling-off-data-centers",
              "host": "infrathesis.substack.com",
              "published": "2026-05-30",
              "date": "2026-05-30",
              "checked": "2026-10-20",
              "label": "The Infrastructure Thesis"
            }
          ],
          "checked": "2026-10-20",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 76",
          "scope": "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_city_named_coweta_atlas_proposal",
              "scope": "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm."
            },
            "source_read_scope": {
              "original_newsletter_selected_physical_page3_text_read": true,
              "complete_original_march20_speaker_procedure_body_read": true,
              "historical_schedule_not_actual_hearing_or_vote": true,
              "original_project_page404_not_replaced": true,
              "no_month_only_date_as_exact_event": true
            }
          },
          "notes": [
            "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.cityofcoweta-ok.gov/ArchiveCenter/ViewFile/Item/1158",
              "host": "www.cityofcoweta-ok.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816",
              "host": "www.cityofcoweta-ok.gov",
              "published": "2026-03-20",
              "date": "2026-03-20",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Coweta · Wagoner · Source context reviewed",
      "status_scope": "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm.",
      "event_evidence": [
        {
          "date": "2026-03-20",
          "text": "The original Coweta City March 20, 2026 notice publishes procedures for a scheduled April 6 Project Atlas hearing. This dates publication of the procedures rather than an accomplished hearing, vote, approval or physical stage. The December 2025 newsletter supplies no exact publication day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816",
              "host": "www.cityofcoweta-ok.gov",
              "published": "2026-03-20",
              "date": "2026-03-20",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "40145"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
