{
  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42007",
    "label": "Beaver County, Pennsylvania"
  },
  "records": [
    {
      "id": "aligned-shippingport-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Shippingport Industrial Park",
      "group": "proposed",
      "status": "Permit review underway",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Beaver"
      ],
      "city": "Shippingport",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Shippingport guest opinion source-role correction. Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-09-10",
          "Aligned published its Project Phoenix Shippingport groundbreaking announcement September 10, 2026. This records the dated company announcement and ceremony account, not independent verification of excavation, completion of planned blasting or operating data center service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://community.triblive.com/news/3990268",
          "host": "community.triblive.com",
          "date": "2026-02-26",
          "published": "2026-02-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/",
          "host": "aligneddc.com",
          "published": "2026-09-10",
          "date": "2026-09-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://aligneddc.com/shippingport-pa-data-center/",
          "host": "aligneddc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.68235,
        "lng": -80.34949,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Shippingport guest opinion source-role correction",
          "fields": {
            "publisher_role": "guest opinion by EnvironmentalHealthProject communications manager",
            "reported_project_location": "nearformerBruceMansfieldplant, Shippingport, BeaverCounty, Pennsylvania",
            "reported_proposed_buildings_max": 3,
            "reported_each_building_sqft_min_exclusive": 600000,
            "reported_components": [
              "data centers",
              "warehouse",
              "natural-gas generation pad"
            ]
          },
          "notes": [
            "Opinionarticleisnotagencyapproval/order. Claimedthreeapprovals requireoriginalpermitinspection; no adopteddate/powerbasisfromopinion. Generalhealthrisksnotproofsite-specificillness,airviolation oractualbills. No exactAlignedoperatorcrosswalk,currentcommissioning orcriticalITMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://community.triblive.com/news/3990268",
              "host": "community.triblive.com",
              "date": "2026-02-26",
              "published": "2026-02-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 28",
          "scope": "DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_shippingport_phase_permit_review_and_company_schedule_not_accomplished_work",
              "scope": "DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes."
            },
            "tracker_scope": {
              "project_ids": [
                "10000014",
                "10000068"
              ],
              "different_phases_not_collapsed": true,
              "future_or_passed_schedule_not_accomplished_work": true
            }
          },
          "notes": [
            "DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/",
              "host": "aligneddc.com",
              "published": "2026-09-10",
              "date": "2026-09-10",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://aligneddc.com/shippingport-pa-data-center/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Shippingport · Beaver · Source context reviewed",
      "status_scope": "DEP original project CSV separately lists Aligned Shippingport Phase 1 and Phase 2 under permit review. The company September 10, 2026 release announces a groundbreaking, while its current construction update provides a rescheduled blasting look ahead. Permit review underway describes that documented regulatory stage for the new campus proposals. The ceremony and passed forecast dates do not independently verify actual excavation, completion of any listed blast, delivered power or operating service. Two tracker phases are not merged into a claim that every campus building has the same physical status. Advertised water, power and community benefits are not measured outcomes.",
      "event_evidence": [
        {
          "date": "2026-09-10",
          "text": "Aligned published its Project Phoenix Shippingport groundbreaking announcement September 10, 2026. This records the dated company announcement and ceremony account, not independent verification of excavation, completion of planned blasting or operating data center service.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/",
              "host": "aligneddc.com",
              "published": "2026-09-10",
              "date": "2026-09-10",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42007"
      }
    },
    {
      "id": "switch-big-beaver-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Big Beaver Campus",
      "group": "proposed",
      "status": "Project listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Beaver"
      ],
      "city": "Big Beaver",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-30",
          "Switch published its Big Beaver Borough campus development announcement April 30, 2026. The release describes planned facilities and company commitments, not completed construction or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/",
          "host": "switch.com",
          "date": "2026-04-30",
          "published": "2026-04-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.69498,
        "lng": -80.36328,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "development_announcement_date": "2026-04-30",
            "planned_campus_acres": 382,
            "published_municipality": "Big Beaver Borough",
            "published_county": "Beaver, Pennsylvania"
          },
          "notes": [
            "Planned development, no site MW, capital amount or opening date supplied. Zero server-cooling water explicitly allows office/warehouse water connection. Ratepayer protection statement not independent tariff review.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/",
              "host": "switch.com",
              "date": "2026-04-30",
              "published": "2026-04-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 27",
          "scope": "Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_company_development_announcement_not_construction_or_operation",
              "scope": "Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted."
            }
          },
          "notes": [
            "Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/",
              "host": "www.switch.com",
              "published": "2026-04-30",
              "date": "2026-04-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Big Beaver · Beaver · Source context reviewed",
      "status_scope": "Switch April 30, 2026 announcement describes plans to develop the named Big Beaver Borough campus in Beaver County. Proposed records that company development announcement. Existing Switch Prime campuses elsewhere do not establish operation here. Funding, cooling designs, future environmental benefits and local partnership commitments are company statements, not independently verified outcomes or current construction. No forecast quantities, role or location fields are promoted.",
      "event_evidence": [
        {
          "date": "2026-04-30",
          "text": "Switch published its Big Beaver Borough campus development announcement April 30, 2026. The release describes planned facilities and company commitments, not completed construction or operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/",
              "host": "www.switch.com",
              "published": "2026-04-30",
              "date": "2026-04-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42007"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
