{
  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42025",
    "label": "Carbon County, Pennsylvania"
  },
  "records": [
    {
      "id": "bitfarms-panther-creek-nesquehoning-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Panther Creek Plant",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Carbon"
      ],
      "city": "Nesquehoning",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results",
          "host": "ir.keelinfra.com",
          "date": "2026-05-11",
          "published": "2026-05-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
          "host": "ir.keelinfra.com",
          "published": "2026-08-10",
          "date": "2026-08-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.91816,
        "lng": -75.70891,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Campus-level issuer context, not proof every imported plant/building ID is independently energized.",
          "fields": {
            "announcement_date": "2026-05-11",
            "quarter_ended": "2026-03-31",
            "company_claim": "Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.",
            "redomiciliation_parent_transaction_date": "2026-04-01"
          },
          "notes": [
            "Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results",
              "host": "ir.keelinfra.com",
              "date": "2026-05-11",
              "published": "2026-05-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 27",
          "scope": "Keel second quarter results report decommissioning all United States Bitcoin mining operations in preparation for future HPC construction and conditional land development approval for the Panther Creek development. The inherited Panther Creek Plant record is not merged with the separate HPC campus record. Mining decommissioning does not establish physical closure of a power generating plant, and company aggregate legacy revenues do not prove this component current operation. Exact current component phase and the generating plant relationship remain unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_mining_decommissioning_not_generating_plant_shutdown_or_new_hpc_operation",
              "scope": "Keel second quarter results report decommissioning all United States Bitcoin mining operations in preparation for future HPC construction and conditional land development approval for the Panther Creek development. The inherited Panther Creek Plant record is not merged with the separate HPC campus record. Mining decommissioning does not establish physical closure of a power generating plant, and company aggregate legacy revenues do not prove this component current operation. Exact current component phase and the generating plant relationship remain unclear."
            }
          },
          "notes": [
            "Keel second quarter results report decommissioning all United States Bitcoin mining operations in preparation for future HPC construction and conditional land development approval for the Panther Creek development. The inherited Panther Creek Plant record is not merged with the separate HPC campus record. Mining decommissioning does not establish physical closure of a power generating plant, and company aggregate legacy revenues do not prove this component current operation. Exact current component phase and the generating plant relationship remain unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results",
              "host": "ir.keelinfra.com",
              "published": "2026-05-11",
              "date": "2026-05-11",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
              "host": "ir.keelinfra.com",
              "published": "2026-08-10",
              "date": "2026-08-10",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Nesquehoning · Carbon · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42025"
      }
    },
    {
      "id": "panther-creek-hpc-ai-campus-nesquehoning-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Panther Creek HPC/AI Data Center Campus",
      "group": "approved",
      "status": "Reported land use approval",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Carbon"
      ],
      "city": "Nesquehoning",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Campus-level issuer context, not proof every imported plant/building ID is independently energized.. Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-08-10",
          "Keel published its second quarter development update August 10, 2026, reporting Panther Creek land use approvals and separately discussing mining decommissioning and future HPC construction. The publication does not supply an exact approval day or HPC commissioning date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results",
          "host": "ir.keelinfra.com",
          "date": "2026-05-11",
          "published": "2026-05-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
          "host": "ir.keelinfra.com",
          "published": "2026-08-10",
          "date": "2026-08-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.93162,
        "lng": -75.72361,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Campus-level issuer context, not proof every imported plant/building ID is independently energized.",
          "fields": {
            "announcement_date": "2026-05-11",
            "quarter_ended": "2026-03-31",
            "company_claim": "Zoning obtained for Panther Creek, Sharon and Moses Lake; environmental/land-development permits still progressing.",
            "redomiciliation_parent_transaction_date": "2026-04-01"
          },
          "notes": [
            "Two Panther Creek base labels can describe overlapping plant/campus history, not two independently established physical campuses. No site-by-site new lease or permit outcome inferred from fleet financial disclosure.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results",
              "host": "ir.keelinfra.com",
              "date": "2026-05-11",
              "published": "2026-05-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 27",
          "scope": "Keel August 10, 2026 second quarter results explicitly identify Panther Creek among its development sites. The company expressly qualifies Panther Creek land development approval as conditional. Reported land use approval is limited to that company account. Environmental permit applications are still described as progressing. Company decommissioning of United States Bitcoin mining operations is separate from future HPC construction, customer leases and commissioned HPC service. Neither equipment delivery to another site nor aggregate legacy revenues establishes operation of this HPC proposal. Existing identity, crypto classification, roles and quantities remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_reported_named_land_use_approval_not_hpc_operation",
              "scope": "Keel August 10, 2026 second quarter results explicitly identify Panther Creek among its development sites. The company expressly qualifies Panther Creek land development approval as conditional. Reported land use approval is limited to that company account. Environmental permit applications are still described as progressing. Company decommissioning of United States Bitcoin mining operations is separate from future HPC construction, customer leases and commissioned HPC service. Neither equipment delivery to another site nor aggregate legacy revenues establishes operation of this HPC proposal. Existing identity, crypto classification, roles and quantities remain unchanged."
            }
          },
          "notes": [
            "Keel August 10, 2026 second quarter results explicitly identify Panther Creek among its development sites. The company expressly qualifies Panther Creek land development approval as conditional. Reported land use approval is limited to that company account. Environmental permit applications are still described as progressing. Company decommissioning of United States Bitcoin mining operations is separate from future HPC construction, customer leases and commissioned HPC service. Neither equipment delivery to another site nor aggregate legacy revenues establishes operation of this HPC proposal. Existing identity, crypto classification, roles and quantities remain unchanged.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-first-quarter-2026-results",
              "host": "ir.keelinfra.com",
              "published": "2026-05-11",
              "date": "2026-05-11",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
              "host": "ir.keelinfra.com",
              "published": "2026-08-10",
              "date": "2026-08-10",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Nesquehoning · Carbon · Source context reviewed",
      "status_scope": "Keel August 10, 2026 second quarter results explicitly identify Panther Creek among its development sites. The company expressly qualifies Panther Creek land development approval as conditional. Reported land use approval is limited to that company account. Environmental permit applications are still described as progressing. Company decommissioning of United States Bitcoin mining operations is separate from future HPC construction, customer leases and commissioned HPC service. Neither equipment delivery to another site nor aggregate legacy revenues establishes operation of this HPC proposal. Existing identity, crypto classification, roles and quantities remain unchanged.",
      "event_evidence": [
        {
          "date": "2026-08-10",
          "text": "Keel published its second quarter development update August 10, 2026, reporting Panther Creek land use approvals and separately discussing mining decommissioning and future HPC construction. The publication does not supply an exact approval day or HPC commissioning date.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
              "host": "ir.keelinfra.com",
              "published": "2026-08-10",
              "date": "2026-08-10",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42025"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
