{
  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42029",
    "label": "Chester County, Pennsylvania"
  },
  "records": [
    {
      "id": "sentinel-east-whiteland-chester-county-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Sentinel East Whiteland Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chester"
      ],
      "city": "East Whiteland Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Brooke Schultz, Inquirer June 11, 2026 original court/developer reporting: two appeals over East Whiteland 2018 zoning and 2024 plans quashed as untimely/nonappealable; not a merits finding of no environmental risk or every permit approved. Original orders/case numbers not inspected. 1.5 million square feet is a proposal; former attempt to add 600,000 square feet was abandoned, not additive current floor space. Stormwater work in adjacent West Whiteland and perimeter work do not establish all building construction complete. July 30 follow-up source 27 changes the work-stage narrative. Not all fields, current operation, precise parcel or critical IT independently certified. Brooke Schultz, Inquirer July 30, 2026 original township/developer interviews: work RESUMED Wednesday July 29 (calendar inference), following a temporary July stop. Township erosion/sedimentation permit allows EARTHMOVING with monitoring/dust/remedy conditions; footing/foundation construction permits still needed. No blanket all-construction approval. Possible redesign from 1.5 million to 536,000 square feet and lower-water air chillers was TABLED July 8; August 19 future meeting, not an adopted redesign/outcome. 3 million gallons/day belongs to the earlier water-cooled design, not measured current use or final new design. No implication Superfund cleanup or health impacts independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html",
          "host": "inquirer.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-project-20260730.html",
          "host": "inquirer.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.97312,
        "lng": -75.74824,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Brooke Schultz, Inquirer June 11, 2026 original court/developer reporting: two appeals over East Whiteland 2018 zoning and 2024 plans quashed as untimely/nonappealable; not a merits finding of no environmental risk or every permit approved. Original orders/case numbers not inspected. 1.5 million square feet is a proposal; former attempt to add 600,000 square feet was abandoned, not additive current floor space. Stormwater work in adjacent West Whiteland and perimeter work do not establish all building construction complete. July 30 follow-up source 27 changes the work-stage narrative.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html",
              "host": "inquirer.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Brooke Schultz, Inquirer July 30, 2026 original township/developer interviews: work RESUMED Wednesday July 29 (calendar inference), following a temporary July stop. Township erosion/sedimentation permit allows EARTHMOVING with monitoring/dust/remedy conditions; footing/foundation construction permits still needed. No blanket all-construction approval. Possible redesign from 1.5 million to 536,000 square feet and lower-water air chillers was TABLED July 8; August 19 future meeting, not an adopted redesign/outcome. 3 million gallons/day belongs to the earlier water-cooled design, not measured current use or final new design. No implication Superfund cleanup or health impacts independently certified.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-project-20260730.html",
              "host": "inquirer.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "DEP lists Project Forge and Sentinel Green Fig under permit review, but that regulatory listing does not resolve the separately reported current zoning litigation or local entitlement. A captured primary current court disposition was not obtained. An older Superior Court mechanics lien opinion concerns a different issue and is not substituted. Current exact project stage remains unclear. No identity, jurisdiction, provider role, status or location change is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "combined_or_different_project_row_or_current_legal_outcome_held",
              "scope": "DEP lists Project Forge and Sentinel Green Fig under permit review, but that regulatory listing does not resolve the separately reported current zoning litigation or local entitlement. A captured primary current court disposition was not obtained. An older Superior Court mechanics lien opinion concerns a different issue and is not substituted. Current exact project stage remains unclear. No identity, jurisdiction, provider role, status or location change is adopted."
            }
          },
          "notes": [
            "DEP lists Project Forge and Sentinel Green Fig under permit review, but that regulatory listing does not resolve the separately reported current zoning litigation or local entitlement. A captured primary current court disposition was not obtained. An older Superior Court mechanics lien opinion concerns a different issue and is not substituted. Current exact project stage remains unclear. No identity, jurisdiction, provider role, status or location change is adopted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Whiteland Township · Chester · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42029"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
