{
  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42069",
    "label": "Lackawanna County, Pennsylvania"
  },
  "records": [
    {
      "id": "archbald-i-campus-1-eynon-jermyn-road-lackawanna-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Archbald I Campus 1 Data Center (Eynon Jermyn Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Archbald",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html",
          "host": "yahoo.com",
          "date": "2025-11-01",
          "published": "2025-11-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.43639,
        "lng": -75.60926,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "TheTimes-Tribune viaYahoo describes ArchbaldILLCOctober 22 applications for two distinct campuses:18 buildings onroughly 408 acres andfourbuildings onroughly 66 acres, with corporate/end-user identity undisclosed.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html",
              "host": "yahoo.com",
              "date": "2025-11-01",
              "published": "2025-11-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "The DEP combined Archbald I and Archbald II row does not separate the two inherited campus components or their precise current physical phases. Its broad proposal classification is not assigned to each individual campus as a verified phase. No identity, jurisdiction, provider role, status or location change is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "combined_or_different_project_row_or_current_legal_outcome_held",
              "scope": "The DEP combined Archbald I and Archbald II row does not separate the two inherited campus components or their precise current physical phases. Its broad proposal classification is not assigned to each individual campus as a verified phase. No identity, jurisdiction, provider role, status or location change is adopted."
            }
          },
          "notes": [
            "The DEP combined Archbald I and Archbald II row does not separate the two inherited campus components or their precise current physical phases. Its broad proposal classification is not assigned to each individual campus as a verified phase. No identity, jurisdiction, provider role, status or location change is adopted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Archbald · Lackawanna · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    },
    {
      "id": "archbald-i-campus-2-washington-avenue-lackawanna-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Archbald I Campus 2 Data Center (Eynon Jermyn Road at Washington Avenue)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Archbald",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. 22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html",
          "host": "yahoo.com",
          "date": "2025-11-01",
          "published": "2025-11-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.44969,
        "lng": -75.62378,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "TheTimes-Tribune viaYahoo describes ArchbaldILLCOctober 22 applications for two distinct campuses:18 buildings onroughly 408 acres andfourbuildings onroughly 66 acres, with corporate/end-user identity undisclosed.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "22 buildings are not 22 campuses.150,000 squarefeet each is FOOTPRINT, not multi-story grossfloor area;7 million/1.5 millionimpervious areas include roads/parking, not datahallspace. Principally permitted zoning use is not an issued site/buildingpermit or executedutilityagreement. ProposedOctoberordinance failed to receive a second and was NOTadopted; its 120 acre/230 kV/height/setback/generationconditions are draft, not applicable law. Registered-agent address cannot identify operator. ProjectGravity, Boson, WildcatRidge and withdrawnBlakely are separate. October 2025 application context is notOctober 2026 event. Project/zoning sections personally read; no whole-recordcertification or exactcurrentoperatingstatus.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yahoo.com/news/articles/developer-applies-22-more-data-035900249.html",
              "host": "yahoo.com",
              "date": "2025-11-01",
              "published": "2025-11-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "The DEP combined Archbald I and Archbald II row does not establish which application, building or current physical phase belongs to this second inherited campus. Another Archbald applicant is not substituted. No identity, jurisdiction, provider role, status or location change is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "combined_or_different_project_row_or_current_legal_outcome_held",
              "scope": "The DEP combined Archbald I and Archbald II row does not establish which application, building or current physical phase belongs to this second inherited campus. Another Archbald applicant is not substituted. No identity, jurisdiction, provider role, status or location change is adopted."
            }
          },
          "notes": [
            "The DEP combined Archbald I and Archbald II row does not establish which application, building or current physical phase belongs to this second inherited campus. Another Archbald applicant is not substituted. No identity, jurisdiction, provider role, status or location change is adopted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Archbald · Lackawanna · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    },
    {
      "id": "blakely-borough-data-center-lackawanna-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Blakely Borough Data Center",
      "group": "stopped",
      "status": "Reported rezoning application withdrawn",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Blakely",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Proposed land clearing/storage remained disputed; withdrawal does not resolve legality of other uses or imply all activity ceased. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds",
          "host": "fox56.com",
          "date": "2025-09-15",
          "published": "2025-09-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.40865,
        "lng": -75.60683,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "WOLF reports Blakely rezoning application withdrawal and cancelled hearing; developer said data center no longer moving ahead.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Proposed land clearing/storage remained disputed; withdrawal does not resolve legality of other uses or imply all activity ceased.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds",
              "host": "fox56.com",
              "date": "2025-09-15",
              "published": "2025-09-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-F1-label-review-2026-10-20",
          "scope": "WOLF reports withdrawal of the Blakely Borough rezoning application in September 2025 and reproduces the developer's statement that the data center project is not moving forward. The separate dispute about other site work and storage is not a completed data center or a resolved legal outcome.",
          "fields": {
            "identity_label_context": {
              "previous_name": "Blakely Borough Data Center (withdrawn)",
              "plain_name": "Blakely Borough Data Center",
              "interpretation": "WOLF reports withdrawal of the Blakely Borough rezoning application in September 2025 and reproduces the developer's statement that the data center project is not moving forward. The separate dispute about other site work and storage is not a completed data center or a resolved legal outcome.",
              "outcome_wording_is_not_identity": true
            },
            "current_stage_evidence": {
              "outcome": "reported_rezoning_application_withdrawn",
              "scope": "WOLF reports withdrawal of the Blakely Borough rezoning application in September 2025 and reproduces the developer's statement that the data center project is not moving forward. The separate dispute about other site work and storage is not a completed data center or a resolved legal outcome."
            }
          },
          "notes": [
            "WOLF reports withdrawal of the Blakely Borough rezoning application in September 2025 and reproduces the developer's statement that the data center project is not moving forward. The separate dispute about other site work and storage is not a completed data center or a resolved legal outcome.",
            "Inherited inventory name: Blakely Borough Data Center (withdrawn). The wording is retained as provenance, not as an independently verified outcome.",
            "An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."
          ],
          "sources": [
            {
              "url": "https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds",
              "host": "fox56.com",
              "published": "2025-09-15",
              "date": "2025-09-15",
              "checked": "2026-10-20",
              "label": "WOLF"
            }
          ],
          "checked": "2026-10-20",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Blakely · Lackawanna · Source context reviewed",
      "status_scope": "WOLF reports withdrawal of the Blakely Borough rezoning application in September 2025 and reproduces the developer's statement that the data center project is not moving forward. The separate dispute about other site work and storage is not a completed data center or a resolved legal outcome.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    },
    {
      "id": "gouldsboro-project-gold-clifton-covington-lackawanna-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Gouldsboro Data Center Campus (Project Gold)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Clifton Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification. Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt. 65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation",
          "host": "wvia.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.46345,
        "lng": -75.58851,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-original-transactions-and-legal-stage-review-round73-2026-10-15.json",
          "scope": "Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.",
          "fields": {},
          "notes": [
            "WVIA KatBolus January3,2026 original report of Cliftonsettlement approvedpreviousFriday describes1778RichPikeLLCProjectGold. SettlementgovernsZONINGonly; land-developmentstudies/approvals remain and solicitor saysitdoesNOTendunderlyingzoninglitigation. Residents' promisedlawsuit isnot filedcase/ruling. Jan2vote date isdated-articleweekdayinference,notoriginalminutesverification.",
            "Atleastsevenpropertiesbroaderproject vsTHREECliftonpropertiesinsettlement,390acres+144reportedpropertyscopes notallbuildableDCfootprint. Equitableownership isnotverifieddeedclosing. Fivebuildings/threeCliftonsubcampuses notnewindependentcompanypins.65ftbuilding+15ftequipment=80fttotal limits,85ftwatertanks separate;100ftparcel/400fthomes setbacks proposedconditionsnotasbuilt.",
            "65/55dBAreportedday/night limits are two-decibel reductions from67/57, not2%lessnoise ormeasuredcompliance. No privatewellCOOLING whilewellDRINKINGallowed doesnotmeanzerogroundwater. Offsitewastewater/nuclear-gasabandonmentconditions on southeastcampus notstatewideenergyban. Covingtondifferentjurisdiction; proposedNDAenduserunnamed. Exactexecutedsettlement/currentcourtoutcome unread.",
            "Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."
          ],
          "sources": [
            {
              "url": "https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation",
              "host": "wvia.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "exact_named_dep_proposal_account_not_physical_commissioning",
              "scope": "The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."
            },
            "tracker_scope": {
              "project_id": "10000031",
              "original_project_and_related_permit_csv_read": true,
              "no_data_center_operation_inferred": true,
              "no_coordinate_or_role_promotion": true
            }
          },
          "notes": [
            "The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Clifton Township · Lackawanna · Source context reviewed",
      "status_scope": "The DEP row explicitly identifies Gouldsboro and Project Gold in Clifton and Covington. Its proposal listing does not determine a separate settlement, zoning appeal or current entitlement. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    },
    {
      "id": "mudiita-ransom-township-lackawanna-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Mudiita Ransom Township Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Ransom Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is not a formal countywide denial or verified permanent abandonment. Scranton Materials' separate quarry overlay denial/appeal and a pumped-storage study are other proceedings. Mudiita's 930-plus-acre marketing and a smaller acquired land area are not reconciled. Property price is not DC capex; no current tenant, service agreement or approval is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus",
          "host": "wvia.org",
          "date": "2026-07-27",
          "published": "2026-07-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ransomtownshippa.gov/data-center-documents",
          "host": "ransomtownshippa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.42953,
        "lng": -75.64804,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WVIA reports uncertainty at Mudiita's Ransom Township property: a former shareholder says there are no present data-center plans, websites are down and current shareholders are unidentified.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "This is not a formal countywide denial or verified permanent abandonment. Scranton Materials' separate quarry overlay denial/appeal and a pumped-storage study are other proceedings. Mudiita's 930-plus-acre marketing and a smaller acquired land area are not reconciled. Property price is not DC capex; no current tenant, service agreement or approval is established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvia.org/news/local/2026-07-27/future-of-ransom-twp-property-uncertain-as-carbon-county-developer-says-no-plans-for-data-center-campus",
              "host": "wvia.org",
              "date": "2026-07-27",
              "published": "2026-07-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 64",
          "scope": "The complete original Township data center document index names Scranton Materials zoning and exhibit submissions. The index does not independently establish the exact inherited Mudiita property or legal identity, present computing stage or a current final outcome. Private accounts of a land purchase and lack of plans are not adopted. A separate Scranton Materials application, Township wide policy and Mudiita proposal are not merged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_ransom_index_exact_mudiita_crosswalk_held",
              "scope": "The complete original Township data center document index names Scranton Materials zoning and exhibit submissions. The index does not independently establish the exact inherited Mudiita property or legal identity, present computing stage or a current final outcome. Private accounts of a land purchase and lack of plans are not adopted. A separate Scranton Materials application, Township wide policy and Mudiita proposal are not merged."
            },
            "source_read_scope": {
              "complete_original_township_document_index_body_read": true,
              "linked_application_bodies_unread": true,
              "separate_scranton_materials_not_forced_mudiita": true
            }
          },
          "notes": [
            "The complete original Township data center document index names Scranton Materials zoning and exhibit submissions. The index does not independently establish the exact inherited Mudiita property or legal identity, present computing stage or a current final outcome. Private accounts of a land purchase and lack of plans are not adopted. A separate Scranton Materials application, Township wide policy and Mudiita proposal are not merged.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://ransomtownshippa.gov/data-center-documents",
              "host": "ransomtownshippa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ransom Township · Lackawanna · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    },
    {
      "id": "project-gravity-archbald-lackawanna-county-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Project Gravity",
      "group": "proposed",
      "status": "Permit review underway",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Archbald",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport. SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread. 360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [
        [
          "2025-12-22",
          "Pennsylvania DEP published its Project Gravity informational meeting notice December 22, 2025. The notice scheduled a January 6, 2026 meeting and a comment deadline. A past scheduled date does not establish that the meeting occurred or that permits were approved."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting",
          "host": "wvia.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county",
          "host": "www.pa.gov",
          "published": "2025-12-22",
          "date": "2025-12-22",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.41276,
        "lng": -75.57211,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "KatBolus WVIA January8,2026 originalDEPmeetingreport identifiesArchbald25ProjectGravity; developerNOtenantyet andwouldnotconstructwithoutone. Seven135000sftwo-storybuildings/186acres areoneproposedcampus, notsevennewfacilityIDs. TuesdayJanuary6meetingdateinferredfromdatedreport.",
            "SeptemberpreliminaryCONDITIONALplanningapproval differsfromfinalconstructionauthorization. Chapter105administrativelycomplete/technicalreview,Chapter102completenessreview,404pending; AIRAPPLICATIONNOTYETRECEIVEDperDEPatmeeting. Laterapproval/currenttenantstatusunknown. Underlyingapplications/minutesnotdirectlyread.",
            "360000gpd isdeveloperESTIMATE, utilityabilitytosupplynotapprovedwithdrawal/actualconsumption. LakeScrantonwater/pumpimprovementsconditional;coolingsystemtenant-specific/notchosen.55/45dBAdeveloperpromise notmeasurednoise.7wetlands/2streams/31waterbodies/2.25acrewetlandsare overlappinglandfeatures, notadditivecampusareas. Mine-spoiledlanddoesnotmeanhazardfree; noactualgroundwater/wildlifeharm inferred. CorporateoldWesternHospitalityPartners-Jermynname notsameascanceledKYproject.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://www.wvia.org/news/local/2026-01-08/no-tenant-yet-archbald-data-center-developer-answers-questions-about-project-applications-at-dep-meeting",
              "host": "wvia.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 28",
          "scope": "The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_dep_project_permit_review_not_physical_operation",
              "scope": "The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed."
            },
            "tracker_scope": {
              "project_id": "10000003",
              "project_and_permit_csv_read_together": true,
              "aggregate_status_not_every_permit_complete": true,
              "source_coordinates_not_promoted": true,
              "submitted_day_not_issued_day": true
            }
          },
          "notes": [
            "The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county",
              "host": "www.pa.gov",
              "published": "2025-12-22",
              "date": "2025-12-22",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Archbald · Lackawanna · Source context reviewed",
      "status_scope": "The current DEP tracker original project CSV identifies Project Gravity as project 10000003 and lists its permit review as under review. The related original permit CSV distinguishes individual issued, pending and not yet submitted items. Permit review underway describes the named new proposal regulatory account, not a final approval, physical construction or operating service. A submitted date is not an issuance day. Existing names, developer roles, quantities, location coordinates and jurisdiction wrappers are not changed.",
      "event_evidence": [
        {
          "date": "2025-12-22",
          "text": "Pennsylvania DEP published its Project Gravity informational meeting notice December 22, 2025. The notice scheduled a January 6, 2026 meeting and a comment deadline. A past scheduled date does not establish that the meeting occurred or that permits were approved.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county",
              "host": "www.pa.gov",
              "published": "2025-12-22",
              "date": "2025-12-22",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    },
    {
      "id": "triboro-industrial-park-jessup-olyphant-lackawanna-county-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Triboro Industrial Park / Triboro Commerce Park",
      "group": "proposed",
      "status": "Permit review underway",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Jessup / Olyphant",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county",
          "host": "wvia.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.48297,
        "lng": -75.62178,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.",
            "PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county",
              "host": "wvia.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "exact_named_dep_proposal_account_not_physical_commissioning",
              "scope": "The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."
            },
            "tracker_scope": {
              "project_id": "10000069",
              "original_project_and_related_permit_csv_read": true,
              "no_data_center_operation_inferred": true,
              "no_coordinate_or_role_promotion": true
            }
          },
          "notes": [
            "The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Jessup / Olyphant · Lackawanna · Source context reviewed",
      "status_scope": "The DEP row names Triboro Industrial Park with Jessup, Olyphant and Throop context. That agency context does not change the inherited project jurisdiction wrapper or establish a common physical phase for every tract. The original DEP project CSV lists the named project as under review, and its related original permit rows remain separate. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    },
    {
      "id": "wildcat-ridge-archbald-lackawanna-county-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Wildcat Ridge AI Data Center Campus",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lackawanna"
      ],
      "city": "Archbald",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash. PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county",
          "host": "wvia.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.39016,
        "lng": -75.63327,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "KatBolus WVIA April22,2026 originalPPLopenhouseinterviews/recordwork. Tribune/ErcorTriboro548acre/17.5MJunepropertypurchase/4buildingindustrial2027targetnotpaidDCcapexorITload. Map-basedinferenceconnectssite toPPLproject; utilityREFUSESnamingcustomers. No confirmedexactcustomerESA ornewparcelpin.10yearLERTAclaimnotabatementamount/receivedcash.",
            "PPLworksplanningindependentlyofcustomerlocalapprovals;2029/early2030transmissiontargetconditionalonPUC/permits, notDCcommissioning. Dedicatedcustomerfacilitiespaidbycustomer whileREGIONALRELIABILITYupgradesratebased, so no blankettaxpayer-freeclaim. WildcatRidgeexplicitconditional-useprocess/May14historicalhearing; notfinalapproval. Othercampushearing/datesnotfutureOctobercalendar. PPLroute notselectedatAprilmeeting.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.wvia.org/news/local/2026-04-22/ppl-electric-utilities-confirms-data-centers-spurred-transmission-project-in-lackawanna-county",
              "host": "wvia.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "exact_named_dep_proposal_account_not_physical_commissioning",
              "scope": "The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged."
            },
            "tracker_scope": {
              "project_id": "10000027",
              "original_project_and_related_permit_csv_read": true,
              "no_data_center_operation_inferred": true,
              "no_coordinate_or_role_promotion": true
            }
          },
          "notes": [
            "The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Archbald · Lackawanna · Source context reviewed",
      "status_scope": "The DEP row explicitly names Wildcat Ridge and Pine Line in Archbald. A named proposal and its current tracker account do not establish current construction or a power delivery milestone. The original DEP project CSV lists the named project as proposed with no applications received in that tracker account. This does not establish absence of every municipal or other agency application. The scoped label describes the documented proposal or permit account, not physical operation. Submission dates do not become issuance or construction dates. Existing corporate roles, legal identity, technical quantities and location references remain unchanged.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42069"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
