  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42089",
    "label": "Monroe County, Pennsylvania"
  },
  "records": [
    {
      "id": "depg-smithfield-gateway-data-center-monroe-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Smithfield Gateway Data Center",
      "group": "proposed",
      "status": "Application under review",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Monroe"
      ],
      "city": "East Stroudsburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Smithfield agency future hearing schedule and conditional-use limits. Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-10-28",
          "Scheduled event: A Smithfield Gateway conditional use hearing is scheduled to begin October 28, 2026 for party status and scheduling, according to the Township published October 21 procedural correspondence. The date remains future at this review and does not establish an accomplished hearing, substantive permit approval or construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://smithfieldtownship.com/odp/gatewaydc/",
          "host": "smithfieldtownship.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://smithfieldtownship.com/wp-content/uploads/2026/09/Smithfield-Gateway-Data-Center_Conditional-Use-Review-No.-2.pdf",
          "host": "smithfieldtownship.com",
          "published": "2026-09-11",
          "date": "2026-09-11",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf",
          "host": "smithfieldtownship.com",
          "published": "2026-10-21",
          "date": "2026-10-21",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.05822,
        "lng": -75.3396,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Smithfield agency future hearing schedule and conditional-use limits",
          "fields": {
            "agency": "Smithfield Township, Pennsylvania",
            "page_updated": "2026-10-07",
            "applicants": [
              "DEPG Mosier Associates LP",
              "DEPG of Shawnee II LP"
            ],
            "project": "Smithfield Gateway conditional use",
            "proposed_buildings": 1,
            "proposed_stories": 2,
            "proposed_area_sqft": 250000,
            "application_date": "2026-04-03",
            "resubmission_date": "2026-08-11",
            "scheduled_planning_recommendation_meeting": "2026-10-21T19:00:00-04:00",
            "scheduled_conditional_use_hearing": "2026-10-28T18:00:00-04:00",
            "scheduled_venue": "J.T. Lambert Intermediate School, 2000 Milford Road, East Stroudsburg, PA18301",
            "party_status_email_deadline_date": "2026-10-27"
          },
          "notes": [
            "Both meetings are future as of October 14 and subject to postponement if review deadline extended. Recommendation is separate from Board hearing. Conditional-use application is not land-development approval; final engineering and land development still required before construction. Older sketch phases are not approved additional data-center buildings. No hearing outcome, numeric IT MW or current operations inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://smithfieldtownship.com/odp/gatewaydc/",
              "host": "smithfieldtownship.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 27",
          "scope": "The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "dated_original_conditional_use_review_and_future_procedural_hearing",
              "scope": "The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here."
            },
            "source_read_scope": {
              "technical_review_pdf_pages_visually_read": [
                1,
                7
              ],
              "technical_noise_pages_text_read": [
                9,
                10
              ],
              "procedural_pdf_pages_visually_read": [
                1,
                2
              ],
              "future_hearing_not_accomplished": true,
              "applicant_legal_positions_not_adjudicated": true,
              "unrelated_navigation_strings_excluded": true
            }
          },
          "notes": [
            "The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://smithfieldtownship.com/wp-content/uploads/2026/09/Smithfield-Gateway-Data-Center_Conditional-Use-Review-No.-2.pdf",
              "host": "smithfieldtownship.com",
              "published": "2026-09-11",
              "date": "2026-09-11",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf",
              "host": "smithfieldtownship.com",
              "published": "2026-10-21",
              "date": "2026-10-21",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Stroudsburg · Monroe · Source context reviewed",
      "status_scope": "The Township published consulting engineer September 11, 2026 review explicitly concerns the named Smithfield Gateway data center conditional use application. October 21 published correspondence confirms agreement to open the October 28 hearing for party status and later scheduling, with substantive review to follow after revised plans and engineering review. Proposed records this active named application, not an issued conditional use approval, land development approval, a completed future hearing or current construction. Applicant counsel statements about legal rights and zoning effects are attributed positions, not court findings. Unrelated pharmacy strings in the captured website navigation are excluded; the original dated project PDFs are the evidence used here.",
      "event_evidence": [
        {
          "date": "2026-10-28",
          "text": "Scheduled event: A Smithfield Gateway conditional use hearing is scheduled to begin October 28, 2026 for party status and scheduling, according to the Township published October 21 procedural correspondence. The date remains future at this review and does not establish an accomplished hearing, substantive permit approval or construction.",
          "kind": "scheduled_event",
          "sources": [
            {
              "url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf",
              "host": "smithfieldtownship.com",
              "published": "2026-10-21",
              "date": "2026-10-21",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42089"
      }
    },
    {
      "id": "pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Caughbaugh Road Data Center (Pennsylvania Glacial Till site)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Monroe"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Overlay adoption is not all construction/environmental permits; the developer counsel acknowledged more reviews. Proposed closed-loop cooling and described noise limits are not measured operation. No 2026 opening, IT MW or new building count inferred, and the generic legal duty to allow DCs is not adopted as independent legal analysis. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay",
          "host": "fox56.com",
          "date": "2025-12-15",
          "published": "2025-12-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.07299,
        "lng": -75.35572,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WOLF reports a December 15 Tobyhanna overlay vote for the Pennsylvania Glacial Till property along Caughbaugh Road, separate from the December 11 Pocono Manor ordinance.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Overlay adoption is not all construction/environmental permits; the developer counsel acknowledged more reviews. Proposed closed-loop cooling and described noise limits are not measured operation. No 2026 opening, IT MW or new building count inferred, and the generic legal duty to allow DCs is not adopted as independent legal analysis.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay",
              "host": "fox56.com",
              "date": "2025-12-15",
              "published": "2025-12-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 29",
          "scope": "The DEP snapshot contains a different unnamed Pocono Manor Investors proposal in Tobyhanna. No exact applicant or parcel crosswalk to Pennsylvania Glacial Till and Caughbaugh Road was established. Local proximity does not establish identity or current physical stage. No identity, jurisdiction, provider role, status or location change is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "combined_or_different_project_row_or_current_legal_outcome_held",
              "scope": "The DEP snapshot contains a different unnamed Pocono Manor Investors proposal in Tobyhanna. No exact applicant or parcel crosswalk to Pennsylvania Glacial Till and Caughbaugh Road was established. Local proximity does not establish identity or current physical stage. No identity, jurisdiction, provider role, status or location change is adopted."
            }
          },
          "notes": [
            "The DEP snapshot contains a different unnamed Pocono Manor Investors proposal in Tobyhanna. No exact applicant or parcel crosswalk to Pennsylvania Glacial Till and Caughbaugh Road was established. Local proximity does not establish identity or current physical stage. No identity, jurisdiction, provider role, status or location change is adopted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Monroe · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42089"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}