{
  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42121",
    "label": "Venango County, Pennsylvania"
  },
  "records": [
    {
      "id": "bitfarms-scrubgrass-kennerdell-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Scrubgrass Generating Plant",
      "group": "proposed",
      "status": "AI redevelopment planned",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Venango"
      ],
      "city": "Kennerdell",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Potential operator development scale, not actual critical IT demand.. Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.",
      "date": "",
      "events": [
        [
          "2026-06-29",
          "Keel’s second-quarter filing reports that Bitcoin mining at Scrubgrass ceased on June 29, 2026 while energy sales continued. This closes the mining activity, not the entire power site; future HPC/AI development is separate."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/",
          "host": "exploreclarion.com",
          "date": "2026-06-02",
          "published": "2026-06-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.keelinfra.com/campuses/scrubgrass",
          "host": "keelinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a",
          "host": "ir.keelinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed primary filing"
        }
      ],
      "loc": {
        "lat": 41.40074,
        "lng": -79.75779,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "ExploreClarion describes Keel/Bitfarms Scrubgrass AI development opportunity alongside existing crypto/power activity.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Potential expansion, studies and behind-the-meter generation are not energized AI capacity. September2026 ash-removal deadline is not proof completion; issuer original sources reviewed separately.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.exploreclarion.com/local/2026/06/02/scrubgrass-could-become-areas-largest-ai-data-center-campus-866965/",
              "host": "exploreclarion.com",
              "date": "2026-06-02",
              "published": "2026-06-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Potential operator development scale, not actual critical IT demand.",
          "fields": {
            "operator_advertised_expansion_capacity_gw_up_to": 1.3,
            "advertised_site_acres": 650,
            "stage": "Long-term pre-development and power planning",
            "current_commissioned_hpc_capacity_mw": null
          },
          "notes": [
            "Scrubgrass page repeats project-update cards explicitly labelled Moses Lake or Sharon. Those concrete pours, piping and equipment deliveries are not Scrubgrass milestones. No project partners announced in this page.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.keelinfra.com/campuses/scrubgrass",
              "host": "keelinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "AI redevelopment planned",
              "basis": "Keel’s current Scrubgrass page describes pre-development and power planning for future HPC/AI infrastructure. Its signed second-quarter filing states that Scrubgrass Bitcoin mining ceased on June 29, 2026 while energy sales continued.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The mining cessation is not closure of the entire power site. Energy-generation capacity is not IT capacity, and the long-term expansion envelope is not operating AI service. The older Bitfarms label remains in identity history; no physical-site merge or provider-role promotion is made."
          },
          "notes": [
            "The mining cessation is not closure of the entire power site. Energy-generation capacity is not IT capacity, and the long-term expansion envelope is not operating AI service. The older Bitfarms label remains in identity history; no physical-site merge or provider-role promotion is made.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://www.keelinfra.com/campuses/scrubgrass",
              "host": "www.keelinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            },
            {
              "url": "https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a",
              "host": "ir.keelinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed primary filing"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kennerdell · Venango · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. Keel’s current Scrubgrass page describes pre-development and power planning for future HPC/AI infrastructure. Its signed second-quarter filing states that Scrubgrass Bitcoin mining ceased on June 29, 2026 while energy sales continued. The mining cessation is not closure of the entire power site. Energy-generation capacity is not IT capacity, and the long-term expansion envelope is not operating AI service. The older Bitfarms label remains in identity history; no physical-site merge or provider-role promotion is made.",
      "event_evidence": [
        {
          "date": "2026-06-29",
          "text": "Keel’s second-quarter filing reports that Bitcoin mining at Scrubgrass ceased on June 29, 2026 while energy sales continued. This closes the mining activity, not the entire power site; future HPC/AI development is separate.",
          "kind": "closed",
          "sources": [
            {
              "url": "https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a",
              "host": "ir.keelinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed primary filing"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42121"
      }
    },
    {
      "id": "nova-energy-cryptomine-frenchcreek-venango-county-pa",
      "state": "pa",
      "kind": "facility",
      "name": "Nova Energy Natural Gas-Powered Cryptomine (Frenchcreek Township)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Venango"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Preview only: original permit number, exact location, conditions and Bulletin not inspected. Air permit is not operating proof, all environmental approvals or executed utility service. No MW, actual water, investment, construction or current operation adopted; subscriber material not accessed or decoded. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://marcellusdrilling.com/2025/03/gas-fired-cryptocurrency-data-center-coming-to-venango-county-pa/",
          "host": "marcellusdrilling.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.41604,
        "lng": -79.77449,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "Public Marcellus Drilling News preview reports Pennsylvania DEP air-quality permit for Nova Energy LLC cryptocurrency data center, FrenchcreekTownship, VenangoCounty, announced inMarch1PennsylvaniaBulletin.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Preview only: original permit number, exact location, conditions and Bulletin not inspected. Air permit is not operating proof, all environmental approvals or executed utility service. No MW, actual water, investment, construction or current operation adopted; subscriber material not accessed or decoded.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://marcellusdrilling.com/2025/03/gas-fired-cryptocurrency-data-center-coming-to-venango-county-pa/",
              "host": "marcellusdrilling.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Venango · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42121"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
