{
  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42129",
    "label": "Westmoreland County, Pennsylvania"
  },
  "records": [
    {
      "id": "tecfusions-keystone-connect-upper-burrell-pa",
      "state": "pa",
      "kind": "facility",
      "name": "TECfusions Keystone Connect",
      "group": "proposed",
      "status": "Project listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Westmoreland"
      ],
      "city": "Upper Burrell Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice. LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/",
          "host": "publicsource.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
          "host": "gis.dep.pa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://tecfusions.com/wp-content/uploads/2025/11/KEYSTONE-CONNECT-FLYER.pdf",
          "host": "tecfusions.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 40.31081,
        "lng": -79.46689,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "MiaHollie PublicSource September3updated4,2026 originalUpperBurrellmeetingreport:180dayMaymoratorium reportedlyexpiresNovember2, but EXCLUDESpreviousBuildingJpermits. August5planapprovalcoversJinterior/mechanical/electricalalterations, notentire1400acre/3GWfuturecampus. PartialBuildingJliveclaimattributedtoTribLive/companyrelease, notindependentlyinspectedcurrentservice.",
            "LanduseappealProtectPT/residentsinWestmorelandCommonPleas ALLEGESspecialexceptionproceduremissing, notcourtwin/currentinjunction. Case number/unreadoriginalpleading/finaloutcomeunknown. Newdraftbaseloadgenerationrequirement notenactedlaw; September15reviewfutureinreportnotobservedoutcome. Moratoriumnotproofallcurrentworkillegal.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.publicsource.org/upper-burrell-data-center-transparency-backlash/",
              "host": "publicsource.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 28",
          "scope": "The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_keystone_development_with_aggregate_and_individual_permit_difference",
              "scope": "The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation."
            },
            "tracker_scope": {
              "project_id": "10000020",
              "aggregate_review_complete_does_not_clear_pending_related_row": true,
              "flyer_first_page_visually_read": true,
              "leasing_claim_not_commissioning": true
            }
          },
          "notes": [
            "The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterProjectTrackingAllProjects.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gis.dep.pa.gov/DataCenterPermitTracker/static/DataCenterPermitTracking.csv",
              "host": "gis.dep.pa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://tecfusions.com/wp-content/uploads/2025/11/KEYSTONE-CONNECT-FLYER.pdf",
              "host": "tecfusions.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Upper Burrell Township · Westmoreland · Source context reviewed",
      "status_scope": "The current DEP original project CSV identifies Keystone Connect as project 10000020 with aggregate DEP Review Complete wording, while its related original permit rows include a pending item as well as issued items. That aggregate label is not certified as every approval complete. The company flyer describes adaptive reuse development and claimed leasing and future deployment timing. Project listed development records the named proposal account, not verified live service, a completed conversion or delivery of its advertised capacity. The flyer file path month is not its publication date, and stock photographs do not establish current facility operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42129"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
