{
  "schema_version": 1,
  "source_compilation_context": {
    "pa": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/pa.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "42133",
    "label": "York County, Pennsylvania"
  },
  "records": [
    {
      "id": "ecp-york-2-energy-center-data-center-peach-bottom-york-pa",
      "state": "pa",
      "kind": "facility",
      "name": "York 2 Energy Center Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "York"
      ],
      "city": "Peach Bottom Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed five-billion-USD project and 2,500 construction jobs are forecasts. The power station's 828 MW generation is not data-center IT. The article's much smaller statewide investment figure is inconsistent and excluded. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/",
          "host": "cpbj.com",
          "date": "2025-07-21",
          "published": "2025-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.peachbottomtownship.org/2000-2",
          "host": "www.peachbottomtownship.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.91997,
        "lng": -76.72621,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Central Penn Business Journal reports an ECP plan for a data center at Calpine's York 2 Energy Center in Peach Bottom.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The proposed five-billion-USD project and 2,500 construction jobs are forecasts. The power station's 828 MW generation is not data-center IT. The article's much smaller statewide investment figure is inconsistent and excluded.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cpbj.com/5b-data-center-coming-to-york-county-energy-site/",
              "host": "cpbj.com",
              "date": "2025-07-21",
              "published": "2025-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 64",
          "scope": "The complete original Township page labels its May 21, 2026 data center ordinance a draft, says it was submitted for County review and expressly says no final action has been taken. This is a municipal policy account rather than an exact York 2 computing project disposition. A working gas power plant is not commissioned computing, and a draft ordinance does not establish approval, current construction or a legal prohibition. The linked complete draft remains unread.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_township_policy_draft_exact_york2_stage_held",
              "scope": "The complete original Township page labels its May 21, 2026 data center ordinance a draft, says it was submitted for County review and expressly says no final action has been taken. This is a municipal policy account rather than an exact York 2 computing project disposition. A working gas power plant is not commissioned computing, and a draft ordinance does not establish approval, current construction or a legal prohibition. The linked complete draft remains unread."
            },
            "source_read_scope": {
              "complete_original_draft_notice_body_read": true,
              "linked_full_draft_unread": true,
              "power_generation_not_computing_operation": true
            }
          },
          "notes": [
            "The complete original Township page labels its May 21, 2026 data center ordinance a draft, says it was submitted for County review and expressly says no final action has been taken. This is a municipal policy account rather than an exact York 2 computing project disposition. A working gas power plant is not commissioned computing, and a draft ordinance does not establish approval, current construction or a legal prohibition. The linked complete draft remains unread.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.peachbottomtownship.org/2000-2",
              "host": "www.peachbottomtownship.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Peach Bottom Township · York · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "42133"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
