{
  "schema_version": 1,
  "source_compilation_context": {
    "sc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/sc.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "45003",
    "label": "Aiken County, South Carolina"
  },
  "records": [
    {
      "id": "dc-blox-north-augusta-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DC BLOX North Augusta Hyper Edge Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Aiken"
      ],
      "city": "North Augusta",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NorthAugusta-specific section within4-site announcement. Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-11-14",
          "DC BLOX announced plans for a North Augusta hyperscale edge facility. This is the release date, not a construction start, opening or delivery date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
          "host": "dcblox.com",
          "date": "2024-11-14",
          "published": "2024-11-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/data-center-map/",
          "host": "www.dcblox.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.54447,
        "lng": -81.63447,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "NorthAugusta-specific section within4-site announcement",
          "fields": {
            "north_augusta_planned_anchor_power_mw": 5,
            "north_augusta_county_quote": "Aiken County, South Carolina",
            "power_basis": "dedicatedhyperscaleclientpower, not explicitIT"
          },
          "notes": [
            "Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "dcblox.com",
              "date": "2024-11-14",
              "published": "2024-11-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "DC BLOX announced the North Augusta development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "DC BLOX announced the North Augusta development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate."
            }
          },
          "notes": [
            "DC BLOX announced the North Augusta development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.dcblox.com/data-center-map/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check68, October24,2026",
          "scope": "The November 14, 2024 announcement identifies DC BLOX development at North Augusta. The named site remains distinct from Huntsville and Montgomery even though the same article covers all three. No tenant identity, current completion, location or power measure is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The November 14, 2024 announcement identifies DC BLOX development at North Augusta. The named site remains distinct from Huntsville and Montgomery even though the same article covers all three. No tenant identity, current completion, location or power measure is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The November 14, 2024 announcement identifies DC BLOX development at North Augusta. The named site remains distinct from Huntsville and Montgomery even though the same article covers all three. No tenant identity, current completion, location or power measure is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "North Augusta · Aiken · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-11-14",
          "text": "DC BLOX announced plans for a North Augusta hyperscale edge facility. This is the release date, not a construction start, opening or delivery date.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45003"
      }
    },
    {
      "id": "meta-aiken-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Meta Aiken Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Aiken"
      ],
      "city": "Graniteville",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-08-29",
          "The South Carolina governor announced the Meta Aiken development in Sage Mill Industrial Park with a future service target. This is the publication date, not an opening or construction start day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
          "host": "governor.sc.gov",
          "date": "2024-08-29",
          "published": "2024-08-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/us-locations/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Aiken-Data-Center.pdf",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.56742,
        "lng": -81.65952,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "development_announcement_date": "2024-08-29",
            "planned_investment_usd": 800000000,
            "expected_operational_jobs": 100,
            "planned_data_center_area_sqft": 715000,
            "operation_target": "spring2027",
            "published_location": "Sage Mill Industrial Park,AikenCounty,SouthCarolina"
          },
          "notes": [
            "Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
              "host": "governor.sc.gov",
              "date": "2024-08-29",
              "published": "2024-08-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 3",
          "scope": "The South Carolina governor announced the Meta Aiken development on August 29, 2024 with a spring 2027 operating target. The present Meta fleet page reports a groundbreaking year only. Neither establishes commissioning, an exact construction start day or the present physical stage. Renewable matching and planned certification are not measured site effects.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The South Carolina governor announced the Meta Aiken development on August 29, 2024 with a spring 2027 operating target. The present Meta fleet page reports a groundbreaking year only. Neither establishes commissioning, an exact construction start day or the present physical stage. Renewable matching and planned certification are not measured site effects."
            }
          },
          "notes": [
            "The South Carolina governor announced the Meta Aiken development on August 29, 2024 with a spring 2027 operating target. The present Meta fleet page reports a groundbreaking year only. Neither establishes commissioning, an exact construction start day or the present physical stage. Renewable matching and planned certification are not measured site effects."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
              "host": "governor.sc.gov",
              "published": "2024-08-29",
              "date": "2024-08-29",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://datacenters.atmeta.com/us-locations/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check70, October24,2026",
          "scope": "The original Meta Aiken brochure identifies its planned Aiken data center as future global infrastructure. Developer per source means the named project proponent, not a construction contractor or legal property title. Its words will be part and once completed do not certify present operation. PDF creation metadata is not a publication, opening or commissioning day. Publication day remains unknown. Energy and water cost pledges, future restoration goals and job forecasts are attributed company statements and are not adopted as measured outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original Meta Aiken brochure identifies its planned Aiken data center as future global infrastructure. Developer per source means the named project proponent, not a construction contractor or legal property title. Its words will be part and once completed do not certify present operation. PDF creation metadata is not a publication, opening or commissioning day. Publication day remains unknown. Energy and water cost pledges, future restoration goals and job forecasts are attributed company statements and are not adopted as measured outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original Meta Aiken brochure identifies its planned Aiken data center as future global infrastructure. Developer per source means the named project proponent, not a construction contractor or legal property title. Its words will be part and once completed do not certify present operation. PDF creation metadata is not a publication, opening or commissioning day. Publication day remains unknown. Energy and water cost pledges, future restoration goals and job forecasts are attributed company statements and are not adopted as measured outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Aiken-Data-Center.pdf",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Graniteville · Aiken · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-08-29",
          "text": "The South Carolina governor announced the Meta Aiken development in Sage Mill Industrial Park with a future service target. This is the publication date, not an opening or construction start day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
              "host": "governor.sc.gov",
              "published": "2024-08-29",
              "date": "2024-08-29",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45003"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
