{
  "schema_version": 1,
  "source_compilation_context": {
    "sc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/sc.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "45029",
    "label": "Colleton County, South Carolina"
  },
  "records": [
    {
      "id": "eagle-rock-rhodes-technology-park-colleton-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Rhodes Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Colleton"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/",
          "host": "live5news.com",
          "date": "2026-09-22",
          "published": "2026-09-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.86636,
        "lng": -80.66888,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "WCSC reports a Rhodes Technology Park information session after overlay passage, with the development agreement and energy studies pending.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/",
              "host": "live5news.com",
              "date": "2026-09-22",
              "published": "2026-09-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Colleton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45029"
      }
    },
    {
      "id": "project-boulder-colleton-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Project Boulder",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Colleton"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.scelp.org/news/colleton-data-center",
          "host": "scelp.org",
          "date": "2026-03-06",
          "published": "2026-03-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.colletoncounty.org/sites/default/files/uploads/minutes/12-1-25-regular-meeting-minutes.pdf",
          "host": "www.colletoncounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.89034,
        "lng": -80.69506,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "SCELP describes Thomas and Hutton/Eagle Rock's proposed Colleton campus and need for a special exception, with a hearing not yet scheduled in its account.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.scelp.org/news/colleton-data-center",
              "host": "scelp.org",
              "date": "2026-03-06",
              "published": "2026-03-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "All three physical pages of the original December 1, 2025 Council minutes were actually viewed. They record executive session economic development discussion that names Project Boulder and explicitly state that no action was taken during executive session. The minutes were approved January 5, 2026. The selected minutes do not independently identify a computing component, exact operator, later physical stage, project approval or current local restriction. The codename alone does not establish an exact computing project crosswalk. Current disposition remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_boulder_economic_session_exact_computing_stage_held",
              "scope": "All three physical pages of the original December 1, 2025 Council minutes were actually viewed. They record executive session economic development discussion that names Project Boulder and explicitly state that no action was taken during executive session. The minutes were approved January 5, 2026. The selected minutes do not independently identify a computing component, exact operator, later physical stage, project approval or current local restriction. The codename alone does not establish an exact computing project crosswalk. Current disposition remains held."
            },
            "source_read_scope": {
              "all_three_original_minute_physical_pages_actually_viewed": true,
              "no_ocr_or_indexed_text_substitution": true,
              "executive_session_no_action_explicit": true,
              "minute_approval_day_not_project_approval": true,
              "no_exact_computing_identity_or_current_stage_inferred": true
            }
          },
          "notes": [
            "All three physical pages of the original December 1, 2025 Council minutes were actually viewed. They record executive session economic development discussion that names Project Boulder and explicitly state that no action was taken during executive session. The minutes were approved January 5, 2026. The selected minutes do not independently identify a computing component, exact operator, later physical stage, project approval or current local restriction. The codename alone does not establish an exact computing project crosswalk. Current disposition remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.colletoncounty.org/sites/default/files/uploads/minutes/12-1-25-regular-meeting-minutes.pdf",
              "host": "www.colletoncounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Colleton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45029"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
