  "schema_version": 1,
  "source_compilation_context": {
    "sc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/sc.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "45087",
    "label": "Union County, South Carolina"
  },
  "records": [
    {
      "id": "genesis-digital-assets-union-lockhart-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Genesis Digital Assets Union-Lockhart Bitcoin Mining Data Centers",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Union"
      ],
      "city": "Lockhart",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/",
          "host": "scbiz.com",
          "date": "2023-08-01",
          "published": "2023-08-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.6901,
        "lng": -81.61891,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "SCBiz reports Genesis's Anderson site opened in February 2023 and two Union or Lockhart sites ran from March 2023.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/",
              "host": "scbiz.com",
              "date": "2023-08-01",
              "published": "2023-08-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lockhart · Union · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45087"
      }
    },
    {
      "id": "volt-edge-project-alpaca-union-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Project Alpaca (Midway Green Industrial Park)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Union"
      ],
      "city": "Union",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original participant/economic-development presentation for proposal and claims, not independent performance validation.. Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation. USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts. Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established. Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset. A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf",
          "host": "gearupunionsc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gearupunionsc.com/public-notices/",
          "host": "gearupunionsc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Public-Hearing-Ordinance-413_Project-Alpaca.docx.pdf",
          "host": "gearupunionsc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.70482,
        "lng": -81.63498,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round39-2026-10-14.json",
          "scope": "Original participant/economic-development presentation for proposal and claims, not independent performance validation.",
          "fields": {
            "issuer_presentation_date": "2026-04",
            "issuer_proposed_fixed_asset_investment_usd": 410000000,
            "issuer_proposed_permanent_jobs_lower_bound": 50,
            "issuer_proposed_construction_jobs_lower_bound": 500,
            "issuer_mw_label": 49,
            "issuer_mw_basis": "Presentation says existing transmission and generation capacity, not explicitly criticalIT",
            "critical_it_mw": null,
            "issuer_construction_target": "2026",
            "issuer_operating_target": "2027/2028",
            "executed_utility_agreement_verified": false,
            "incentive_award_verified": false
          },
          "notes": [
            "Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation.",
            "USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts.",
            "Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established.",
            "Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset.",
            "A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf",
              "host": "gearupunionsc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_hosted_named_alpaca_proposal",
              "scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings."
            },
            "source_read_scope": {
              "original_current_public_notice_index_selected_alpaca_rows_read": true,
              "original_presentation_selected_physical_pages1_through3_text_read": true,
              "not_entire_four_page_presentation_visual_review": true,
              "complete_original_linked_single_page_notice_text_read": true,
              "current_index_cancellation_and_historical_notice_conflict_retained": true,
              "no_actual_hearing_vote_or_cancellation_day_invented": true,
              "no_promotional_resource_or_benefit_claim_as_measured_result": true
            }
          },
          "notes": [
            "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://gearupunionsc.com/public-notices/",
              "host": "gearupunionsc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf",
              "host": "gearupunionsc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Public-Hearing-Ordinance-413_Project-Alpaca.docx.pdf",
              "host": "gearupunionsc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Union · Union · Source context reviewed",
      "status_scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45087"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}